Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD09-02104
StatusFinaled
Name BUCKLE
Site Address 350 N MILWAUKEE AVE Unit: 1089
Project NameBTS - #1089
Customer Number 
ePlanReviewNo
Description
(BUCKLE - BOISE TOWNE SQUARE - SPACE 1089) To remodel an existing 4,829 square foot retail tenant space for a new retail tenant. Work to include: [installation of interior non-bearing partition walls to create, a stockroom, a sales area, 8 fitting rooms, separate sex accessible restrooms, an office, and an exiting hallway], installation of new flooring throughout, construction of a new storefront system, installation of suspended ceiling system per CISCA 0-2, installation of suspended gypsum board ceiling, new lighting, new ducts and diffusers, and interior finishes in compliance with ch. 8 of the 2006 IBC. This building is fully fire sprinklerd any alterations to the sprinkler system shall be maintained per NFPA #13 as regulated by the fire department, The smoke evacuation system shall remain operational as originally installed under the 1985 UBC. The design, testing and utilization of industrial steel storage racks shall be in accordance with the RMI Specification for the Design, Testing and Utilization of Industrial Steel Storage Racks. Any racks installed that exceed 8 ft. in height require a separate permit. MALL STOREFRONT SIGNAGE REQUIRES A SEPARATE PERMIT. **TLW** 6-8-10 FINAL CERT OF VALUE PER GC $ 248,155.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/9/20106/7/2010 DONE
Second Notice 5/20/20106/4/2010 DONE
First Notice 5/3/20105/10/2010 DONE
Permanent Occupancy  4/23/2010  
BLD-Final4/22/20104/22/20104/22/2010PPASS
DetailsMike Jordan
Andy Phone #: ###-####. ok for perm occ.
BLD-Final4/20/20104/21/20104/21/2010APART
DetailsMike Jordan
Andy Phone #: ###-####. Need RFI from enginner of record approving modifications to roll up gate framing. Everytrhing else ok.
FIRE-Final Inspection4/20/20104/21/20104/21/2010APASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection4/20/20104/20/20104/20/2010PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Alarm Testing4/20/20104/20/20104/20/2010PPASS
DetailsTroy Cobbley
The smoke evacuation system functioned correctly.
BLD-Framing/Rough-in4/9/20104/12/20104/12/2010PPASS
DetailsMike Jordan
ceiling\\late PM Phone #: ###-####
BLD-Framing/Rough-in3/17/20103/18/20103/18/2010APASS
DetailsMike Jordan
andy Phone #: ###-####. Framing at storefront and harlid areas ok. Structure for roll up gate not per aproved plans. Will need RFI from engineer for acceptance before occupancy.
BLD-Framing/Rough-in3/16/20103/17/20103/17/2010PNR
DetailsMike Jordan
As late as possible-Andy Steel stud framing inspection Phone #: ###-####. Needs elec and fire sprinkler rough in inspections.
BLD-Framing/Rough-in3/10/20103/11/20103/11/2010PPASS
DetailsMike Jordan
Andy-Come in loading area #3 between Dillards & Sears bottom floor Phone #: ###-####. Interior framed walls and hardlids only.
Issue PAID IN FULL permit  2/18/2010 DONE
DetailsTisha Gallop
Plan resubmittals received  1/28/2010  
DetailsTim L. Woodard
rec'd three copies for sheets T1; A6; A6a; A6b; S0; S1; S2; and three copies os calcs - taken to Tim W
PLANS/APPL TAKEN TO FRONT DESK  1/25/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  1/25/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  1/25/2010 DONE
Telephone call  1/25/2010 DONE
Details
left vm for cindy at ###-#### - permit ready and fees given -also need gc name and rce#
Permit Ready to Issue  1/25/2010 DONE
Details
Plan assigned to (TLW)11/24/2009 1/25/2010 PASS
DetailsTim L. Woodard
1/25/2010 11:45:13 TLW - activity updated through activity BLDA022 from case BLD09-02104.
Routing - PLAN CHECK12/14/2009 1/25/2010 PASS
DetailsTim L. Woodard
Resubmittals Recieved addressing corrections required. Plans approved as resubmitted. TLW
Plan resubmittals received  1/19/2010  
DetailsTim L. Woodard
Rec'd three copies of sheets- TI; D1; A1; A2; A3; A4; A6; A6a; A6b; A8; A9a; M1; ES1; E1; E2; taken to Tim W
Routing PW Sewer Rating12/14/2009 12/14/2009 PASS
DetailsConnie Baumgartner
1st review completed  12/14/2009 FAIL
DetailsTim L. Woodard
Failed plan review. TLW
Routing - PUBLIC WORKS12/11/2009 12/14/2009 PASS
DetailsBeverly Hall
Routing - Addressing12/11/2009 12/11/2009 PASS
DetailsApril Wing
Routing - PLAN CHECK11/24/2009 12/11/2009 FAIL
DetailsTim L. Woodard
Refer to plan review Report. TLW
Application received 11/24/200911/24/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  11/24/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  11/24/2009 DONE
DetailsTisha Gallop