Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD09-02294
StatusFinaled
Name SERVPRO
Site Address 11350 W EXECUTIVE DR
Project NameSERVPRO
Customer Number 
ePlanReviewNo
Description
(SERVPRO) Permit is to remodel an existing 15,164 square foot warehouse. Remodel is being done to correct work that was done without permits. Approval contingent upon adhering to the approved plans on file. Work to include: demolition of all access to non-compliant mezzanine, installation of new plumbing fixtures, and finishes in compliance with chapter 8 of the 2006 IBC. This building is not fire sprinklered. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 4/30/20104/21/2010 DONE
Third Notice 3/30/20104/16/2010 DONE
faxed
Second Notice 3/20/20103/25/2010 DONE
First Notice 2/19/20103/10/2010 DONE
BLD-Final2/8/20102/9/20102/9/2010APASS
DetailsMike Jordan
Mark Phone #: ###-####. ok for perm occ.
Permanent Occupancy UNPAID FEE  2/9/2010 DONE
DetailsTisha Gallop
FIRE-Final Inspection2/5/20102/8/20102/8/2010PPASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection2/5/20102/5/20102/5/2010PFAIL
DetailsTroy Cobbley
Repair the exit lights and emergency lights in the front office area as discussed.
BLD-Conference1/21/20101/22/20101/22/2010APASS
DetailsJim Storey
Mark Phone #: ###-#### reviewed requirments
Issue PAID IN FULL permit  1/21/2010 DONE
Routing - PLAN CHECK1/19/2010 1/19/2010 PASS
DetailsTim L. Woodard
Reviewed Resubmittals and approved plans, refer to plan review report. TLW
PLANS/APPL TAKEN TO FRONT DESK  1/19/2010 PASS
DetailsTim L. Woodard
Case Summary (BLD)  1/19/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  1/19/2010 DONE
Permit Ready to Issue  1/19/2010 DONE
Telephone call  1/19/2010  
called Matt Rhees permit ready and fee given Also need GC 1-19-10 dld
Plan assigned to (TLW)  1/19/2010 PASS
DetailsTim L. Woodard
1/19/2010 10:05:27 TLW - activity updated through activity BLDA022 from case BLD09-02294.
Plan resubmittals received  1/15/2010  
DetailsTisha Gallop
received transmittal and three copies of plan sheet A1.0; taken to Tim Woodard
Routing - FIRE  1/8/2010 PASS
DetailsTim L. Woodard
Field Verify Compliance. TLW
Routing - PUBLIC WORKS  1/8/2010 PASS
DetailsTim L. Woodard
Signed off by Bev Hall on front of plans and on Public works review sheet. TLW
Routing - PLAN CHECK  1/8/2010 FAIL
DetailsTim L. Woodard
Refer to plan review report. Two exits required off second floor. TLW
1st review completed  1/8/2010 FAIL
DetailsTim L. Woodard
Failed plan review.
Routing PW Sewer Rating12/31/2009 12/31/2009 PASS
DetailsConnie Baumgartner
Routing - Addressing12/29/2009 12/30/2009 PASS
DetailsApril Wing
Application received 12/29/200912/29/2009 DONE
Details
Plans ACCEPTED BY PLAN TECH  12/29/2009 DONE
Details
Recd Pcfee & Taken To Pln CK  12/29/2009 DONE
Details