BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 | A | PASS |
Tony Young
|
|
|
peter; Phone #: ###-####,, final ok
|
DOC - Permit Finaled | 6/29/2010 | 6/29/2010 | 6/29/2010 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Conference | 6/25/2010 | 6/25/2010 | 6/28/2010 | P | PASS |
Tony Young
|
|
|
peter; Phone #: ###-####
|
BLD-Grading Inspection | 6/28/2010 | 6/28/2010 | 6/28/2010 | A | BOND |
Terry Records
|
|
|
The rough grading has been completed at the above mentioned address. However, revegetation and a drainage channel along the driveway have not been completed. For this the engineer has recommended a bond of $1,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Conference | 6/14/2010 | 6/14/2010 | 6/15/2010 | P | PART |
Tony Young
|
|
|
roy - please call 1/2 hr prior Phone #: ###-####,, conf on final,, NOTE::will need fire approval on driveway
|
BLD-Energy code compliance | 4/14/2010 | 4/15/2010 | 4/15/2010 | A | PASS |
Tony Young
|
|
|
Ian Phone #: ###-####
|
BLD-Framing/Rough-in | 4/14/2010 | 4/14/2010 | 4/14/2010 | P | PASS |
Tony Young
|
|
|
Ian Phone #: ###-####
|
BLD-Framing/Rough-in | 4/9/2010 | 4/12/2010 | 4/12/2010 | P | FAIL |
Tony Young
|
|
|
travis Phone #: ###-#### correction posted,, ok to insulate
|
BLD-Other | 3/8/2010 | 3/9/2010 | 3/9/2010 | A | PART |
Tony Young
|
|
|
IAN Phone #: ###-####,, exterior ok
|
BLD-Footing | 2/1/2010 | 2/2/2010 | 2/2/2010 | A | PART |
Tony Young
|
|
|
Hyrum Phone #: ###-#### work in progress,, okay
|
BLD-Footing | 1/28/2010 | 1/29/2010 | 1/29/2010 | P | PASS |
Tony Young
|
|
|
Hyrum-as late as possible please Phone #: ###-####
|
PubWorks Subgrade Approval | 1/22/2010 | 1/22/2010 | 1/22/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 1/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 12/15/2009 | | |
|
|
|
|
OVERRIDE | | | 12/15/2009 | | |
|
|
|
|
OVERRIDE | | | 12/15/2009 | | |
|
|
|
|
OVERRIDE | | | 12/15/2009 | | |
|
|
|
|
OVERRIDE | | | 12/15/2009 | | |
|
|
|
|
Plan assigned to (CDM) | 11/17/2009 | 11/17/2009 | 12/15/2009 | | DONE |
Carl D Madsen
|
|
|
|
Routing - Erosion and Sediment | 12/14/2009 | | 12/15/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00744
|
Routing - PLAN CHECK | 12/15/2009 | | 12/15/2009 | | PASS |
Carl D Madsen
|
|
|
Carl M.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/15/2009 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2009 | | DONE |
Barbara Stitt
|
|
|
|
Override - People Holds | | | 12/15/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 12/15/2009 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 12/15/2009 | | DONE |
Barbara Stitt
|
|
|
Called and told Candy Coltrin that permit is ready & fees due///12/15/09 @ 1:30pm BAS
|
Route to Impact Fee Review | 11/17/2009 | 11/20/2009 | 12/3/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | | | 11/30/2009 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 11/24/2009 | | 11/30/2009 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 11/30/2009 | | |
Carl D Madsen
|
|
|
|
Routing - FIRE | 11/23/2009 | | 11/24/2009 | | PASS |
Scott Arellano
|
|
|
The location of the structure on the property does not comply with IFC section 503.1.1. for fire department vehicle access. A fire sprinkler system will be required, and designed in accordance with NFPA 13D and BMC. A seperate fire sprinkler permit will be required.
|
Routing - Erosion and Sediment | 11/20/2009 | | 11/23/2009 | | FAIL |
Steven Webb
|
|
|
RP listed on the application is not certified and a contractor is listed.
|
Routing - PUBLIC WORKS | | | 11/20/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 11/20/2009 | | 11/20/2009 | | PASS |
Colleen T Carroll
|
|
|
|
Routing PW Grading-Hillside | 11/19/2009 | | 11/20/2009 | | PASS |
Terry Records
|
|
|
|
Routing - Addressing | 11/17/2009 | | 11/19/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 11/17/2009 | 11/17/2009 | | DONE |
Tisha Gallop
|
|
|
|