Information based on query as of Friday, July 5, 2024.
Permit Information
Permit NumberBLD09-02247
StatusFinaled
Name JDM CONSTRUCTION
Site Address 717 S VISTA AVE
Project NameMotate
Customer Number 
ePlanReviewNo
Description
(MOTATE) Permit is to remodel an existing 2,301 square foot mercantile building to an office building. Approval contingent upon adhering to the approved plans on file. Work to include: construction of interior non-bearing wall to create a fully accessible bathroom, installation of new accessible bathroom fixtures, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/12/20104/16/2010 DONE
Third Notice 3/15/20103/29/2010 DONE
mailed
Telephone call  3/29/2010 DONE
DetailsTisha Gallop
called and left vm fax number no good, will mail FV request.
Second Notice 3/10/20103/10/2010 DONE
First Notice 1/31/20102/11/2010 DONE
FIRE-Final Inspection1/20/20101/21/20101/21/2010APASS
DetailsForrest France
Correction notice items verified for completion, life safety passed.
BLD-Final1/20/20101/21/20101/21/2010APASS
DetailsTom Arcoraci
Jock Phone #: ###-####
Permanent Occupancy  1/21/2010 DONE
DetailsTisha Gallop
FIRE-Final Inspection1/19/20101/20/20101/20/2010AFAIL
DetailsForrest France
Missing one 2A10BC fire extinguisher, door hardware at the second exit is not approved, provide signage at the main entry/exit door.
BLD-Final1/19/20101/20/20101/20/2010PPART
DetailsTom Arcoraci
Jock Phone #: ###-####
FIRE-Final Inspection1/15/20101/19/20101/19/2010ACANC
DetailsForrest France
jock - please call 1/2 hr prior Phone #: ###-####
BLD-Final1/15/20101/19/20101/19/2010PCANC
DetailsTom Arcoraci
jock - please call 1/2 hr prior Phone #: ###-####
BLD-Framing/Rough-in12/28/200912/28/200912/28/2009PPASS
DetailsTom Arcoraci
Phone #: ###-####
Issue PAID IN FULL permit  12/28/2009 DONE
Routing - PLAN CHECK12/17/2009 12/24/2009 PASS
DetailsTim L. Woodard
Plans approved with redlined comments. TLW
Plan assigned to (TLW)12/17/2009 12/24/2009 PASS
DetailsTim L. Woodard
12/24/2009 13:20:52 TLW - activity updated through activity BLDA022 from case BLD09-02247.
1st review completed  12/24/2009 DONE
DetailsTim L. Woodard
Routing - FIRE  12/24/2009 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  12/24/2009 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  12/24/2009 DONE
DetailsTim L. Woodard
Case Summary (BLD)  12/24/2009 DONE
DetailsTim L. Woodard
Print Occupancy Form  12/24/2009 DONE
Permit Ready to Issue  12/24/2009 DONE
Telephone call  12/24/2009  
called Jock left message permit ready and fee given 12-24-09 dld
Plans ACCEPTED BY PLAN TECH  12/17/2009 DONE
Details
Recd Pcfee & Taken To Pln CK  12/17/2009 DONE
Details
Application received 12/17/2009