Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD09-02136
StatusFinaled
Name MICHAEL MCGUINNESS
Site Address 409 S 8TH ST Unit: 103
Project Name 
Customer Number 
ePlanReviewNo
Description
**(8th Street Bistro)** Application for inspection to determine requirements for issuance of a Certificate of Occupancy for an existing 1425 sq ft restaurant. NO NEW WORK IS AUTHORIZED UNDER THIS PERMIT. This tenant space was formerly occupied by the "Chef Lou's" Under BLD07-02305. There is no change in use or occupancy under this permit. TLW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/14/200912/15/200912/15/2009PPASS
DetailsDave Hannah
Mike Phone #: ###-#### ok for perm occ
Permanent Occupancy  12/15/2009 DONE
FIRE-Final Inspection12/11/200912/14/200912/14/2009PPASS
DetailsForrest France
C/N items done, fire life safety passed.
FIRE-Final Inspection12/9/200912/9/200912/9/2009PFAIL
DetailsForrest France
Missing max. occupant load sign, provide one "K class" extinguisher for the kitchen, post suite address numbers, remove surface mounted hasp locks at three locations, provide certification of a current annual inspection for the fire sprinkler system, the type one hood suppression system needs modification to properly cover new appliance layout (permit required for modifications). See list of general conditions on permit documents for details.
Print Occupancy Form  12/9/2009 DONE
Permit Ready to Issue  12/9/2009 DONE
Telephone call  12/9/2009 DONE
DetailsBarbara Stitt
Called Mike and told him that permit is ready for pick up///12-9-09 @ 9:06am BAS
Issue PAID IN FULL permit  12/9/2009 DONE
DetailsTisha Gallop
Routing - PLAN CHECK12/8/2009 12/8/2009 PASS
DetailsTim L. Woodard
1st review completed  12/8/2009 DONE
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/8/2009 DONE
DetailsTim L. Woodard
Plan assigned to (TLW)12/1/2009 12/8/2009 PASS
DetailsTim L. Woodard
12/8/2009 16:03:19 TLW - activity updated through activity BLDA022 from case BLD09-02136.
Routing PW Sewer Rating12/4/2009 12/8/2009 PASS
DetailsConnie Baumgartner
Connie hand delivered approved plans and signed off on Public Works Review Sheet. TLW
Routing PW Environmental12/7/2009 12/8/2009 PASS
DetailsWalt Baumgartner
Upgrade to meet code for suitable and adequate grease abatement will be required with any new work authorized in the future under building dept permits.
Routing PW Sewer Rating12/7/2009 12/7/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing12/7/2009 12/7/2009 PASS
DetailsApril Wing
Case Summary (BLD)  12/4/2009 DONE
DetailsTim L. Woodard
Routing - PLAN CHECK12/1/2009 12/4/2009 PASS
DetailsTim L. Woodard
Plans approved. TLW
Plans ACCEPTED BY PLAN TECH  12/1/2009 DONE
First Notice 12/25/2009   
Application received 12/1/2009