Permit NumberBLD09-02250
StatusFinaled
Name JRW CONSTRUCTION
Site Address 7009 W FRANKLIN RD
Project NameBishop Kelly High School
Customer Number 
ePlanReviewNo
Description
Bishop Kelly Indoor Batting Facility - To expand and enclose an existing 1,922 square foot uncovered batting facility currently located near the Southeast corner of the school property. The batting facility will be expanded 158 square feet, enclosed with a semi-permanent, pre-engineered, 20 foot high, 2,080 square foot steel framed building covered with a "Dura Wave" fabric. Work to include: Extend the existing concrete pad 260 square feet to the West with a 4-inch thick concrete slab; construct the 26' X 80' "Quick Structure/Coverall" brand semi-permanent enclosure/shelter; construct a stable, firm, and slip resistant accessible route; install interior and exterior lighting; and related site improvements. All work per the approved plans, engineering, attached plan review report, and all other reviewing agencies approvals. This structure does not have fire sprinklers. CUP09-00085 **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 3/19/20103/26/2010 DONE
BLD-Final3/9/20103/9/20103/9/2010PPASS
DetailsTom Arcoraci
Renny Phone #: ###-####
Permanent Occupancy  3/9/2010 DONE
BLD-Final2/1/20102/1/20102/1/2010PPART
DetailsJim Storey
Raney Phone #: ###-#### buliding ok pending ada and lumanation for ada path as well as patch plant to open.
FIRE-Final Inspection1/29/20102/1/20102/1/2010APASS
DetailsTroy Cobbley
Life safety passed.
Zoning Approval2/1/20102/1/20102/1/2010 PASS
DetailsDavid Moser
CUP09-00085
Print Occupancy Form  2/1/2010 DONE
Temporary Occupancy UNPAID FEE  2/1/2010 DONE
Details
Temporary Occupancy UNPAID FEE  2/1/2010 DONE
Details
PubWorks Occupancy Approval1/26/20101/26/20101/26/2010 DONE
DetailsTiffany Lowery
No inspection required per Brian Murphy
Print Occupancy Form  1/25/2010  
BLD-Concrete1/12/20101/12/20101/12/2010PPASS
DetailsTom Arcoraci
Renny Phone #: ###-####
Print Occupancy Form  1/11/2010 DONE
Telephone call  1/11/2010 DONE
called ###-#### Remmy permit ready and fee given Also need ACHD 1-11-10 dld
Permit Ready to Issue  1/11/2010 DONE
Issue PAID IN FULL permit  1/11/2010 DONE
Route to Impact Fee Review1/5/20101/8/20101/8/2010 PASS
DetailsCindy M. Gould
Routing - FIRE1/5/20101/5/20101/8/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (SRZ)12/22/2009 1/8/2010 PASS
DetailsSam Zahorka
1/8/2010 13:55:39 SRZ - activity updated through activity BLDA022 from case BLD09-02250.
1st review completed  1/8/2010 PASS
Routing - PLAN CHECK1/8/2010 1/8/2010 PASS
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  1/8/2010 DONE
DetailsSam Zahorka
Routing - PLAN CHECK12/30/2009 1/5/2010 PASS
DetailsSam Zahorka
Case Summary (BLD)  1/5/2010 DONE
DetailsSam Zahorka
Routing - PLANNING12/30/2009 12/30/2009 PASS
DetailsDavid Moser
Cup09-00085 David Moser
Routing - Erosion and Sediment12/29/2009 12/30/2009 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the attached conditions. ESC09-00801
Routing - PUBLIC WORKS12/23/2009 12/29/2009 PASS
DetailsConnie Baumgartner
Routing PW Drainage12/23/2009 12/29/2009 PASS
DetailsBrian Murphy
Telephone call  12/28/2009 DONE
DetailsSam Zahorka
Telephoned Kristen with Erstad Architects and updated her on the status of this permit. Also requested a revised sheet FB04 because the minimum roof live load shows 12 psf. The minimum is required to be 25 psf.
Routing - Addressing12/23/2009 12/23/2009 PASS
DetailsApril Wing
Routing PW Sewer Rating12/23/2009 12/23/2009 PASS
DetailsConnie Baumgartner
Routing - PLANNING Land Div12/22/2009 12/23/2009 PASS
DetailsTodd Tucker
Additional plans submitted  12/22/2009 DONE
DetailsTisha Gallop
received structural calcs
Plans ACCEPTED BY PLAN TECH  12/22/2009 DONE
DetailsTisha Gallop
Pending Assignment by JCM12/22/2009 12/22/2009 BLDA
DetailsJohn Menard
12/22/2009 11:08:07 JCM - activity updated through activity BLDA160 from case BLD09-02250.
Application received 12/17/200912/17/2009 DONE
DetailsTisha Gallop
waiting for structural calcs from applicant prior to begin routing per JCM
Recd Pcfee & Taken To Pln CK  12/17/2009 DONE
DetailsTisha Gallop