Third Notice | | 12/8/2010 | 11/24/2010 | | DONE |
|
|
|
|
Second Notice | | 10/21/2010 | 10/21/2010 | | DONE |
|
|
|
|
First Notice | | 9/27/2010 | 10/11/2010 | | DONE |
|
|
|
|
BLD-Final | 9/16/2010 | 9/17/2010 | 9/17/2010 | A | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-#### final ok
|
Zoning Approval | 9/17/2010 | 9/17/2010 | 9/17/2010 | | DONE |
Joshua Johnson
|
|
|
|
Permanent Occupancy | | | 9/17/2010 | | |
|
|
|
|
FIRE-Final Inspection | 9/14/2010 | 9/15/2010 | 9/15/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection completed acceptable.
|
FIRE-Conference | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | DONE |
Forrest France
|
|
|
Discussion with contractor regarding exit sign placement.
|
BLD-Framing/Rough-in | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Jim Storey
|
|
|
Ceiling grid exterior please-Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PART |
Jim Storey
|
|
|
Ceiling grid-Tom Phone #: ###-#### need ele c/n aproved/ need perimiter wires with in 8 inched.
|
BLD-Framing/Rough-in | 8/19/2010 | 8/20/2010 | 8/20/2010 | A | NR |
Jim Storey
|
|
|
Ceiling grid-Tom Phone #: ###-#### need ele insp.
|
BLD-Energy code compliance | 7/1/2010 | 7/6/2010 | 7/6/2010 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### need to check soffit drops at ceilling insp.
|
BLD-Framing/Rough-in | 6/30/2010 | 7/1/2010 | 7/1/2010 | P | PASS |
Jim Storey
|
|
|
Tom Phone #: ###-####
|
BLD-Framing/Rough-in | 6/14/2010 | 6/15/2010 | 6/15/2010 | A | PASS |
Jim Storey
|
|
|
Wall nailing on the exterior shear inspection please ###-#### Tom ok for cover.
|
Routing - PLANNING | 6/9/2010 | | 6/10/2010 | | PASS |
Josh Wilson
|
|
|
Revised sheet L-1.1 ok per DRH09-00230
|
Plan resubmittals received | | | 6/9/2010 | | DONE |
Tisha Gallop
|
|
|
received transmittal and one copy of plan sheets C1.3, L1.5, L2.1, L2.5, L2.6 (relocated monument sign); per JCM ok to accept plans and taken to him.
|
Plan Reviewer's activity | | | 6/9/2010 | | DONE |
John Menard
|
|
|
Inserted revise landscaping and civil plans. JCM
|
BLD-Framing/Rough-in | 6/8/2010 | 6/8/2010 | 6/8/2010 | A | PART |
Jim Storey
|
|
|
reviewed roof nailling with struc. engineer ok to instal roof insulation.
|
BLD-Footing | 4/12/2010 | 4/13/2010 | 4/13/2010 | P | PART |
Jim Storey
|
|
|
Column footings--pouring at 2 Phone #: ###-#### si sch / rebar ok
|
BLD-Foundation | 4/8/2010 | 4/9/2010 | 4/9/2010 | A | PART |
Jim Storey
|
|
|
Tom Phone #: ###-#### walls ok placed with si oversite pending report/ interior pads ok pending si reports
|
BLD-Footing | 4/1/2010 | 4/2/2010 | 4/2/2010 | P | PART |
Jim Storey
|
|
|
tom Phone #: ###-#### rebar ok si pending report ok
|
Issue PAID IN FULL permit | | | 2/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 2/18/2010 | | DONE |
|
|
|
left vm for casey at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 2/18/2010 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 1/11/2010 | | 2/17/2010 | | PASS |
John Menard
|
|
|
2/17/2010 11:36:04 JCM - activity updated through activity BLDA022 from case BLD10-00053.
