Permit Information
Permit NumberBLD10-00044
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 3176 S DENVER WAY
Project NameST LUKE'S REFERENCE LABORATORY
Customer Number 
ePlanReviewNo
Description
(ST. LUKE'S - REFERENCE LABORATORY) Plan Modification Additional Plans - 10/12/10 - Due to mold mitigation and abatement, new windows and exterior wall finish & sheathing are being added to scope of work as approved under Modification of DRH09-00259. New exterior envelope components to comply with 2006 IECC. PLAN MODIFICATION 9/10/10 - SCOPE OF WORK REDUCED DUE TO FINANCIAL CONSTRAINTS. EXTERIOR MODIFICATIONS AND CANOPY ADDITIONS DELETED; INTERIOR FINISHES WITHIN ROOMS MARKED "FUTURE" TO REMAIN AS-IS; INTERIOR RESTROOM FINISHES & DIVIDERS TO REMAIN UNCHANGED; MISCELLANEOUS ARCH., MECH., ELECT., MINOR CHANGES OR SUBSTITUTIONS FOR COST SAVINGS. ALL ORIGINAL PLAN REVIEW COMMENTS OF ALL AGENCIES FOR ITEMS NOT REMOVED FROM SCOPE OF WORK ARE STILL APPLICABLE. ALL EXITING SYSTEM COMPONENTS (DOOR WIDTH, HARDWARE, CLEAR FLOOR SPACE, DOOR SWING, EXIT LIGHTING AND EMERGENCY LIGHTING, ETC. SHALL BE COMPLIANT WITH CURRENT CODE FOR LIFE SAFETY / EGRESS. To remodel an existing two story 31,625 sq. ft. building into a medical laboratory per approved plans. Demolition work is under separate permit, BLD09-02080. Work to include construction of interior walls in conjunction with remaining existing walls to create office, work, laboratory and support areas; conference / training room on second floor with existing offices; upgrade restrooms, showers, drinking fountains, doors, door hardware and clear floor spaces & latch side clearance at all doors; work on electrical, mechanical, plumbing, sprinkler, alarm and security systems to comply with current adopted codes and ordinances. Separate applications and permits required for sprinkler & alarm system modifications as regulated by the fire department, before being worked on. NOTE: This building is fully fire sprinklered with all heads being changed to quick response to allow non-rated corridors. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/14/20119/20/2011 DONE
credit given for value pulled under demo permit Bld09-02080
Third Notice 8/10/20118/30/2011 DONE
faxed and e-mailed to Curtis Weedop
Third Notice 7/12/20117/27/2011 DONE
faxed
Third Notice 5/31/20116/28/2011 DONE
faxed
First Notice 6/5/20115/26/2011 DONE
changed to third notice to match demo permit
Permanent Occupancy  5/26/2011 DONE
DetailsBarbara Stitt
BLD-Final5/18/20115/18/20115/18/2011APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble
Zoning Approval3/25/20113/25/20113/25/2011 DONE
DetailsAndrea Tuning
BLD-Aging Inspection3/23/20113/23/20113/23/2011 PASS
DetailsJim Storey
temp final ok pending p$z pw .
Zoning Approval1/19/20111/20/20111/24/2011 PASS
DetailsAndrea Tuning
BLD-Final1/21/20111/21/20111/21/2011PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble temp final ok pending p$z pw .
FIRE-Final Inspection1/21/20111/21/20111/21/2011PPASS
DetailsForrest France
Fire life safety passed with the exception of door hardware at one location first floor to be switched operable under any condition in the direction of egress. Combustible decking at the roof to be removed entirely as agreed to remain in compliance with NFPA 13 requirements as discussed and agreed with general contractors on site.
BLD-Final1/19/20111/19/20111/21/2011PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble pending fire.
FIRE-Conference12/23/201012/23/201012/23/2010ADONE
DetailsForrest France
Regarding project related FIR permit work.
