Third Notice | | 5/17/2010 | 5/4/2010 | | DONE |
|
|
|
|
Third Notice | | 4/13/2010 | 5/3/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 4/8/2010 | 4/8/2010 | | DONE |
|
|
|
|
First Notice | | 3/15/2010 | 3/29/2010 | | DONE |
|
|
|
|
BLD-Final | 3/4/2010 | 3/5/2010 | 3/5/2010 | A | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-#### ok for perm occ
|
Permanent Occupancy UNPAID FEE | | | 3/5/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/4/2010 | 3/4/2010 | 3/4/2010 | P | PASS |
Forrest France
|
|
|
Reinspection passed, correction items verified for completion. Fire life safety is acceptable.
|
FIRE-Final Inspection | 3/4/2010 | 3/4/2010 | 3/4/2010 | A | FAIL |
Forrest France
|
|
|
C/N items included exit signs at two locations to be repaired, provide EM lighting at the back exitway adjacent to the restrooms per plan annotations, repair one EM light, remove address numbers 611 at the second exit door facing main street.
|
Case Summary (BLD) | | | 2/4/2010 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/3/2010 | 2/3/2010 | 2/3/2010 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2010 | | PASS |
|
|
|
|
Print Occupancy Form | | | 1/29/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2010 | | DONE |
|
|
|
t/c jim at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 1/29/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/29/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CJW) | 1/6/2010 | | 1/29/2010 | | PASS |
Carl Westfall
|
|
|
1/29/2010 13:39:51 CJW - activity updated through activity BLDA022 from case BLD10-00022.
|
Routing - PLAN CHECK | 1/22/2010 | | 1/29/2010 | | PASS |
Carl Westfall
|
|
|
(1-27-10) Structural issue still needs resolution.
(1-29-10) Drawings approved with "red lines".
|
Plan resubmittals received | | | 1/28/2010 | | |
Tisha Gallop
|
|
|
received response letter, two copies of structural calcs and plan sheet a2.00; taken to Carl Westfall
|
Plan resubmittals received | | | 1/25/2010 | | |
Carl Westfall
|
|
|
rec'd response letter; two copies of specs; and sheets a0.01; a0.02; a2.00; a2.11; a2.31; f2.11; taken to Carl W
|
Routing - FIRE | 1/19/2010 | 1/19/2010 | 1/22/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 1/22/2010 | | FAIL |
|
|
|
Failed Plan Check
|
Route to Impact Fee Review | 1/19/2010 | 1/22/2010 | 1/21/2010 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 1/8/2010 | | 1/19/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on January 13, 2010 and finished on January 19, 2010. Revised drawings were required. See the plan review report. Drawings in Plan Review 8 days.
|
Routing - PLUMBING | 1/7/2010 | | 1/8/2010 | | PASS |
Bill VanDegrift
|
|
|
provide CDHD required hand sink at the bar.
|
Routing - PUBLIC WORKS | 1/6/2010 | | 1/7/2010 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Environmental | 1/7/2010 | | 1/7/2010 | | PASS |
Walt Baumgartner
|
|
|
Existing grease interceptor on site that served former Zutto Japanese restaurant
|
Routing PW Sewer Rating | 1/7/2010 | | 1/7/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 1/5/2010 | 1/6/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 1/6/2010 | | 1/6/2010 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 1/6/2010 | | 1/6/2010 | | DONE |
Jason Blais
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/5/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/5/2010 | | DONE |
Tisha Gallop
|
|
|
|