Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD10-00079
StatusFinaled
Name BRIGHTON HOMES LLC
Site Address 3960 S GLOBE THEATRE AVE
Project NameRiver Heights Community Center
Customer Number 
ePlanReviewNo
Description
River Heights Community Center - To construct a new 3,325 square foot, one story, wood framed subdivision community center with a 200 square foot, wood trellis entry cover. This permit also includes related site improvements. This building contains a multi-purpose gathering room, a fitness room, large entry foyer, accessible restrooms and storage and utility rooms. All construction per the approved plans and attached comment list.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/25/201110/18/2011 DONE
Telephone call  10/18/2011 DONE
DetailsTisha Gallop
called Brighton Corp and left vm for Lynn Jenkins (signed the Final cert of value) final value fees due in the amt of $2,170.98. I said can pay online or mail in check.
Third Notice 9/26/201110/10/2011 DONE
faxed
Third Notice 8/30/20119/12/2011 DONE
faxed
Second Notice 8/21/20118/25/2011 DONE
First Notice 7/2/20118/11/2011 DONE
Permanent Occupancy  6/22/2011 DONE
DetailsChristina Prado
Print Occupancy Form  4/27/2011 DONE
DetailsBarbara Stitt
BLD-Final4/14/20114/15/20114/15/2011APASS
DetailsDave Hannah
Call Braxton to meet inspector on site. Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD-Final3/2/20113/4/20113/7/2011APART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman ok for temp occ ok for perm occ after ada lift for pool is on site
Zoning Approval3/4/20113/4/20113/4/2011  
DetailsSarah Schafer
BLD-Wall cover2/22/20112/22/20112/22/2011PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman sheer wall in mec room bathroon and blocking iat top of trusses
BLD-Conference1/27/20111/28/20111/28/2011PPART
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by brandon waltman went over new plans
BLD-Aging Inspection1/20/20111/20/20111/25/2011 PASS
DetailsDave Hannah
CHANGE STATUS TO (ISS)  1/19/2011 DONE
DetailsTisha Gallop
plan mod paid for and picked up
Plan assigned to (JCM)12/28/201012/28/20101/18/2011 PASS
DetailsJohn Menard
Routing - PLAN CHECK1/14/2011 1/18/2011 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  1/18/2011 DONE
DetailsJohn Menard
Print Occupancy Form  1/18/2011 DONE
Override - Parcel Holds  1/18/2011  
Permit Ready to Issue  1/18/2011 DONE
DetailsTisha Gallop
called Ryan McCaene and told him plan mod is ready and fees.
Routing - FIRE1/11/2011 1/14/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK1/5/2011 1/11/2011 PASS
DetailsJohn Menard
Routing - PLANNING1/5/2011 1/5/2011 PASS
DetailsSarah Schafer
Approved per DRH10-00314.
Plan Modification Accepted  12/28/2010 DONE
plan modification excepted for BLD10-00079 To change roof from dimensional framing to trusses typical,building changed from separated uses to non-separated uses,allowing removal of 1-hour condition at pool equipment room.Removal of trash enclosure.Relocation of mechanical units to the attic. Reconfiguration of serving kitchen in gathering room 101. Increase gathering room 101 interior area from 632 sq ft to 924 s q ft with associated increase in occupant load from 46/98 to 62/132. Sheets affected are G0.01,AS1.12,A1.10,A1.40,A1.60,A2.01,A3.01,A3.02,A4.10,A5.5,S1.0,S1.1,S4.0,S7.0a0,S7.0b,M2.10,P2.10
BLD-Aging Inspection11/8/201011/8/201011/9/2010 FAIL
DetailsDave Hannah
up to zoning
Plan Reviewer's activity  9/13/2010 DONE
DetailsJason Blais
Sent email on 9/10/2010 to architect asking about possible changes to the design of the building and site. Inquired if plan modifiction/resubmittals will be coming into the office. Also inquired about a possible connection of an exterior shower to the stormwater system instead of sanitary sewer.

9/13/10 Cabal Architects emailed back stating that they are no longer a part of the project. Sent new email to Peter Oliver of Brighton Corporation explaining the situation and for a contact to address the situation. Approval through Planning & Zoning is required and a Plan Modification is required to be submitted to the Building Division. Plans will need to done by a design professional. A new registered design professional in charge also needs to be designated with a new form completed.
FIRE-Final Inspection9/3/20109/7/20109/10/2010APASS
DetailsForrest France
Life safety passed, door hardware at the main entry to be installed prior to structural final as discussed.
BLD-Final9/3/20109/7/20109/7/2010ANR
DetailsDave Hannah
john Phone #: ###-#### needs fire zoning finals and to resubmit plans
BLD-Energy code compliance7/7/20107/8/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Energy code compliance7/6/20107/7/20107/7/2010PPASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Framing/Rough-in7/7/20107/7/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger
BLD-Framing/Rough-in7/6/20107/7/20107/7/2010APASS
DetailsDave Hannah
Inspection requested from web by: John Cloninger trusses are ok ok to insulate ceiling
BLD-Framing/Rough-in7/6/20107/6/20107/7/2010APART
DetailsDave Hannah
Inspection requested from web by: John Cloninger walls ok but need to look at truss enginering
BLD-Framing/Rough-in6/23/20106/24/20106/24/2010APASS
DetailsDave Hannah
John Phone #: ###-#### shear walls
BLD-Other6/23/20106/23/20106/23/2010PCANC
DetailsDave Hannah
John Phone #: ###-####
BLD-Foundation5/7/20105/7/20105/7/2010PPASS
DetailsDave Hannah
Ike ###-####
BLD-Footing5/5/20105/5/20105/6/2010PPART
DetailsDave Hannah
early pm as possible// John ###-#### contractor has spec inspection on site to inspect rebar and test concrerte
Issue PAID IN FULL permit  4/21/2010 DONE
Telephone call  3/9/2010 DONE
Details
t/c w bob at ###-#### - gave new fee amount (changes in sewer fees)
Routing - PUBLIC WORKS3/5/2010 3/8/2010 PASS
DetailsBrian Murphy
Brian approved, indicating final needed revisions will be worked out with his field inspector. JCM
Plan assigned to (JCM)1/19/2010 3/8/2010 PASS
DetailsJohn Menard
3/8/2010 13:01:37 JCM - activity updated through activity BLDA022 from case BLD10-00079.
