First Notice | | 3/6/2010 | 3/16/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/24/2010 | | DONE |
|
|
|
|
BLD-Final | 2/12/2010 | 2/16/2010 | 2/16/2010 | A | PASS |
Tom Arcoraci
|
|
|
Todd Phone #: ###-#### per plan
|
FIRE-Final Inspection | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 2/2/2010 | 2/3/2010 | 2/3/2010 | A | FAIL |
Troy Cobbley
|
|
|
Repair the exit sign at the main exit and provide an additional exit sign as per the approved floor plan.
|
BLD-Other | 2/2/2010 | 2/3/2010 | 2/3/2010 | A | DONE |
Mike Jordan
|
|
|
Todd-No mechanical work done? Phone #: ###-####. No mech. permit required. Exisiting grid was used.
|
BLD-Framing/Rough-in | 1/14/2010 | 1/15/2010 | 1/15/2010 | A | PASS |
Tom Arcoraci
|
|
|
todd Phone #: ###-####
|
Permit Ready to Issue | | | 1/12/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/12/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/8/2010 | | DONE |
|
|
|
called Craig ,left message permit ready and fee given Also need RP 1-8-10 dld
|
Plan assigned to (CDM) | 12/23/2009 | 12/23/2009 | 1/7/2010 | | DEFR |
Tim L. Woodard
|
|
|
Routed to TLW
|
Routing - PLAN CHECK | | | 1/7/2010 | | PASS |
Tim L. Woodard
|
|
|
There were two plans submitted for this project by different architects. It was determined that the plans for BLD09-02177 would be voided and we would proceed with these plans. TLW
|
Plan resubmittals received | | | 1/7/2010 | | |
Tim L. Woodard
|
|
|
Rec'd 2 copies of sheets G0.1; A1.1; A2.0; A2.1; A6.0; A6.1; A9.1; taken to Tim W
|
Intake Approval | | | 1/7/2010 | | PASS |
Tim L. Woodard
|
|
|
Just approved plans for review. Permit 02177 was also pulled to do the same work. TLW
|
Plan assigned to (TLW) | 1/7/2010 | | 1/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - FIRE | | | 1/7/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 1/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/7/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - Erosion and Sediment | 1/7/2010 | | 1/7/2010 | | PASS |
Tim L. Woodard
|
|
|
Plan Waiver approved contigent on adhereing to the attached conditions. TLW
|
Plans ACCEPTED BY PLAN TECH | | | 12/23/2009 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/23/2009 | | DONE |
|
|
|
|
Application received | | 12/22/2009 | | | |
|
|
|
|