BLD-Wall cover11/24/201011/24/201011/24/2010APASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by phil doble ceiling grid ok to cover but needs to fire proof around 1hr wall above ceiling phil will get this work done and schedule an inspection
BLD-Wall cover11/10/201011/10/201011/10/2010PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by phil doble. Ceiling grid inspection, 2nd floor only at interior rooms, all other grid existing.
CHANGE STATUS TO (ISS)  11/9/2010 DONE
DetailsTisha Gallop
picked up plan mod
Plan assigned to (DRS)9/10/20109/10/201011/8/2010 PASS
DetailsDan Stuart
Routing - PLAN CHECK11/5/2010 11/8/2010 PASS
DetailsDan Stuart
Plan mod review complete. Mod of 9/10/10 redfuced scope of interior and exterior work due to budgeting reductions. Plan mod of 10/12/10 for new exterior windows and EIFS system as part of Mold Abatement, modified DRH09-00259.
PLANS/APPL TAKEN TO FRONT DESK  11/8/2010 PASS
Print Occupancy Form  11/8/2010  
Telephone call  11/8/2010 DONE
11-8-10 called Pat Walsh permit ready and fee given ///dld
Routing - PLANNING11/5/2010 11/5/2010 PASS
DetailsAndrea Tuning
All new exterior modified sheets require approval & initials / date for acceptance.
Routing - PLAN CHECK9/13/2010 11/5/2010 PASS
DetailsDan Stuart
Plans routing to Planning for review and for modification to DRH09-00259.
BLD-Framing/Rough-in10/25/201010/25/201010/25/2010APASS
DetailsJim Storey
hard lid framing ok cooller area ok to instal cooller
Additional plans submitted  10/12/2010 DONE
New Sheets A-201A (Window / EFIS Elevations & replacement) & A-201B (Mold Abatement) received. Modification to DRH09-00259 required before plans can be approved for plan modification.
Plan resubmittals received  10/12/2010  
DetailsDan Stuart
rec'd modification to existing plan mod to replace windows and eifs - sheets A-201A & A-201B
Plan Modification Accepted  9/10/2010  
DetailsDan Stuart
Plan mod rec'd to- Delete two east side canopy covers over existing entrances. Delete new finishes (i.e carpet, paint, ceilings) in all "future" tenant or expansion rooms/spaces. Misc arch., mech, elec, minor changes or subtitutions for cost savings. Sheets - G-001; G-002; G-003; C1.50; C1.51; L-101; AD-101; AD-111; AD-112; AD-131; S-01-07; AD-201; A-101; A-102; A-111; A-112; A-113; A-114; A-121; A-122; A-131; A-201; A-211; A-212; A-213; A-214; A-215; A-216; A-301; A-311; A-312; A-501; A-502; A-503; A-504; A-601; A-602; A-603; A-611; SD-110; S-001; S-111; S-501; S-602; I-100; I-101; I-102; I-103; I-200; I-201; I-202; M-001; MD-002; MD-110; MD-111; MD-112; MD-211; MD-212; MD-311; MD-212; MD-411; MD-611; M-002; M-003; M-110; M-111; M-112; M-211; M-212; M-311; M-312; M-411; M-611; M-612; FPD-111; FPD-112; FP-111; F-112; ED-111; ED-112; ED-131; E-001; E-111; E-112; E-113; E-121; E-122; E-123; E-131; E-132; E-133; E-141; E-142; E-143; E-201; E-211; E-212; E-221; E-301; E-302; Q101; Q251; Q252; Q401; Q402; Q601
BLD-Wall cover9/7/20109/7/20109/7/2010APASS
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble 2nd phase north side ok to cover/ gas storage ok.
BLD-Wall cover8/19/20108/19/20108/19/2010PPART
DetailsJim Storey
Phone #: ###-#### >> Inspection requested via web by phil doble up stairs ok to cover walls all area in main to the south ok to cover walls.
