Second Notice | | 7/9/2010 | 7/15/2010 | | DONE |
|
|
|
|
First Notice | | 6/4/2010 | 6/29/2010 | | DONE |
|
|
|
|
BLD-Final | 5/25/2010 | 5/25/2010 | 5/25/2010 | P | PASS |
Tom Arcoraci
|
|
|
Inspection requested from web by: Tony Luchini Phone #: ###-####
|
Zoning Approval | 5/25/2010 | 5/25/2010 | 5/25/2010 | | PASS |
Josh Wilson
|
|
|
|
Override - People Holds | | | 5/25/2010 | | |
|
|
|
|
Permanent Occupancy | | | 5/25/2010 | | DONE |
|
|
|
|
Override - People Holds | | | 5/25/2010 | | |
|
|
|
|
BLD-Final | 5/18/2010 | 5/19/2010 | 5/19/2010 | P | NR |
Tom Arcoraci
|
|
|
please call me ahead of time so I can meet you. looking to final units B and C only so I can get temp CofO''s for closing.
thanks Inspection requested from web by: Tony Luchini Phone #: ###-####
|
FIRE-Final Inspection | 5/18/2010 | 5/19/2010 | 5/19/2010 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Energy code compliance | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Tom Arcoraci
|
|
|
insulation inspection for west side. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Framing/Rough-in | 4/6/2010 | 4/7/2010 | 4/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
framing inspection on all 4 units please. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Energy code compliance | 4/6/2010 | 4/7/2010 | 4/7/2010 | P | PASS |
Tom Arcoraci
|
|
|
energy inspection on east side only. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Framing/Rough-in | 3/31/2010 | 4/1/2010 | 4/1/2010 | P | FAIL |
Tom Arcoraci
|
|
|
framing inspection for units B and C only (east side). Inspection requested from web by: Tony Luchini Phone #: ###-#### energy code required u 28 windows ???? vertical fire blocks required in double walls
|
BLD-Conference | 3/24/2010 | 3/24/2010 | 3/24/2010 | P | PART |
Tom Arcoraci
|
|
|
two hour wall conf with elec contractor
|
BLD-Wall cover | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PART |
Tom Arcoraci
|
|
|
shear wall inspection prior to siding. please speak with framer, Josh.
thanks Inspection requested from web by: Tony Luchini Phone #: ###-####
|
BLD-Conference | 2/16/2010 | 2/17/2010 | 2/17/2010 | A | PASS |
Tom Arcoraci
|
|
|
I''d like to meet to review fire walls and truss design. Inspection requested from web by: Tony Luchini Phone #: ###-####
|
OVERRIDE | | | 2/12/2010 | | |
|
|
|
|
OVERRIDE | | | 2/12/2010 | | |
|
|
|
|
Print Occupancy Form | | | 2/12/2010 | | DONE |
|
|
|
|
Override - People Holds | | | 2/12/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 2/12/2010 | | DONE |
Barbara Stitt
|
|
|
|
Override - People Holds | | | 2/12/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/12/2010 | | DONE |
|
|
|
|
Routing - FIRE | 2/9/2010 | | 2/11/2010 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLAN CHECK | 2/11/2010 | | 2/11/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/11/2010 | | DONE |
John Menard
|
|
|
|
Plan assigned to (JCM) | 12/16/2009 | | 2/11/2010 | | PASS |
John Menard
|
|
|
2/11/2010 11:44:51 JCM - activity updated through activity BLDA022 from case BLD09-02235.
|
Plan resubmittals received | | | 2/10/2010 | | |
John Menard
|
|
|
rec'd two copies of sheets 3.1EC; 3.2EC; 3.3EC; 5.1EC; 5.2EC - inserted by arch - taken back to fire review
|
Routing - PLAN CHECK | 1/26/2010 | | 2/9/2010 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals requested | | | 2/8/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect requesting additional revisions. JCM
|
Plan resubmittals received | | | 2/3/2010 | | |
Tisha Gallop
|
|
|
received transmittal, memo for review response, letter addressed to Jason Blais, 903.2.7 Group R, 8 1/2" x 11" plans and details, plan sheets 3.1EC, 3.2EC, 3.3EC, 5.1EC, 5.2EC, 6.1EC, 6.2EC, 7.1, 7.2, 7.3, 7.4; inserted into plans by arch. rep. and taken back to John Menard
|
Routing - FIRE | 1/21/2010 | 1/21/2010 | 1/26/2010 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to architect.
|
1st review completed | | | 1/26/2010 | | FAIL |
|
|
|
Failed Erosion & Soil Control, Plan Check, Fire
|
Route to Impact Fee Review | 1/21/2010 | 1/26/2010 | 1/22/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 1/21/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 1/5/2010 | | 1/21/2010 | | FAIL |
John Menard
|
|
|
John M.
|
Plan resubmittals received | | | 1/5/2010 | | DONE |
|
|
|
erosion app and waiver letter
|
Routing - Erosion and Sediment | 1/5/2010 | | 1/5/2010 | | PASS |
Clint A Smith
|
|
|
ESC10-00001 plan waiver approved with attached conditions.
|
Routing - PLAN CHECK | 12/31/2009 | | 1/5/2010 | | |
John Menard
|
|
|
|
Routing - PLANNING | 12/30/2009 | | 12/31/2009 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLUMBING | 12/22/2009 | | 12/30/2009 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Street Lights | 12/21/2009 | | 12/22/2009 | | PASS |
Hank Alarcon
|
|
|
|
Routing - PUBLIC WORKS | 12/16/2009 | | 12/22/2009 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 12/22/2009 | | 12/22/2009 | | FAIL |
Steven Webb
|
|
|
No ESC plan or plan waiver nor application was included in the routing submittals. Informed agent, BRS.
|
Routing PW Sewer Rating | 12/21/2009 | | 12/21/2009 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 12/21/2009 | | 12/21/2009 | | PASS |
Brian Murphy
|
|
|
approve under previous odi inspected per Terry Records
|
Routing - Addressing | 12/18/2009 | | 12/18/2009 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCM | 12/16/2009 | | 12/16/2009 | | BLDA |
John Menard
|
|
|
12/16/2009 13:18:56 JCM - activity updated through activity BLDA166 from case BLD09-02235.
|
Plans ACCEPTED BY PLAN TECH | | | 12/16/2009 | | DONE |
|
|
|
ok per tim woodward for new bld intake
|
Recd Pcfee & Taken To Pln CK | | | 12/16/2009 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 12/16/2009 | | 12/16/2009 | | PASS |
Dave Abo
|
|
|
Units 39-42 of McKinney Condominiums.
|
Application received | | 12/16/2009 | | | |
|
|
|
|