Second Notice | | 7/3/2010 | 7/15/2010 | | DONE |
Barbara Stitt
|
|
|
|
First Notice | | 5/31/2010 | 6/23/2010 | | DONE |
|
|
|
|
BLD-Final | 5/20/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Mike Jordan
|
|
|
Hello Mike, The health department should complete their inspection by 3:30 So I was wondering if you could schedule this final for 3:45. Thank you, Mark Inspection requested from web by: Mark Bowen. Will be ok for perm. occ. once CDHD signs off.
|
Permanent Occupancy UNPAID FEE | | | 5/21/2010 | | DONE |
Tisha Gallop
|
|
|
|
FIRE-Final Inspection | 5/19/2010 | 5/20/2010 | 5/20/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Other | 5/10/2010 | 5/11/2010 | 5/11/2010 | P | PART |
Mike Jordan
|
|
|
We are completing the kitchen ceiling grid. An early afternoon inspection would be helpful so we can finish the ceiling tile. I am calling for afternoon but a just before lunch inspection would work as well. Thank you for your consideration. Inspection requested from web by: Mark Bowen Phone #: ###-####. grid in backroom ok. pend. elec. perimeter tile were already installed. Told contractor that ele. inspector may request to have perimeter tile removed.
|
BLD-Other | 5/10/2010 | 5/10/2010 | 5/10/2010 | P | PART |
Mike Jordan
|
|
|
Ceiling grid in kitchen area only.
|
BLD-Framing/Rough-in | 5/4/2010 | 5/4/2010 | 5/4/2010 | P | PART |
Mike Jordan
|
|
|
Ceiling grid inspection please-Mark Phone #: ###-####. Grid in dining room only.
|
FIRE-Conference | 4/30/2010 | 4/30/2010 | 5/3/2010 | P | DONE |
Troy Cobbley
|
|
|
I went over IMC requirements with the contractor and deferred many of them to the mechanical inspector.
|
BLD-Framing/Rough-in | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | PASS |
Mike Jordan
|
|
|
mark Phone #: ###-####. Interior framed walls only. No grid.
|
(F) Reprint permit | | | 3/23/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/8/2010 | | DONE |
|
|
|
received 2 copies of sheets A-1, A-2, A-4 taken to Carl W
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/8/2010 | | DONE |
|
|
|
|
Plan Review Report | | | 3/8/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/8/2010 | | DONE |
|
|
|
left vm for jerrie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/8/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 3/8/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/19/2010 | | 3/8/2010 | | PASS |
Carl Westfall
|
|
|
3/8/2010 14:22:58 CJW - activity updated through activity BLDA022 from case BLD10-00084.
|
Routing - PLAN CHECK | 3/4/2010 | | 3/8/2010 | | PASS |
Carl Westfall
|
|
|
Reviewed and inserted drawings that show the Men's restroom accessible to the disabled.
|
Telephone call | | | 3/4/2010 | | DONE |
|
|
|
Called Jerrie Wolfe, Architect, explained what plan revisions need to be made. Told him that we need full sized revised sheets.
|
Routing - PLAN CHECK | 2/8/2010 | | 3/4/2010 | | FAIL |
Carl Westfall
|
|
|
Completed the resubmittal review. All issues noted in the plan review report have been resolved. The only remaining issue is the changes the architect made to a restroom. The original drawings were code compliant, the revised drawings were not. The drawings need to be revised to show enough wall area next to a toilet to accommodate the full length grab bar.
|
Plan resubmittals received | | | 2/26/2010 | | |
Tisha Gallop
|
|
|
received two copies of response to review, structural engineering, and plan sheets A-1, A-2, A-2.1, A-3, A-4, M, MG-1, E-1; taken to Carl Westfall
|
Route to Impact Fee Review | 2/3/2010 | 2/8/2010 | 2/9/2010 | | PASS |
Cindy M. Gould
|
|
|
tenant improvement no impact fees
|
Routing - FIRE | 2/3/2010 | 2/3/2010 | 2/8/2010 | | PASS |
Scott Arellano
|
|
|
Attached fire review comments to plan.
|
1st review completed | | | 2/8/2010 | | FAIL |
|
|
|
Fail-Plan Check
|
Routing - PLAN CHECK | 1/22/2010 | | 2/3/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on February 1, 2010 and was finished on February 3, 2010. Revised drawings were required. See the plan review report. The drawings were in Plan Review for 9 days.
|
Routing - PLUMBING | 1/21/2010 | | 1/22/2010 | | PASS |
Bill VanDegrift
|
|
|
per plans, CDHD notes on P-2, and 2003 upc
|
Routing - Design Review | 1/22/2010 | | 1/22/2010 | | PASS |
Sarah Schafer
|
|
|
Sarah Schafer - Some minor exteriror door changes
Changing door out to store frontage is appropriate and won't require a Zoning Certificate. Signed off on TI plans. 1-22-10
|
Routing - PUBLIC WORKS | 1/19/2010 | | 1/21/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 1/21/2010 | | 1/21/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved according to the attached conditions. ESC10-00029.
|
Routing PW Sewer Rating | | | 1/21/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Environmental | 1/20/2010 | | 1/21/2010 | | PASS |
Walt Baumgartner
|
|
|
West Boise Sewer District - plans revwd by Brett Morrison. All kitchen fixtures route to segragated grease line to common shell/core grease interceptor.
|
Routing - Addressing | 1/19/2010 | | 1/19/2010 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 1/15/2010 | | 1/19/2010 | | DONE |
Jason Blais
|
|
|
|
Application received | | 1/15/2010 | 1/15/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/15/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/15/2010 | | DONE |
Tisha Gallop
|
|
|
|