|
Routing - PUBLIC WORKS | 2/11/2010 | | 2/17/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 2/17/2010 | | 2/17/2010 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/17/2010 | | DONE |
John Menard
|
|
|
|
Plan Reviewer's activity | | | 2/17/2010 | | DONE |
John Menard
|
|
|
Reviewed and approved structural and nonstructural revisions. JCM
|
Print Occupancy Form | | | 2/17/2010 | | DONE |
|
|
|
|
Routing PW Drainage | 2/11/2010 | | 2/16/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/10/2010 | | 2/11/2010 | | |
John Menard
|
|
|
|
Routing - FIRE | 2/5/2010 | 2/5/2010 | 2/10/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan resubmittals received | | | 2/10/2010 | | |
John Menard
|
|
|
Rec'd two copies of sheets A6.2 and A6.0- inserted by arch rep and taken back to fire review
|
1st review completed | | | 2/10/2010 | | FAIL |
|
|
|
Failed Public Works,Structural, Plumbing, Planning, Plan Check
|
Route to Impact Fee Review | 2/5/2010 | 2/10/2010 | 2/9/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Plan resubmittals requested | | | 2/5/2010 | | DONE |
John Menard
|
|
|
Emailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 1/29/2010 | | 2/5/2010 | | FAIL |
John Menard
|
|
|
|
Plan resubmittals received | | | 2/2/2010 | | DONE |
|
|
|
rec'd 5 sheets C1.2 - taken to john menard
|
Routing - PLANNING Land Div | 1/29/2010 | | 1/29/2010 | | PASS |
Dave Abo
|
|
|
Parcels have been combined and new Tax Parcel Number has been issued by Assesssor.
|
Plan resubmittals received | | | 1/29/2010 | | DONE |
John Menard
|
|
|
Received emailed response letter from project engineer for structural review comments. JCM
|
Routing - PLANNING | 1/25/2010 | | 1/28/2010 | | PASS |
Joshua Johnson
|
|
|
Pass DR- DRH09-00230 - Josh Wilson -- CUP09-00065 - Josh Johnson
|
Routing - PLUMBING | 1/21/2010 | | 1/25/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing PW Sewer Rating | | | 1/21/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 1/21/2010 | | 1/21/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved along with the attached conditions. ESC10-00013
|
Routing - PUBLIC WORKS | 1/11/2010 | | 1/21/2010 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 1/20/2010 | | 1/20/2010 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Drainage | | | 1/20/2010 | | FAIL |
Brian Murphy
|
|
|
NEEDS SWALE REVISIONS AND REVISION TO O AND M. BRIAN MURPHY ###-####
|
Plan resubmittals requested | | | 1/15/2010 | | DONE |
John Menard
|
|
|
E-mailed the architect a copy of the structural plan review comment list requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 1/11/2010 | | 1/15/2010 | | FAIL |
John Menard
|
|
|
Received comment list from consulting structural engineer requesting revisions. JCM
|
Routing PW Street Lights | | | 1/13/2010 | | PASS |
Hank Alarcon
|
|
|
|
Routing - Addressing | 1/12/2010 | | 1/12/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Design | 1/12/2010 | | 1/12/2010 | | PASS |
Jon R. Gunnerson
|
|
|
connect onto existing sewer service
|
CHANGE STATUS TO (REV) | | | 1/11/2010 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 1/11/2010 | | 1/11/2010 | | FAIL |
Dave Abo
|
|
|
Must provide copy of recorded Notice of Buildable Parcel for Lot Consolidation, Deed and new Tax Parcel Number.
|
Recd Pcfee & Taken To Pln CK | | | 1/11/2010 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/11/2010 | | DONE |
|
|
|
|
Pending Assignment by JCM | 1/11/2010 | | 1/11/2010 | | BLDA |
John Menard
|
|
|
1/11/2010 13:19:56 JCM - activity updated through activity BLDA166 from case BLD10-00053.
|
Application received | | 1/11/2010 | | | |
|
|
|
|