Third Notice | | 6/9/2010 | 6/24/2010 | | DONE |
|
|
|
FV scanned in and being processed by DLD on 6/14/10
|
Second Notice | | 5/21/2010 | 6/4/2010 | | DONE |
|
|
|
|
First Notice | | 4/29/2010 | 5/11/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/19/2010 | | DONE |
|
|
|
|
BLD-Final | 4/15/2010 | 4/16/2010 | 4/16/2010 | A | PASS |
Jim Storey
|
|
|
John Phone #: ###-#### final ok
|
FIRE-Final Inspection | 4/15/2010 | 4/15/2010 | 4/15/2010 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed, c/n items verified for completion.
|
FIRE-Final Inspection | 4/12/2010 | 4/12/2010 | 4/12/2010 | P | PART |
Forrest France
|
|
|
Final pending finishes, posting of occupant load sign per review note #5 as discussed. Remiander of fire life safety issues are complete.
|
FIRE-Conference | 4/9/2010 | 4/9/2010 | 4/9/2010 | A | DONE |
Forrest France
|
|
|
On site conference with contractor regarding fire code review notes and items needed for final fire life safety approvals. Discussed project completion date.
|
BLD-Final | 4/5/2010 | 4/6/2010 | 4/6/2010 | A | NR |
Jim Storey
|
|
|
john - suspended ceiling Phone #: ###-####
|
BLD-Other | 4/6/2010 | 4/6/2010 | 4/6/2010 | A | PASS |
Jim Storey
|
|
|
john - suspended ceiling Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 3/30/2010 | 3/31/2010 | 3/31/2010 | A | PASS |
Jim Storey
|
|
|
john Phone #: ###-####
|
FIRE-Final Inspection | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | NR |
Forrest France
|
|
|
john Phone #: ###-#### Intended for structural inspection at the new rated wall.
|
BLD-Framing/Rough-in | 3/15/2010 | 3/16/2010 | 3/16/2010 | A | PASS |
Jim Storey
|
|
|
Fire stop inspection please-John Phone #: ###-#### fire stopping ok first layer interior ok to finsh.
|
BLD-Framing/Rough-in | 3/12/2010 | 3/12/2010 | 3/12/2010 | P | PART |
Jim Storey
|
|
|
john Phone #: ###-#### need listing for pipe penatrations.
|
BLD-Framing/Rough-in | 3/5/2010 | 3/8/2010 | 3/8/2010 | P | PART |
Jim Storey
|
|
|
John Phone #: ###-#### ok to cover inside of exterior walls/ two layers of 2 hr wall ok to finsh and frame for next layers. ok to one side partitions.
|
Permit Ready to Issue | | | 2/23/2010 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 2/23/2010 | | DONE |
|
|
|
|
Routing - FIRE | 2/17/2010 | 2/17/2010 | 2/19/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Plan assigned to (DRS) | 1/20/2010 | | 2/19/2010 | | PASS |
Dan Stuart
|
|
|
2/19/2010 10:19:16 DRS - activity updated through activity BLDA022 from case BLD10-00094.
|
1st review completed | | | 2/19/2010 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 2/19/2010 | | 2/19/2010 | | PASS |
Dan Stuart
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2010 | | PASS |
|
|
|
|
Print Occupancy Form | | | 2/19/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/19/2010 | | DONE |
|
|
|
t/c w matt at ###-#### - permit ready and fees given - also need RP
|
Telephone call | | | 2/19/2010 | | DONE |
|
|
|
t/c w ed weber at ###-####- he called for permit fees
|
Telephone call | | | 2/19/2010 | | DONE |
|
|
|
t/c w kevin at Radix Const. ###-#### - permit ready and fees given - also need RP
|
Route to Impact Fee Review | 2/17/2010 | 2/22/2010 | 2/18/2010 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 1/26/2010 | | 2/17/2010 | | PASS |
Dan Stuart
|
|
|
Routing to fire code analyst for review.
|
Routing - PLANNING | 1/25/2010 | | 1/26/2010 | | PASS |
Sarah Schafer
|
|
|
Use is allowed in the R-2D zone per CUP07-00117. The addition of the one exterior door is approved through the building permit. No Zoning Certificate required.
|
Routing - PLUMBING | 1/22/2010 | | 1/25/2010 | | PASS |
Bill VanDegrift
|
|
|
mount soda r.p. over accessable mop sink or floor sink.
|
Routing - PUBLIC WORKS | 1/20/2010 | | 1/22/2010 | | PASS |
Beverly Hall
|
|
|
|
Routing - Erosion and Sediment | 1/22/2010 | | 1/22/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved along with the attached conditions. Need certified RP prior to issuance of permits. ESC10-00031
|
Routing PW Environmental | 1/21/2010 | | 1/22/2010 | | PASS |
Walt Baumgartner
|
|
|
Plans show T/S, mop sink, prep sink and one hand sink route to GI - east side. Floor sink near oda routes to domestic line.
|
Routing PW Sewer Rating | 1/22/2010 | | 1/22/2010 | | PASS |
Beverly Hall
|
|
|
|
Pending Assignment by JCB | 1/19/2010 | | 1/20/2010 | | DONE |
Jason Blais
|
|
|
|
Routing - Addressing | 1/20/2010 | | 1/20/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 1/19/2010 | 1/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/19/2010 | | DONE |
Tisha Gallop
|
|
|
|