Permit Information
Permit NumberBLD09-02094
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC13687
ePlanReviewNo
Description
Micron Building #80 (C13687) - Install AMAT Inspection - To move approximately 12 lineal feet of existing south interior partition wall and an existing 3070 door approximately 9 feet to the north. This will reduce the area of KLA Chase 106F and create an area for new equipment. New steel structure will be installed below the raised floor, attached to the concrete waffel floor, to support the new equipment. This permit also includes related electrical, mechanical, floor and ceiling grid modifications. This work is being done on the first floor of Building #80 between grid lines #5 & #6 and #F & # G. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 1/1/20111/28/2013 DONE
Third Notice 6/10/20106/24/2010 DONE
faxed
Third Notice 4/12/20105/27/2010 DONE
faxed
Third Notice 3/15/20103/29/2010 DONE
faxed
Second Notice 3/5/20103/10/2010 DONE
First Notice2/18/20102/18/20102/23/2010 DONE
DetailsJim Storey
BLD-Final2/16/20102/18/20102/18/2010APASS
DetailsJim Storey
Inspection requested from web by: Wayne Berry Phone #: ###-####--Jim please verify if Plumbing permit was required or taked out due to valuation-Thanks
DOC - Permit Finaled2/18/20102/18/20102/18/2010PPASS
DetailsJim Storey
DOC - Permit Finaled2/18/20102/18/20102/18/2010PPASS
DetailsJim Storey
BLD-Final2/10/20102/11/20102/11/2010ANR
DetailsJim Storey
2 of 2 for Thursday Inspection requested from web by: Wayne Berry Phone #: ###-#### need to resolve plm permit and sign off.
FIRE-Final Inspection2/9/20102/10/20102/10/2010PPASS
DetailsForrest France
Fire life safety finaled.
Plan assigned from Web11/23/2009 11/25/2009 DONE
DetailsJohn Menard
Plan assigned to (JCM)11/24/2009 11/25/2009 PASS
DetailsJohn Menard
11/25/2009 13:15:08 JCM - activity updated through activity BLDA022 from case BLD09-02094.
Routing - PLAN CHECK11/24/2009 11/25/2009 PASS
DetailsJohn Menard
Reviewed and approved plans at the Micron site 11/24/09. JCM
Routing - FIRE11/25/2009 11/25/2009 PASS
DetailsScott Arellano
Final approval will be subject to satisfactory field inspection by the PDS Fire inspector.
1st review completed  11/25/2009 PASS
Routing - PLAN CHECK11/25/2009 11/25/2009 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  11/25/2009 DONE
DetailsJohn Menard
CHANGE STATUS TO (ISS)  11/25/2009 DONE
DetailsTisha Gallop
change to issued status per JCM
Permit Ready to Issue  11/25/2009 DONE
DetailsTisha Gallop
CHANGE STATUS TO (ISS)  11/25/2009 DONE
DetailsTisha Gallop
Application received  11/23/2009 DONE
This permit was created on the web by Jack Fieselman