Routing - PLAN CHECK3/8/2010 3/8/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  3/8/2010 DONE
DetailsJohn Menard
Print Occupancy Form  3/8/2010 DONE
Details
Telephone call  3/8/2010 DONE
Details
t/c w bob at ###-#### - permit ready and fees given - also need gc name, rce# and ACHD receipt
Permit Ready to Issue  3/8/2010 DONE
Details
Routing - PLAN CHECK3/4/2010 3/5/2010 PASS
DetailsJohn Menard
Plan Reviewer's activity  3/5/2010 PASS
DetailsJohn Menard
Reviewed and approved structural and nonstructural revisions. JCM
Plan resubmittals received  3/4/2010  
DetailsJohn Menard
Rec'd response letter, 3 copies of structrual calcs, and 2 copies of sheets G0.01; G0.02; AS1.11; AS1.12; A1.10; A1.40; A1.60; A2.01; A3.01; A3.02; A4.10; A5.50; S1.0; S1.1; S4.40; S7.0a; S7.0b; E1.10; D2.10 - Rec'd extra set of structual sheets to set to outside eng. - inserted by architect and taken back to John M.
Routing - PUBLIC WORKS3/3/2010 3/4/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage3/4/2010 3/4/2010 PASS
DetailsBrian Murphy
Routing - PUBLIC WORKS2/26/2010 3/3/2010 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy - contact at ###-####
Routing PW Drainage2/26/2010 3/3/2010 FAIL
DetailsBrian Murphy
NEEDS MONITORING WELL AND POSSIBLE REVISIONS
Routing - PLAN CHECK3/3/2010 3/3/2010  
DetailsJohn Menard
Routing - PLAN CHECK2/25/2010 2/26/2010  
DetailsJohn Menard
Routing - FIRE2/19/20102/19/20102/25/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan resubmittals received  2/25/2010  
DetailsTisha Gallop
received three copies of plan sheets C1.00, C1.10, C1.50; plans were turned into PW, Brian Murphy brought them to permit desk and plans inserted by LEG and taken back to Fire Review.
1st review completed  2/25/2010 FAIL
Failed Public Works, Structural, Plan Check
Route to Impact Fee Review2/19/20102/24/20102/23/2010 PASS
DetailsCindy M. Gould
Plan resubmittals requested  2/19/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK2/1/2010 2/19/2010 FAIL
DetailsJohn Menard
Plan resubmittals received  2/9/2010  
DetailsTisha Gallop
received transmittal, two copies of storm water drainage report, O & M, one copy of shallow injection well form, five copies of plan sheets C1.00, C1.10, C1.50; inserted by arch. rep. and taken back to John Menard
Plan resubmittals requested  2/4/2010 DONE
DetailsJohn Menard
Emailed the architect a copy of the structural review requesting revisions. JCM
Routing Off Site - STRUCTURAL1/20/2010 2/3/2010 FAIL
DetailsJohn Menard
Received structural comment list requesting revisions. JCM
Routing - PLANNING1/19/2010 2/1/2010 PASS
DetailsSarah Schafer
Approved per DRH10-00004.
Routing - PLUMBING1/28/2010 2/1/2010 PASS
DetailsBill VanDegrift
min. 1" branch to urinal.
Routing - Erosion and Sediment1/26/2010 1/28/2010 PASS
DetailsSteven Webb
ESC plan approved along with the permit attached conditions. ESC10-00025
Routing PW Solid Waste1/26/2010 1/27/2010 PASS
DetailsPeter J. McCullough
Approved for carts only (no dumpsters)
Routing PW Sewer Design1/26/2010 1/26/2010 PASS
DetailsJon R. Gunnerson
Connect to existing service provided.
Routing PW Drainage1/22/2010 1/26/2010 FAIL
DetailsBrian Murphy
NEEDS GEO TECH REPORT SWALE AND SEEPAGE BED WITH ASTM C33 SAND. BRIAN MURPHY ###-####
Routing - PUBLIC WORKS1/20/2010 1/26/2010 FAIL
DetailsConnie Baumgartner
Routing PW Sewer Rating1/22/2010 1/22/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing1/21/2010 1/21/2010 PASS
DetailsApril Wing
Routing - PLANNING Land Div1/19/2010 1/20/2010 PASS
DetailsTodd Tucker
Plans ACCEPTED BY PLAN TECH  1/19/2010 DONE
Pending Assignment by JCM1/19/2010 1/19/2010 BLDA
DetailsJohn Menard
1/19/2010 14:47:51 JCM - activity updated through activity BLDA166 from case BLD10-00079.
Application received 1/15/2010