Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD09-02253
StatusFinaled
Name HCD INC
Site Address 7235 W BETHEL ST
Project NameFarmer Brothers Coffee
Customer Number 
ePlanReviewNo
Description
(FARMERS BROTHERS COFFEE) Permit is to remodel an existing 8,032 square foot office / warehouse building. UPGRADE AGREEMENT APPROVED FOR THIS BUILDING - agreement is attached to this case. Approval contingent upon adhering to the approved plans on file, attached engineering, and CZC09-00222. Work to include: [construction of interior non-bearing walls to create two fully accessible bathrooms, a new managers office, a fire sprinkler riser room, and to isolate off common area], installation of new accessible bathroom fixtures, installation of new hand sink, installation of new exterior landing, installation of new exterior loading ramp, installation of new opening in tilt-up wall, and finishes in compliance with chapter 8 of the 2006 IBC. This building is to be fully fire sprinklered per NFPA #13 as regulated by the fire department to comply with area requirements. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation (Racking permit # BLD09-02212). UPGRADE AGREEMENT APPROVED FOR THIS BUILDING - agreement is attached to this case. **TLW** 4-21-10 FINAL CERT OF VALUE PER GC $ 90,445.00 ///DLD
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/26/20104/21/2010 DONE
Second Notice 4/25/20104/21/2010 DONE
First Notice 3/29/20104/15/2010 DONE
FIRE-Final Inspection3/18/20103/19/20103/19/2010APASS
DetailsForrest France
Fire life safety passed inspection, two additional fire extinguishers posted while on site, discussed building upgrade agreement on file.
BLD-Final3/18/20103/19/20103/19/2010PPASS
DetailsTom Arcoraci
dennis Phone #: ###-#### building permit ok for perm occ
Permanent Occupancy  3/19/2010 DONE
BLD-Other3/18/20103/18/20103/18/2010PPASS
DetailsTom Arcoraci
Dennis Phone #: ###-####
Zoning Approval3/17/20103/17/20103/17/2010 PASS
DetailsAndrea Tuning
BLD-Framing/Rough-in2/18/20102/18/20102/18/2010PPASS
DetailsTom Arcoraci
Dennis Phone #: ###-####
BLD-Conference2/18/20102/18/20102/18/2010PPASS
DetailsTom Arcoraci
Plan assigned to (TLW)12/18/2009 2/3/2010 PASS
DetailsTim L. Woodard
2/3/2010 11:27:24 TLW - activity updated through activity BLDA022 from case BLD09-02253.
Routing - PLAN CHECK2/3/2010 2/3/2010 PASS
DetailsTim L. Woodard
Plans approved with plan review report and upgrade agreement. TLW
Routing - FIRE2/3/2010 2/3/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK2/3/2010 2/3/2010 PASS
DetailsTim L. Woodard
Approved plans and routed to front counter for fees.
PLANS/APPL TAKEN TO FRONT DESK  2/3/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/3/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/3/2010  
Telephone call  2/3/2010 DONE
called Doug permit ready and fee given 2-3-10 dld
Permit Ready to Issue  2/3/2010 DONE
Issue PAID IN FULL permit  2/3/2010 DONE
Plan resubmittals received  1/21/2010  
DetailsTisha Gallop
received response letter and two copies of plan sheet A1.1; taken to Tim Woodard
Routing - PLAN CHECK1/6/2010 1/15/2010 FAIL
DetailsTim L. Woodard
Upgrade agreement still not approved. TLW
Plan resubmittals received  1/11/2010  
DetailsTisha Gallop
received response letter (structural), response letter (fire), revised certificate of value, letter to building official, and two copies of plan sheets T1.0, A1.2, A1.3; taken to Tim Woodard
Received Certificate of Value  1/11/2010 DONE
DetailsTisha Gallop
received revised cert of value with resubmittal; new project value is $65,000; ele $10,000; plm $8,500; mech $750; fire spr $25,000; fire alarm $5,000//1/11/10 LEG
Routing - FIRE12/31/2009 1/6/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  1/6/2010 FAIL
Failed Plan Check, Fire
Routing - Addressing12/21/2009 12/31/2009 PASS
DetailsApril Wing
Public Works review sheet signed by April.
Routing - PLAN CHECK12/21/2009 12/31/2009 FAIL
DetailsTim L. Woodard
Over area - Refer to plan review report. TLW
Routing - PUBLIC WORKS12/18/2009 12/21/2009 PASS
DetailsConnie Baumgartner
Routing PW Sewer Rating12/21/2009 12/21/2009 PASS
DetailsConnie Baumgartner
Application received 12/18/200912/18/2009 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  12/18/2009 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  12/18/2009 DONE
DetailsTisha Gallop
Agreement of Future work2/2/201011/1/2020   
DetailsTim L. Woodard
(FARMER BROTHERS COFFEE) 4/5/12 The building has been fully fire sprinklered under permits FIR09-00734 and FIR10-00238.
8/8/12 Revised Upgrade Agreement attached to this case. This replaces the former agreement. Item #1 of the original agreement was completed as noted above under 4/5/12 note. No real timeline with new agreement as long as second floor is vacant and not occupied. Can check or update status in February of 2014.
6/16/14 Still no tenant. Extended date to next June to check status.
9/19/16 A permit application has been submitted for review under BLD16-02225 for storage occupancy of the second floor.
11/12/19 This past permit BLD16-02225 was voided by Carl Madsen. Waiting for application to occupy 2nd floor **JHB**