Letter of compliance/Occupancy | | | 9/3/2010 | | DONE |
Barbara Stitt
|
|
|
|
DOC - L/C Approved | | | 9/3/2010 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 5/25/2010 | 5/26/2010 | 5/26/2010 | A | PASS |
Dave Hannah
|
|
|
Jordan Phone #: ###-#### - call 30 mins prior to going
|
FIRE-Final Inspection | 5/26/2010 | 5/26/2010 | 5/26/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
Issue PAID IN FULL permit | | | 5/25/2010 | | DONE |
|
|
|
|
Change Expiration Date Only | | | 4/22/2010 | | DONE |
|
|
|
|
Telephone call | | | 1/25/2010 | | DONE |
Barbara Stitt
|
|
|
Called and left a message for Jim Birdsall that plans are ready, fees due, need GC and GC info @ 9:25am 1-25-10///BAS
|
Permit Ready to Issue | | | 1/25/2010 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 1/22/2010 | | DONE |
Barbara Stitt
|
|
|
|
Plan assigned to (TLW) | 1/15/2010 | | 1/21/2010 | | PASS |
Tim L. Woodard
|
|
|
Passed per scope of work as defined in the case summary only. TLW
|
Routing - PLAN CHECK | 1/15/2010 | | 1/21/2010 | | PASS |
Tim L. Woodard
|
|
|
|
Routing - FIRE | | | 1/21/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 1/21/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 1/21/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 1/15/2010 | 1/15/2010 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/15/2010 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/15/2010 | | DONE |
|
|
|
|