Permanent Occupancy | | | 1/3/2011 | | DONE |
|
|
|
|
BLD-Final | 12/30/2010 | 12/30/2010 | 12/30/2010 | P | PASS |
Jim Storey
|
|
|
isues resolved final ok
|
BLD-Aging Inspection | 11/24/2010 | 11/24/2010 | 12/1/2010 | | PASS |
Jim Storey
|
|
|
CO cannot be issued until racking and smoke/vent issues corrected.
|
MISC ACTIONS | | | 10/25/2010 | | PART |
Jim Storey
|
|
|
CO cannot be issued until racking and smoke/vent issues corrected.
|
BLD-Final | 9/22/2010 | 9/24/2010 | 9/24/2010 | P | PASS |
Jim Storey
|
|
|
randy Phone #: ###-####
|
FIRE-Final Inspection | 9/22/2010 | 9/24/2010 | 9/24/2010 | A | PASS |
Forrest France
|
|
|
Reinspection passed, fire life safety finaled.
|
FIRE-Conference | 9/22/2010 | 9/22/2010 | 9/22/2010 | P | DONE |
Forrest France
|
|
|
Conversation with contractor regarding correction notice items per most recent inspection.
|
BLD-Final | 9/15/2010 | 9/16/2010 | 9/16/2010 | P | NR |
Jim Storey
|
|
|
Cole Seely ###-#### fire c/n
|
FIRE-Final Inspection | 9/15/2010 | 9/16/2010 | 9/16/2010 | A | FAIL |
Troy Cobbley
|
|
|
The main exit shall comply with IFC 1008.1.3.4 for access controlled egress doors, this includes fire alarm tie in and request to exit button. Single action hardware can be provided or keyed hardware with indicator. Repair the exit sign in the large breakroom and provide single action hardware on the exterior exit door from the large breakroom.
|
Issue PAID IN FULL permit | | | 9/15/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 12/16/2009 | 12/16/2009 | 7/26/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 7/26/2010 | | 7/26/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 7/26/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/26/2010 | | |
|
|
|
|
Telephone call | | | 7/26/2010 | | DONE |
|
|
|
t/c w alison at ###-#### - permit ready and fees given
|
Print Occupancy Form | | | 7/26/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 7/26/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/21/2009 | | 12/21/2009 | | FAIL |
Carl D Madsen
|
|
|
This cannot be processed as a occupancy. Plans provided do not match plans on file. Provided plans sho an opening cut in a 2 hour area separation wall. CDM 12-21-09
|
1st review completed | | | 12/21/2009 | | FAIL |
|
|
|
|
First Notice | | 1/13/2011 | | | |
|
|
|
|
Application received | | 12/16/2009 | | | |
|
|
|
|