Second Notice | | 5/21/2011 | 5/25/2011 | | DONE |
Christina Prado
|
|
|
mailed 5/26/2011. Received 6/2/11
|
First Notice | 5/6/2011 | 5/6/2011 | 5/11/2011 | | DONE |
Jim Sly
|
|
|
|
BLD-Final | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Jim Sly
|
|
|
cole please call 30 min before going out Phone #: ###-####
|
DOC - Permit Finaled | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 5/6/2011 | 5/6/2011 | 5/6/2011 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I noted that two of the three exit doors had broken hardware. Per Cole the doors and hardware will be replaced this summer. Door hardware to be maintianed per IFC 1028.
|
FIRE-Final Inspection | 5/3/2011 | 5/3/2011 | 5/3/2011 | P | FAIL |
Troy Cobbley
|
|
|
No approved plans on site for the inspection. Noted two panic/crash bars on two doors exit doors are broken and the pathway outside of the southeast exit is blocked with kitchen and hvac equipment.
|
BLD-Final | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | NR |
Jim Sly
|
|
|
Paul-PLease call at least 30 mins prior to inspection Phone #: ###-#### Need Fire and Electr finals.
|
BLD-Final | 3/10/2011 | 3/11/2011 | 3/11/2011 | P | DONE |
Jim Sly
|
|
|
Boris phone WIP
|
BLD-Final | 3/9/2011 | 3/9/2011 | 3/10/2011 | P | CANC |
Jim Sly
|
|
|
Boris phone Re-sched.....
|
BLD-Final | 3/8/2011 | 3/9/2011 | 3/9/2011 | A | NH |
Jim Sly
|
|
|
Called Boris again .....no return call...No tele # for Church
|
BLD-Final | 3/4/2011 | 3/8/2011 | 3/8/2011 | A | PEND |
Jim Sly
|
|
|
Called Boris.....no return call.
|
BLD-Aging Inspection | 3/1/2011 | 3/1/2011 | 3/4/2011 | | CANC |
Jim Sly
|
|
|
|
BLD-Framing/Rough-in | 11/17/2010 | 11/18/2010 | 11/18/2010 | A | PASS |
Jim Sly
|
|
|
boris Phone #: ###-####
|
BLD-Framing/Rough-in | 11/16/2010 | 11/16/2010 | 11/17/2010 | P | PASS |
Jim Sly
|
|
|
Lance phone
|
BLD-Conference | 11/15/2010 | 11/16/2010 | 11/16/2010 | A | DONE |
Jim Sly
|
|
|
lance Phone #: ###-#### Discussed framing issues.
|
BLD-Footing | 10/25/2010 | 10/26/2010 | 10/26/2010 | A | PASS |
Jim Sly
|
|
|
borris Phone #: ###-#### No special insp req.....OK
|
Issue PAID IN FULL permit | | | 4/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Change Expiration Date Only | | | 4/22/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/7/2010 | | 4/7/2010 | | PASS |
Tim L. Woodard
|
|
|
Approved with comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 4/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 4/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 4/7/2010 | | DONE |
|
|
|
left vm for david at ###-#### - permit ready and fees given - also need gc name
|
Permit Ready to Issue | | | 4/7/2010 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 12/9/2009 | | 4/7/2010 | | PASS |
Tim L. Woodard
|
|
|
4/7/2010 08:28:09 TLW - activity updated through activity BLDA022 from case BLD09-02180.
|
Plan resubmittals received | | | 3/30/2010 | | |
Tisha Gallop
|
|
|
received two copies of plan sheets A-2, A-3, S-1; taken to Tim Woodard
|
Plan resubmittals received | | | 2/8/2010 | | DONE |
|
|
|
RECEIVED 2 COPIES OF SHEET A-2,A-3,S-1 TAKEN TO TIM W.
|
Routing - PLAN CHECK | 12/9/2009 | | 12/16/2009 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review report. TLW
|
Routing - FIRE | 12/16/2009 | | 12/16/2009 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 12/16/2009 | | FAIL |
Tim L. Woodard
|
|
|
Refer to plan review comments.
|
Application received | | 12/9/2009 | 12/9/2009 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/9/2009 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/9/2009 | | DONE |
Tisha Gallop
|
|
|
|