Case Summary (BLD) | | | 8/27/2019 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/27/2019 | | DONE |
|
|
|
|
Third Notice | | 2/7/2011 | 3/9/2011 | | DONE |
|
|
|
|
Third Notice | | 1/12/2011 | 1/24/2011 | | DONE |
|
|
|
faxed and e-mailed
|
Third Notice | | 11/29/2010 | 12/29/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 11/22/2010 | 11/24/2010 | | DONE |
|
|
|
|
First Notice | | 11/7/2010 | 11/12/2010 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 10/28/2010 | | |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 10/28/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 10/1/2010 | 10/1/2010 | 10/1/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 9/8/2010 | 9/8/2010 | 9/8/2010 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/6/2010 | 7/7/2010 | 7/7/2010 | A | PASS |
Jim Storey
|
|
|
3dr lift 9:30 am
|
BLD-Other | 7/6/2010 | 7/6/2010 | 7/6/2010 | P | PASS |
Jim Storey
|
|
|
2nd grout lift. 1:00
|
BLD-Concrete | 7/2/2010 | 7/6/2010 | 7/6/2010 | A | PASS |
Jim Storey
|
|
|
8:30 grout pour appt. 1st litft ok
|
BLD-Other | 6/30/2010 | 6/30/2010 | 6/30/2010 | A | PASS |
Jim Storey
|
|
|
rebar ok
|
Zoning Approval | 6/28/2010 | 6/28/2010 | 6/28/2010 | | DONE |
Andrea Tuning
|
|
|
|
BLD-Other | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Jim Storey
|
|
|
handrail c/n made ok
|
BLD-Final | 5/3/2010 | 5/3/2010 | 5/3/2010 | A | PART |
Jim Storey
|
|
|
temp ok
|
FIRE-Final Inspection | 4/26/2010 | 4/26/2010 | 4/26/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety final approved.
|
BLD-Final | 4/21/2010 | 4/23/2010 | 4/23/2010 | A | PART |
Jim Storey
|
|
|
c/n handrail on wall west exit stair.
|
Zoning Approval Temp | 4/22/2010 | 4/22/2010 | 4/22/2010 | | DONE |
Andrea Tuning
|
|
|
This is a 30 day temporary approval only. The applicant must modify the DR application to reflect the elimination of a man door on teh east elevation, the modification to the loading dock and rail located on the east elevation, install and stripe the 12 parking spaces on the south side of the building, remove the pallettes fromt eh required parkign area and eliminate the rock mulch in the planter located along the south property line.
|
BLD-Conference | 4/19/2010 | 4/20/2010 | 4/21/2010 | A | CANC |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | PART |
Forrest France
|
|
|
Automatic fire door tested okay per NFPA 80, EM lights and exit signs approved, project related sprinkler permit finaled, door hardware is satisfactory. Final pending project attatched fire alarm permit work- note; ID detector, SD, and horn passed functional test.
|
FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | DONE |
Forrest France
|
|
|
Regarding fire code review note items including IFC 4004.1.6, fire alarm/sprinkler permits, and door hardware requirements for H occupancies.
|
BLD-Wall cover | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Jim Storey
|
|
|
first layer of rated wall interior.
|
BLD-Framing/Rough-in | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Jim Storey
|
|
|
reviewed damper installation listing ok to cover.
|
BLD-Conference | 3/10/2010 | 3/10/2010 | 3/10/2010 | A | PART |
Jim Storey
|
|
|
wrong listing for damper assembly/ got corect info. in the submital process for insp.
|
BLD-Framing/Rough-in | 3/9/2010 | 3/9/2010 | 3/9/2010 | P | NR |
Jim Storey
|
|
|
pending listing instaltion guide for damper in ratted wall.
|
BLD-Wall cover | 3/8/2010 | 3/8/2010 | 3/8/2010 | A | CANC |
Jim Storey
|
|
|
first layer of gyp for septration wall. 12:00 am appt.301 1 st layer ok to cover/ talked to contractor to cordenate with mech contractor to provide listing and mech insp with myself to insp. framing.
|
BLD-Framing/Rough-in | 3/5/2010 | 3/5/2010 | 3/5/2010 | A | PART |
Jim Storey
|
|
|
re-insp.all but roof sheathing at old dock 6 oc screw sch is pending.
|
BLD-Framing/Rough-in | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | FAIL |
Jim Storey
|
|
|
roof dyaphram not compley under overbuild/ missing screw pattern roof and sheer walls. reviewed 1 hr top of wall requirments.
