BLD-Final | 5/9/2012 | 5/9/2012 | 5/9/2012 | P | PASS |
Mike Jordan
|
|
|
Fire sprinkler installation complete and passed, no electrical installed per doug P. Ok for final occupancy.
|
CHANGE STATUS TO (ISS) | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
Per Bob A
|
Letter of compliance/Occupancy | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
|
DOC - Permit Finaled | | | 5/9/2012 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 9/26/2011 | | |
|
|
|
|
Case Summary (BLD) | | | 4/14/2011 | | |
|
|
|
|
Telephone call | | | 4/5/2011 | | DONE |
Jason Blais
|
|
|
Called Scott Grady of Dave Evans Construction to notify him this permit needs to be re-activated and all required inspections conducted in order to bring the addition (constructed without a permit) into compliance with adopted building codes. He stated he would look into and call me back.
|
BLD-Aging Inspection | 11/30/2010 | 11/30/2010 | 11/30/2010 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 11/30/2010 | 11/30/2010 | 11/30/2010 | A | PASS |
Mike Jordan
|
|
|
Contractor or ownedr has made no effort to get required inspections. Permit is expired.
|
BLD-Aging Inspection | 5/13/2010 | 5/13/2010 | 5/13/2010 | | PEND |
Mike Jordan
|
|
|
Called Scott with zach evans construction to get status on job. Scott noted that he would contacted me with information after speakinf with the architect and owner. I told scott that if needed we could schedule a building conferance with myself and life/safwty inspector to go over what insprections and paperwork would be required. This addition was completed with no permits and no inspections.
|
Override - People Holds | | | 2/5/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/5/2010 | | DONE |
|
|
|
|
OVERRIDE | | | 2/3/2010 | | |
|
|
|
|
OVERRIDE | | | 2/3/2010 | | |
|
|
|
|
Telephone call | | | 2/3/2010 | | DONE |
Barbara Stitt
|
|
|
Called Dave Evans Construction and spoke with Scott-informed him that permit is ready for pick-up, that we need a current RP license, ACHD info, and the fees that are due @ 9:30am on 2-3-10 BAS
|
Override - People Holds | | | 2/3/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 2/3/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 2/1/2010 | | 2/2/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved along with the ESC permit attached conditions. ESC10-00023
|
Routing - PLAN CHECK | 2/2/2010 | | 2/2/2010 | | PASS |
Sam Zahorka
|
|
|
Sam Z.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2010 | | DONE |
Sam Zahorka
|
|
|
|
Inspection Record Card- Bld | | | 2/2/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (SRZ) | 1/12/2010 | | 2/2/2010 | | PASS |
Sam Zahorka
|
|
|
2/2/2010 11:45:37 SRZ - activity updated through activity BLDA022 from case BLD10-00067.
|
Routing - PLAN CHECK | 1/29/2010 | | 2/1/2010 | | PEND |
Sam Zahorka
|
|
|
|
Routing - FIRE | 1/26/2010 | 1/26/2010 | 1/29/2010 | | PASS |
Scott Arellano
|
|
|
Approved with no seperate attached comments. No change in fire flow requirement. Existing means of egress shall be maintained.
|
1st review completed | | | 1/29/2010 | | FAIL |
|
|
|
Failed Erosion & Soil Control
|
Route to Impact Fee Review | 1/26/2010 | 1/29/2010 | 1/28/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Case Summary (BLD) | | | 1/26/2010 | | DONE |
Sam Zahorka
|
|
|
|
Routing - PLAN CHECK | 1/14/2010 | | 1/26/2010 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 1/14/2010 | | |
Tisha Gallop
|
|
|
received esc application and waiver request letter. Put with plans and taken back to Sam Zahorka.
|
Routing - Erosion and Sediment | 1/13/2010 | | 1/14/2010 | | FAIL |
Steven Webb
|
|
|
No ESC plan or plan waiver submitted.
|
Routing - PLANNING | 1/14/2010 | | 1/14/2010 | | PASS |
Josh Wilson
|
|
|
DRH09-00318
|
Routing - PLUMBING | 1/14/2010 | | 1/14/2010 | | PASS |
Bill VanDegrift
|
|
|
no plumbing
|
Routing - PUBLIC WORKS | 1/12/2010 | | 1/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/13/2010 | | 1/13/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Drainage | 1/13/2010 | | 1/13/2010 | | PASS |
Brian Murphy
|
|
|
less than 1000sq redevelopment
|
Routing PW Sewer Rating | 1/13/2010 | | 1/13/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING Land Div | 1/12/2010 | | 1/12/2010 | | PASS |
Dave Abo
|
|
|
Lot 19, Block 1 of West Boise Industrial Park #6.
|
Plans ACCEPTED BY PLAN TECH | | | 1/12/2010 | | DONE |
|
|
|
plans accepted without ESC permit or waiver - Perry has called the customer to bring in the necessary documentation
|
Recd Pcfee & Taken To Pln CK | | | 1/12/2010 | | DONE |
|
|
|
|
Pending Assignment by JCM | 1/12/2010 | | 1/12/2010 | | BLDA |
John Menard
|
|
|
1/12/2010 13:21:56 JCM - activity updated through activity BLDA160 from case BLD10-00067.
|
Application received | | 1/12/2010 | | | |
|
|
|
|