Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00053
StatusFinaled
Name CM COMPANY
Site Address 775 E PARKCENTER BLVD
Project NameIdaho Central Credit Union
Customer Number 
ePlanReviewNo
Description
Idaho Central Credit Union - To construct a new 6,145 square foot, one story, wood framed credit union office building and related site improvements. The main office area is 4,625 square feet, the three lane roof covered drive-thru is 1,520 square feet. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/8/201011/24/2010 DONE
Second Notice 10/21/201010/21/2010 DONE
First Notice 9/27/201010/11/2010 DONE
BLD-Final9/16/20109/17/20109/17/2010APASS
DetailsJim Storey
Tom Phone #: ###-#### final ok
Zoning Approval9/17/20109/17/20109/17/2010 DONE
DetailsJoshua Johnson
Permanent Occupancy  9/17/2010  
FIRE-Final Inspection9/14/20109/15/20109/15/2010PPASS
DetailsForrest France
Fire life safety inspection completed acceptable.
FIRE-Conference9/2/20109/2/20109/2/2010PDONE
DetailsForrest France
Discussion with contractor regarding exit sign placement.
BLD-Framing/Rough-in8/26/20108/26/20108/26/2010PPASS
DetailsJim Storey
Ceiling grid exterior please-Tom Phone #: ###-####
BLD-Framing/Rough-in8/20/20108/20/20108/20/2010PPART
DetailsJim Storey
Ceiling grid-Tom Phone #: ###-#### need ele c/n aproved/ need perimiter wires with in 8 inched.
BLD-Framing/Rough-in8/19/20108/20/20108/20/2010ANR
DetailsJim Storey
Ceiling grid-Tom Phone #: ###-#### need ele insp.
BLD-Energy code compliance7/1/20107/6/20107/6/2010APART
DetailsJim Storey
Tom Phone #: ###-#### need to check soffit drops at ceilling insp.
BLD-Framing/Rough-in6/30/20107/1/20107/1/2010PPASS
DetailsJim Storey
Tom Phone #: ###-####
BLD-Framing/Rough-in6/14/20106/15/20106/15/2010APASS
DetailsJim Storey
Wall nailing on the exterior shear inspection please ###-#### Tom ok for cover.
Routing - PLANNING6/9/2010 6/10/2010 PASS
DetailsJosh Wilson
Revised sheet L-1.1 ok per DRH09-00230
Plan resubmittals received  6/9/2010 DONE
DetailsTisha Gallop
received transmittal and one copy of plan sheets C1.3, L1.5, L2.1, L2.5, L2.6 (relocated monument sign); per JCM ok to accept plans and taken to him.
Plan Reviewer's activity  6/9/2010 DONE
DetailsJohn Menard
Inserted revise landscaping and civil plans. JCM
BLD-Framing/Rough-in6/8/20106/8/20106/8/2010APART
DetailsJim Storey
reviewed roof nailling with struc. engineer ok to instal roof insulation.
BLD-Footing4/12/20104/13/20104/13/2010PPART
DetailsJim Storey
Column footings--pouring at 2 Phone #: ###-#### si sch / rebar ok
BLD-Foundation4/8/20104/9/20104/9/2010APART
DetailsJim Storey
Tom Phone #: ###-#### walls ok placed with si oversite pending report/ interior pads ok pending si reports
BLD-Footing4/1/20104/2/20104/2/2010PPART
DetailsJim Storey
tom Phone #: ###-#### rebar ok si pending report ok
Issue PAID IN FULL permit  2/23/2010 DONE
DetailsTisha Gallop
Telephone call  2/18/2010 DONE
Details
left vm for casey at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  2/18/2010 DONE
Details
Plan assigned to (JCM)1/11/2010 2/17/2010 PASS
DetailsJohn Menard
2/17/2010 11:36:04 JCM - activity updated through activity BLDA022 from case BLD10-00053.
Routing - PUBLIC WORKS2/11/2010 2/17/2010 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK2/17/2010 2/17/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  2/17/2010 DONE
DetailsJohn Menard
Plan Reviewer's activity  2/17/2010 DONE
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Print Occupancy Form  2/17/2010 DONE
Details
Routing PW Drainage2/11/2010 2/16/2010 PASS
DetailsBrian Murphy
Routing - PLAN CHECK2/10/2010 2/11/2010  
DetailsJohn Menard
Routing - FIRE2/5/20102/5/20102/10/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals received  2/10/2010  
DetailsJohn Menard
Rec'd two copies of sheets A6.2 and A6.0- inserted by arch rep and taken back to fire review
1st review completed  2/10/2010 FAIL
Failed Public Works,Structural, Plumbing, Planning, Plan Check
Route to Impact Fee Review2/5/20102/10/20102/9/2010 PASS
DetailsCindy M. Gould
Plan resubmittals requested  2/5/2010 DONE
DetailsJohn Menard
Emailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK1/29/2010 2/5/2010 FAIL
DetailsJohn Menard
Plan resubmittals received  2/2/2010 DONE
Details
rec'd 5 sheets C1.2 - taken to john menard
Routing - PLANNING Land Div1/29/2010 1/29/2010 PASS
DetailsDave Abo
Parcels have been combined and new Tax Parcel Number has been issued by Assesssor.
Plan resubmittals received  1/29/2010 DONE
DetailsJohn Menard
Received emailed response letter from project engineer for structural review comments. JCM
Routing - PLANNING1/25/2010 1/28/2010 PASS
DetailsJoshua Johnson
Pass DR- DRH09-00230 - Josh Wilson -- CUP09-00065 - Josh Johnson
Routing - PLUMBING1/21/2010 1/25/2010 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing PW Sewer Rating  1/21/2010 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment1/21/2010 1/21/2010 PASS
DetailsSteven Webb
ESC plan is approved along with the attached conditions. ESC10-00013
Routing - PUBLIC WORKS1/11/2010 1/21/2010 FAIL
DetailsConnie Baumgartner
Routing PW Solid Waste1/20/2010 1/20/2010 PASS
DetailsPeter J. McCullough
Routing PW Drainage  1/20/2010 FAIL
DetailsBrian Murphy
NEEDS SWALE REVISIONS AND REVISION TO O AND M. BRIAN MURPHY ###-####
Plan resubmittals requested  1/15/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural plan review comment list requesting revisions. JCM
Routing Off Site - STRUCTURAL1/11/2010 1/15/2010 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Routing PW Street Lights  1/13/2010 PASS
DetailsHank Alarcon
Routing - Addressing1/12/2010 1/12/2010 PASS
DetailsApril Wing
Routing PW Sewer Design1/12/2010 1/12/2010 PASS
DetailsJon R. Gunnerson
connect onto existing sewer service
CHANGE STATUS TO (REV)  1/11/2010 DONE
Routing - PLANNING Land Div1/11/2010 1/11/2010 FAIL
DetailsDave Abo
Must provide copy of recorded Notice of Buildable Parcel for Lot Consolidation, Deed and new Tax Parcel Number.
Recd Pcfee & Taken To Pln CK  1/11/2010 DONE
Details
Plans ACCEPTED BY PLAN TECH  1/11/2010 DONE
Details
Pending Assignment by JCM1/11/2010 1/11/2010 BLDA
DetailsJohn Menard
1/11/2010 13:19:56 JCM - activity updated through activity BLDA166 from case BLD10-00053.
Application received 1/11/2010