|
BLD-Wall cover | 2/22/2010 | 2/25/2010 | 2/25/2010 | A | PASS |
Jim Storey
|
|
|
9:00 am appointment cmu walls. top out ok.
|
BLD-Wall cover | 2/22/2010 | 2/24/2010 | 2/24/2010 | A | CANC |
Jim Storey
|
|
|
9:00 am appointment cmu walls. rained out
|
BLD-Wall cover | 2/23/2010 | 2/23/2010 | 2/23/2010 | P | PASS |
Jim Storey
|
|
|
cmu chem bld. 2 nd lift 1:30 appt.
|
BLD-Wall cover | 2/22/2010 | 2/23/2010 | 2/23/2010 | A | PASS |
Jim Storey
|
|
|
9:00 am appointment cmu walls. first lift cmu and rebar ok si on site.
|
BLD-Foundation | 2/16/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Jim Storey
|
|
|
9:00 appt.exterior tank storage wall rebar and containment height ok.
|
BLD-Concrete | 2/12/2010 | 2/12/2010 | 2/12/2010 | P | PASS |
Jim Storey
|
|
|
3:00 appt exterior tank pads at chem storage exterior area west of loading dock ok.
|
BLD-Foundation | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PASS |
Jim Storey
|
|
|
chem wall and containment
|
BLD-Footing | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Jim Storey
|
|
|
ft ok chem.
|
BLD-Footing | 2/4/2010 | 2/4/2010 | 2/4/2010 | P | PASS |
Jim Storey
|
|
|
office restrooms framing ok
|
Case Summary (BLD) | | | 1/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - FIRE | 1/5/2010 | 1/5/2010 | 1/8/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (JCM) | 12/16/2009 | | 1/8/2010 | | PASS |
John Menard
|
|
|
1/8/2010 11:43:36 JCM - activity updated through activity BLDA022 from case BLD09-02232.
|
1st review completed | | | 1/8/2010 | | FAIL |
|
|
|
Failed Planning
|
Routing - PLANNING | 1/8/2010 | | 1/8/2010 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 1/8/2010 | | 1/8/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2010 | | DONE |
John Menard
|
|
|
|
Print Occupancy Form | | | 1/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/8/2010 | | DONE |
|
|
|
called Cornel Larson permit ready and fee given Also need ACHD 1-8-10 dld
|
Permit Ready to Issue | | | 1/8/2010 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/5/2010 | 1/8/2010 | 1/7/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 12/18/2009 | | 1/5/2010 | | PASS |
John Menard
|
|
|
|
Routing Off Site - STRUCTURAL | 12/16/2009 | | 12/29/2009 | | PASS |
Jason Blais
|
|
|
Review attached to case.
|
Plan resubmittals received | | | 12/23/2009 | | |
John Menard
|
|
|
Rec'd three copies of sheet SP-1- inserted by arch rep and taken back to John M
|
Routing PW Drainage | 12/17/2009 | | 12/18/2009 | | PASS |
Brian Murphy
|
|
|
talked to Cornel no pipes to seepage bed from storage area will be pumped.
|
Routing - PUBLIC WORKS | 1/16/2009 | | 12/18/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 12/18/2009 | | 12/18/2009 | | PASS |
Steven Webb
|
|
|
ESC plan approved under ESC09-02232 as well as permit conditions.
|
Routing - PLUMBING | 12/18/2009 | | 12/18/2009 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing - PLANNING | 12/18/2009 | | 12/18/2009 | | FAIL |
Andrea Tuning
|
|
|
Fail - The applicant must add three additional parking spaces and provide a copy of a new shared parking agreement that reflects the new parkign layout DRH09-00147 Andrea Tuning
|
Plan resubmittals received | | | 12/17/2009 | | DONE |
|
|
|
received 4 sets of A-1, A-3 - taken to brian murphy
|
Routing PW Environmental | 12/17/2009 | | 12/17/2009 | | PASS |
Walt Baumgartner
|
|
|
Permitted significant industrial user (SIU) in WestBoise sewer district. Reviewed for ASPP requirements - OK
|
Routing - Addressing | 12/16/2009 | | 12/16/2009 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/16/2009 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 12/16/2009 | | 12/16/2009 | | PASS |
Dave Abo
|
|
|
|
Pending Assignment by JCM | 12/16/2009 | | 12/16/2009 | | BLDA |
John Menard
|
|
|
12/16/2009 09:57:15 JCM - activity updated through activity BLDA166 from case BLD09-02232.
|
Application received | | 12/16/2009 | | | |
|
|
|
|