Routing Walk-In (BLD) | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Perry Paine
|
|
|
stair rails required at 4 or more risers
|
BLD-Final | 9/30/2010 | 10/1/2010 | 10/1/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/1/2010 | 10/1/2010 | 10/1/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 9/28/2010 | 9/29/2010 | 9/29/2010 | A | FAIL |
Dave Hannah
|
|
|
jim Phone #: ###-#### corrections not done
|
BLD-Final | 9/27/2010 | 9/28/2010 | 9/29/2010 | A | FAIL |
Dave Hannah
|
|
|
jim Phone #: ###-#### needs address posted finish gaurg rail on back deck close risers on stairs off deck handrail for steps off front door
|
BLD-Grading Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 | P | BOND |
Terry Records
|
|
|
The rough grading and drainage have been completed at the above mentioned address. However, revegetation and the roof drain system have not been completed. For this the engineer has recommended a bond of $750.00. The bond has been submitted.
|
BLD-Final | 9/15/2010 | 9/16/2010 | 9/16/2010 | A | FAIL |
Dave Hannah
|
|
|
Jim Phone #: ###-#### needs fire spr final and hill side final by terry
|
BLD-Energy code compliance | 6/21/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 6/16/2010 | 6/17/2010 | 6/17/2010 | A | PASS |
Dave Hannah
|
|
|
jim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/21/2010 | 5/24/2010 | 5/24/2010 | A | FAIL |
Dave Hannah
|
|
|
shear wall Phone #: ###-#### missing hold downs
|
BLD-Foundation | 4/12/2010 | 4/13/2010 | 4/13/2010 | A | PART |
Dave Hannah
|
|
|
Ian Phone #: ###-####
|
BLD-Footing | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PART |
Dave Hannah
|
|
|
dane Phone #: ###-#### ftgs in lower slab
|
BLD-Footing | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 3/25/2010 | 3/25/2010 | 3/26/2010 | P | PART |
Dave Hannah
|
|
|
Dane-Pads in the garage inspection please Phone #: ###-####
|
BLD-Foundation | 3/8/2010 | 3/9/2010 | 3/9/2010 | P | PASS |
Mike Jordan
|
|
|
ian Phone #: ###-####. Vertical and horizontal reinforcement for architectual concrete wall.
|
BLD-Foundation | 3/1/2010 | 3/2/2010 | 3/2/2010 | A | PASS |
Dave Hannah
|
|
|
Ian Phone #: ###-####
|
BLD-Foundation | 2/17/2010 | 2/18/2010 | 2/18/2010 | A | PASS |
Dave Hannah
|
|
|
ian Phone #: ###-####
|
BLD-Footing | 2/10/2010 | 2/10/2010 | 2/10/2010 | P | PASS |
Dave Hannah
|
|
|
IAN Phone #: ###-####
|
BLD-Footing | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | NR |
Dave Hannah
|
|
|
IAN Phone #: ###-####
|
PubWorks Subgrade Approval | 2/2/2010 | 2/2/2010 | 2/2/2010 | | PART |
Terry Records
|
|
|
Subgrade for basement footings approved by the geotechnical engineer.
|
BLD-Other | 1/28/2010 | 1/29/2010 | 1/29/2010 | A | PEND |
Tony Young
|
|
|
Jim-Sub Grade inspection prior to footing inspection please Phone #: ###-#### pending engineer report
|
Case Summary (BLD) | | | 1/28/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 1/5/2010 | 1/8/2010 | 1/12/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (CDM) | 1/5/2010 | 1/5/2010 | 1/12/2010 | | PASS |
Carl D Madsen
|
|
|
1/12/2010 07:54:13 CDM - activity updated through activity BLDA022 from case BLD10-00020.
|
Routing - PLAN CHECK | 1/6/2010 | | 1/12/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/12/2010 | | |
|
|
|
|
Telephone call | | | 1/12/2010 | | DONE |
|
|
|
t/c w jim shervik at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/12/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 1/11/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | | | 1/6/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - FIRE | 1/6/2010 | | 1/6/2010 | | PASS |
Scott Arellano
|
|
|
Fire sprinklers are required per NFPA 13D
|
Routing - Erosion and Sediment | 1/6/2010 | | 1/6/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved with attached conditions. ESC10-00004.
|
Application received | | 1/5/2010 | 1/5/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 1/5/2010 | | 1/5/2010 | | PASS |
Terry Records
|
|
|
|
Routing - PLANNING | 1/5/2010 | | 1/5/2010 | | PASS |
Cody Riddle
|
|
|
CFH09-00032 Cody Riddle
|
Routing - Addressing | 1/5/2010 | | 1/5/2010 | | PASS |
April Wing
|
|
|
|