Third Notice | | 4/30/2010 | 4/21/2010 | | DONE |
|
|
|
|
Third Notice | | 3/30/2010 | 4/16/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 3/20/2010 | 3/25/2010 | | DONE |
|
|
|
|
First Notice | | 3/5/2010 | 3/10/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Jim Sly
|
|
|
Jack Matt ###-#### Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Other | 2/2/2010 | 2/2/2010 | 2/2/2010 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-#### Grid OK.
|
FIRE-Conference | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | DONE |
Troy Cobbley
|
|
|
I went over life safety requirements with Matt.
|
BLD-Framing/Rough-in | 1/29/2010 | 1/29/2010 | 1/29/2010 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 1/28/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/14/2010 | 1/14/2010 | 1/20/2010 | | PASS |
Carl Westfall
|
|
|
1/20/2010 15:17:28 CJW - activity updated through activity BLDA022 from case BLD09-02149.
|
Routing - PLAN CHECK | 1/14/2010 | | 1/20/2010 | | PASS |
Carl Westfall
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/20/2010 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 1/20/2010 | | DONE |
Tisha Gallop
|
|
|
plan mod ready
|
Telephone call | | | 1/20/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Stan Cole plan mod is ready and fees due.
|
BLD-Framing/Rough-in | 1/14/2010 | 1/14/2010 | 1/14/2010 | P | PART |
Jim Sly
|
|
|
matt Phone #: ###-#### 2nd layer 2hr wall OK
|
BLD-Framing/Rough-in | 1/13/2010 | 1/13/2010 | 1/14/2010 | P | PART |
Jim Sly
|
|
|
Matt Phone #: ###-#### Back layer of 2hr wall....OK
|
Plan Modification Accepted | | | 1/14/2010 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld09-02149 (Master Lee's Taekwondo). Changes are (1) door replaced with opening, (2) Dropped ceilig with lighting at storage, lessons. Submitted on plan sheets A2.0, A5.0, E1.0; routed to Carl Westfall.
|
BLD-Framing/Rough-in | 1/5/2010 | 1/6/2010 | 1/6/2010 | P | PART |
Jim Sly
|
|
|
Matt Phone #: ###-#### OK to cover interior walls except area that needs a door opening (at hallway)....that is shown on approved plan. Need to reinspect door opening and inspect 2 hr wall.
|
Permit Ready to Issue | | | 12/31/2009 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/31/2009 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/4/2009 | | 12/29/2009 | | PASS |
Carl Westfall
|
|
|
12/29/2009 08:14:56 CJW - activity updated through activity BLDA022 from case BLD09-02149.
|
Routing - PLAN CHECK | 12/18/2009 | | 12/29/2009 | | PASS |
Carl Westfall
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2009 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/29/2009 | | DONE |
|
|
|
|
Telephone call | | | 12/29/2009 | | DONE |
|
|
|
12-28-09 called Stan Cole permit ready and fee given Also need ACHD ///DLD
|
Plan resubmittals received | | | 12/24/2009 | | |
Carl Westfall
|
|
|
rec'd two copies of sheets A0.0; A1.0; A2.0; A3.0; A4.0; A5.0; A6.0; E1.0; E2.0; taken to carl w
|
Route to Impact Fee Review | 12/17/2009 | 12/22/2009 | 12/21/2009 | | PASS |
Cindy M. Gould
|
|
|
tenant improvement no impact fees
|
Routing - FIRE | 12/17/2009 | 12/17/2009 | 12/18/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/18/2009 | | FAIL |
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 12/7/2009 | | 12/17/2009 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on December 11, 2009 and was finished on December 7, 2009. Revised drawings were required. See the plan review report. The drawings were in Plan Review a total of 9 work days.
|
Routing - PUBLIC WORKS | 12/4/2009 | | 12/7/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 12/7/2009 | | 12/7/2009 | | PASS |
Cody Riddle
|
|
|
Cody Riddle - Change in use from retail to assembly - original approval under CUP02-00108
|
Routing PW Sewer Rating | 12/7/2009 | | 12/7/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Pending Assignment by JCB | 12/3/2009 | | 12/4/2009 | | DONE |
Jason Blais
|
|
|
|
Plan Reviewer's activity | | | 12/4/2009 | | DONE |
Jason Blais
|
|
|
Sent e-mail to Stan Cole letting him know verification of approval from ACHD is required to be submitted to the Permit Counter before the permit can be issued. It is a change in use.
|
Routing - Addressing | 12/4/2009 | | 12/4/2009 | | PASS |
April Wing
|
|
|
|
Application received | | 12/3/2009 | 12/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/3/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/3/2009 | | DONE |
Tisha Gallop
|
|
|
|