Case Summary (BLD) | | | 3/7/2011 | | |
|
|
|
|
Third Notice | | 11/28/2010 | 11/23/2010 | | DONE |
|
|
|
|
Second Notice | | 11/25/2010 | 11/23/2010 | | DONE |
|
|
|
|
First Notice | | 10/23/2010 | 11/15/2010 | | DONE |
|
|
|
|
BLD-Final | 10/12/2010 | 10/13/2010 | 10/13/2010 | A | PASS |
Tom Arcoraci
|
|
|
Travis Phone #: ###-####
|
FIRE-Final Inspection | 10/12/2010 | 10/13/2010 | 10/13/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Permanent Occupancy | | | 10/13/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/7/2010 | 10/8/2010 | 10/8/2010 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumbturn dead bolt from the exit and mount the address numbers as discussed.
|
FIRE-Final Inspection | 10/6/2010 | 10/7/2010 | 10/7/2010 | A | FAIL |
Troy Cobbley
|
|
|
I left a message on the contacts voice mail letting them know I was on the way. I arrived at the project site and no one was there. No inspection was performed. Travis Phone #: ###-####
|
Zoning Approval | 10/1/2010 | 10/1/2010 | 10/1/2010 | | DONE |
Susan Riggs
|
|
|
|
BLD-Aging Inspection | 8/16/2010 | 8/16/2010 | 8/17/2010 | | PART |
Tom Arcoraci
|
|
|
not ready
|
BLD-Framing/Rough-in | 6/15/2010 | 6/16/2010 | 6/16/2010 | A | PASS |
Tom Arcoraci
|
|
|
Travis Phone #: ###-####
|
BLD-Aging Inspection | 5/31/2010 | 5/31/2010 | 6/2/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 3/29/2010 | 3/30/2010 | 3/30/2010 | A | PASS |
Tom Arcoraci
|
|
|
Travis Phone #: ###-#### spec inspector on site
|
Issue PAID IN FULL permit | | | 1/27/2010 | | DONE |
|
|
|
|
OVERRIDE | | | 1/7/2010 | | |
|
|
|
|
Telephone call | | | 1/7/2010 | | DONE |
Barbara Stitt
|
|
|
Called Steve Pardew and told him that permit is ready, fees due, need GC and registration #, RP and ACHD info///1-7-10 @ 10:35am BAS
|
Print Occupancy Form | | | 1/7/2010 | | DONE |
Barbara Stitt
|
|
|
|
Override - People Holds | | | 1/7/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 1/7/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 12/24/2009 | | 1/6/2010 | | PASS |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 1/6/2010 | | PASS |
John Menard
|
|
|
Reviewed and approved all structural and nonstructural revisions. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/6/2010 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 12/10/2009 | | 1/6/2010 | | PASS |
John Menard
|
|
|
1/6/2010 14:15:25 JCM - activity updated through activity BLDA022 from case BLD09-02193.
|
Plan resubmittals received | | | 1/5/2010 | | DONE |
|
|
|
received transmittal letter - 2 copies com check, manufacturers specs and energy data - 2 sets of sheets A1.1, A2.1, A3.1, A4.1, A5.1, A7.1 - taken to John Menard
|
Plan resubmittals received | | | 1/5/2010 | | DONE |
|
|
|
received transmittal sheet - 3 memorandums from Stapley Engineering to BRS Architects - reduced drawing details and plans - 3 sets of sheets SO.4, S2.1, S5.1 - taken to John Menard
|
Routing - FIRE | 12/21/2009 | 12/21/2009 | 12/24/2009 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 12/24/2009 | | FAIL |
|
|
|
Failed Structural, Plan Check
|
Plan resubmittals requested | | | 12/23/2009 | | DONE |
John Menard
|
|
|
emailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 12/10/2009 | | 12/23/2009 | | FAIL |
John Menard
|
|
|
Received comment list from the consulting structural engineer
requesting revisions. JCM
|
Route to Impact Fee Review | 12/21/2009 | 12/24/2009 | 12/21/2009 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 12/21/2009 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 12/18/2009 | | 12/21/2009 | | FAIL |
John Menard
|
|
|
|
Routing - Erosion and Sediment | 12/17/2009 | | 12/18/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved with attached conditions. ESC09-00781
|
Routing - PLANNING | 12/18/2009 | | 12/18/2009 | | PASS |
Susan Riggs
|
|
|
CUP09-00083 Susan Riggs
|
Routing - PUBLIC WORKS | 12/15/2009 | | 12/17/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 12/16/2009 | | 12/17/2009 | | PASS |
Brian Murphy
|
|
|
approve previously under grading bld permit
|
Routing - Addressing | 12/16/2009 | | 12/16/2009 | | PASS |
April Wing
|
|
|
|
Routing - PLANNING Land Div | 12/10/2009 | | 12/15/2009 | | PASS |
Todd Tucker
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/10/2009 | | DONE |
|
|
|
|
Pending Assignment by JCM | 12/10/2009 | | 12/10/2009 | | BLDA |
John Menard
|
|
|
12/10/2009 11:39:49 JCM - activity updated through activity BLDA166 from case BLD09-02193.
|
Application received | | 12/10/2009 | | | |
|
|
|
|