BLD-Other7/16/20107/19/20107/19/2010APASS
DetailsJim Storey
work in progress.
BLD-Aging Inspection7/14/20107/14/20107/16/2010 PASS
DetailsJim Storey
work in progress.
Issue & PRINT to be Invoiced  4/5/2010 DONE
Routing - FIRE3/9/2010 3/10/2010 PASS
DetailsScott Arellano
Attached updated IFC comments to plans
Routing - PLAN CHECK3/10/2010 3/10/2010 PASS
DetailsDan Stuart
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  3/10/2010 PASS
Print Occupancy Form  3/10/2010 DONE
Details
Telephone call  3/10/2010 DONE
Details
t/c w patrick walsh at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  3/10/2010 DONE
Details
Plan assigned to (DRS)1/8/2010 3/10/2010 PASS
DetailsDan Stuart
3/10/2010 09:52:46 DRS - activity updated through activity BLDA022 from case BLD10-00044.
Routing - PUBLIC WORKS3/9/2010 3/9/2010 PASS
DetailsBeverly Hall
Routing - FIRE3/5/2010 3/8/2010  
DetailsScott Arellano
*Plans taken to Planning by project manager*

See architects response #5 to plan review report - (4) Carbon Dioxide (CO2) gas cylinders - (2) active & (2) on stand-by.
Routing - PUBLIC WORKS3/8/2010 3/8/2010 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK2/10/2010 3/5/2010 PASS
DetailsDan Stuart
Reviewed plan and engineering resubmittals of 3/4/10. Plan approved. Re-routing to fire code analyst for review.
Routing PW Solid Waste3/4/2010 3/4/2010 PASS
DetailsPeter J. McCullough
Plan resubmittals received  3/4/2010 DONE
received 2 corrections ,and 2 copies of sheets g-003,a-111,a-112,a-113,a-114,a-121,a-122,a-131,a-211,a-215,a-504,a-601,a-602,e-121,e-122,m-110,m-111 inserted by Pat Walsh and taken back to Dan S.
Routing PW Sewer Design1/11/2010 3/4/2010 PASS
DetailsJon R. Gunnerson
No changes to sewer service.
Routing - FIRE2/3/20102/3/20102/10/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to architect.
1st review completed  2/10/2010 FAIL
Failed PW, Plan Check, Fire
Route to Impact Fee Review2/3/20102/8/20102/9/2010 PASS
DetailsCindy M. Gould
Remodle of existing building no impact fees
Plan resubmittals requested  2/3/2010 DONE
Copy of plan review resubmittal requirements e-mailed to architect.
Telephone call  2/3/2010 DONE
Called Structural Engineer, Chad Gilton, ###-####, to review differences between the submitted engineering design calcs and details and structural plan sheets. Told him I was requesting resubmittals through the architect to bring the two documents to indicate the same requirements.
Routing - PLAN CHECK1/20/2010 2/3/2010 FAIL
DetailsDan Stuart
Erosion Sediment & Control permit is attacted to Demo permit BLD09-02080. Routing to fire code analyst for review.
Routing - Design Review1/19/2010 1/20/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH09-00259
Routing - PLUMBING1/14/2010 1/19/2010 PASS
DetailsBill VanDegrift
provide 4" drain to water softener. update pipesizes at 1st floor restrooms to tempering station to match detail.
Routing PW Environmental  1/14/2010 PASS
DetailsWalt Baumgartner
Wastewater discharged from laboratory operations must comply with pH standards per City Code 8-14.
Routing - PUBLIC WORKS1/8/2010 1/14/2010 FAIL
DetailsConnie Baumgartner
Failed by Jon Gunnerson - ###-####
Application received 1/7/20101/8/2010 DONE
DetailsTisha Gallop
Pending Assignment by JCB1/8/2010 1/8/2010 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  1/7/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/7/2010 DONE
DetailsTisha Gallop