First Notice | | 3/20/2010 | 4/2/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 3/10/2010 | 3/10/2010 | 3/10/2010 | P | PASS |
Jim Storey
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 3/10/2010 | | DONE |
|
|
|
|
BLD-Final | 3/5/2010 | 3/5/2010 | 3/5/2010 | P | PART |
Jim Storey
|
|
|
Rich Phone #: ###-#### plm on temp/ mech n/a. ok for final pending plm.
|
FIRE-Final Inspection | 3/3/2010 | 3/4/2010 | 3/4/2010 | A | PASS |
Forrest France
|
|
|
Life safety inspection completed satisfactory, fire extinguishers serviced while on site, contractor provided missing signage at the main entry/exit door as requested.
|
BLD-Final | 3/3/2010 | 3/4/2010 | 3/4/2010 | A | NR |
Jim Storey
|
|
|
Rich Phone #: ###-####
|
Override - Parcel Holds | | | 3/3/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 3/3/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/3/2010 | | DONE |
|
|
|
called left message for Dana permit ready and fee given 3-3-10 dld
|
Case Summary (BLD) | | | 3/3/2010 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/3/2010 | | DONE |
Tisha Gallop
|
|
|
plan mod paid for and picked up
|
Plan assigned to (CDM) | 2/26/2010 | 2/26/2010 | 3/2/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 3/2/2010 | | 3/2/2010 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLUMBING | 3/1/2010 | | 3/2/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Case Summary (BLD) | | | 3/2/2010 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/2/2010 | | |
|
|
|
|
Routing PW Sewer Rating | 3/1/2010 | | 3/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PUBLIC WORKS | 2/26/2010 | | 3/1/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 2/26/2010 | | 2/26/2010 | | PASS |
April Wing
|
|
|
|
Plan Modification Accepted | | | 2/26/2010 | | |
Tisha Gallop
|
|
|
Plan modification accepted for Bld10-00065 (Dental Impact Center) for (2) additional sinks & cabinets will be added to exam 103. Vac & air will be installed in exam 103 & vac in 107. These will be tied to the new air compressor, vac pump & floor sink being installed in the new storage closet in the existing toilet 106 room. Flooring & ceiling will be removed & a bi-fold door will be installed to accommodate the new storage closet in toilet 106. An alternate door will be put in exam 103.//submitted on P1.0, P2.0, and revised cert of value; per CDM routed to PW and plumbing.
|
BLD-Framing/Rough-in | 2/5/2010 | 2/5/2010 | 2/5/2010 | P | PART |
Jim Storey
|
|
|
after 3 pm please//Rich Phone #: ###-#### plan modifacation required for plm fixtures. ok to cover walls and loby ceilling.
|
Issue PAID IN FULL permit | | | 1/25/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/21/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 1/21/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/21/2010 | | DONE |
Barbara Stitt
|
|
|
Called Rich and told him permit is ready & fees due @ 11:35am 1-21-10 BAS
|
Plan assigned to (CDM) | 1/12/2010 | 1/12/2010 | 1/20/2010 | | PASS |
Carl D Madsen
|
|
|
1/20/2010 07:47:57 CDM - activity updated through activity BLDA022 from case BLD10-00065.
|
Case Summary (BLD) | | | 1/20/2010 | | DONE |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2010 | | |
|
|
|
|
Routing - PLAN CHECK | 1/13/2010 | | 1/19/2010 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | | | 1/19/2010 | | PASS |
|
|
|
Verify in field CDM
|
1st review completed | | | 1/19/2010 | | DONE |
|
|
|
|
Routing PW Environmental | 1/14/2010 | | 1/14/2010 | | PASS |
Walt Baumgartner
|
|
|
Proper management of dental office wastes is required. Silver and Hg waste recovery required in accordance with Dental Office Best Management Practices per City code 8-14. Call ###-#### for more information
|
Routing - PUBLIC WORKS | 1/12/2010 | | 1/13/2010 | | PASS |
Beverly Hall
|
|
|
|
Routing - Addressing | 1/13/2010 | | 1/13/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 1/13/2010 | | 1/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 1/12/2010 | 1/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2010 | | DONE |
Tisha Gallop
|
|
|
|