Case Summary (BLD) | | | 4/9/2015 | | DONE |
|
|
|
|
BLD-Final | 6/3/2011 | 6/6/2011 | 6/3/2011 | A | PASS |
Tom Arcoraci
|
|
|
shelby Phone #: ###-####
|
DOC - Permit Finaled | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Tom Arcoraci
|
|
|
shelby Phone #: ###-####
|
PubWorks Occupancy Approval | 6/3/2011 | 6/3/2011 | 6/3/2011 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 5/20/2011 | 5/23/2011 | 5/23/2011 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Zoning Approval | 5/23/2011 | 5/23/2011 | 5/23/2011 | | PASS |
Andrea Tuning
|
|
|
|
BLD-Conference | 5/19/2011 | 5/20/2011 | 5/20/2011 | A | PASS |
Tom Arcoraci
|
|
|
shelby Phone #: ###-####
|
Telephone call | | | 5/19/2011 | | DONE |
Sam Zahorka
|
|
|
Agency Sign-offs identified as: Public Works, Planning & Zoning?, Fire Life Safety to obtain Final. Spoke with Tom Arcoraci the structural inspector. Building owner needs to complete outstanding shell permits prior to T.I. C of O.
|
Case Summary (BLD) | | | 4/13/2011 | | DONE |
Sam Zahorka
|
|
|
|
BLD-Aging Inspection | 3/30/2011 | 3/30/2011 | 3/30/2011 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/27/2011 | 1/28/2011 | 1/28/2011 | A | PASS |
Tom Arcoraci
|
|
|
Blair Phone #: ###-####
|
BLD-Framing/Rough-in | 12/10/2010 | 12/10/2010 | 12/10/2010 | P | PASS |
Tom Arcoraci
|
|
|
Shear nail inspection-Blair Phone #: ###-####
|
BLD-Framing/Rough-in | 11/17/2010 | 11/18/2010 | 11/18/2010 | A | PASS |
Tom Arcoraci
|
|
|
Blair Phone #: ###-####
|
BLD-Conference | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Tom Arcoraci
|
|
|
blair Phone #: ###-#### needs letter from eng for ok of nail use on shear wall
|
BLD-Aging Inspection | 8/23/2010 | 8/23/2010 | 8/23/2010 | | PART |
Tom Arcoraci
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/30/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/30/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/18/2010 | 6/18/2010 | 6/28/2010 | | PASS |
Carl Westfall
|
|
|
6/28/2010 11:25:07 CJW - activity updated through activity BLDA022 from case BLD10-00109.
|
Routing - PLAN CHECK | 6/28/2010 | | 6/28/2010 | | DONE |
Carl Westfall
|
|
|
Routing of plans for plan modification review completed.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/28/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/28/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/28/2010 | | DONE |
|
|
|
left vm for james at###-#### - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 6/28/2010 | | DONE |
|
|
|
|
Routing - FIRE | 6/25/2010 | | 6/28/2010 | | PASS |
Scott Arellano
|
|
|
No changes to Fire Code plan review.
|
Routing PW Drainage | 6/25/2010 | | 6/25/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLANNING | 6/25/2010 | | 6/25/2010 | | PASS |
Andrea Tuning
|
|
|
Routed to Andrea.
|
Routing - PUBLIC WORKS | 6/24/2010 | | 6/25/2010 | | PASS |
Beverly Mountain
|
|
|
Changes to stormwater drainage.
|
Routing - PLAN CHECK | 6/18/2010 | | 6/24/2010 | | PASS |
Carl Westfall
|
|
|
Reviewed and approved plan modification. Routed to Planning, PW, and Fire. 2 hours spent.
|
BLD-Conference | 6/22/2010 | 6/23/2010 | 6/23/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 6/22/2010 | 6/23/2010 | 6/22/2010 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Foundation | 6/22/2010 | 6/22/2010 | 6/22/2010 | P | PASS |
Jim Storey
|
|
|
Barry ###-#### c/n made ok
|
BLD-Conference | 6/21/2010 | 6/22/2010 | 6/22/2010 | P | CANC |
Tom Arcoraci
|
|
|
cw
|
BLD-Foundation | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | FAIL |
Jim Storey
|
|
|
Barry ###-#### hoop bar inside verts/ clearance to forms to close.
|
BLD-Footing | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | PASS |
Jim Storey
|
|
|
Barry @ ###-####
|
Override - Parcel Holds | | | 6/22/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 6/21/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 6/21/2010 | | |
|
|
|
|
Override - Parcel Holds | | | 6/21/2010 | | |
|
|
|
|
Plan Modification Accepted | | | 6/18/2010 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld10-00109 (Hillcrest Shopping Center - walkway and facade) Exterior modifications include replacing three bays of glass storefront entrance system with solid infill walls where conflicts occur between the proposed storefront and the existing tenant restrooms and storage rooms. The infill wal will be constructed of stud framing with an exterior stucco finish to match the colors and finish used on the canopy structure above. Site plan modifications are a result of addressing comments from ACHD plan review concerns. The drive aisle along the new south facade of the shopping center has been modified at the western access to Phillippi Street in order to resolve conflicts with the irrigation bridge structure. Landscaping and site accessible access has been revised accordingly to address the alignment modification.; submitted on A1.2, A2.1, A4.3, L1.1, C0.0, C1.0, C2.0, C3.0, C4.0, C5.0, C5.1, C6.0, C7.0, SE.1; routed to Carl Westfall.
|
BLD-Footing | 6/16/2010 | 6/16/2010 | 6/16/2010 | P | PASS |
Tom Arcoraci
|
|
|
Roger Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/25/2010 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 4/26/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Alicia/Datum Const. need revised cert of value for build out (without demolition) before can calculate fees due.
|
CHANGE STATUS TO (PND) | | | 4/26/2010 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2010 | | DONE |
Tisha Gallop
|
|
|
called and told Alicia/Datum Const. permit is ready, fees, and need ACHD
|
Permit Ready to Issue | | | 4/26/2010 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/23/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 2/25/2010 | | 4/23/2010 | | PASS |
Carl Westfall
|
|
|
Had concerns about the structural design. Had several discussions with the project structural engineer over several weeks.
|
Plan assigned to (CJW) | 1/21/2010 | | 4/23/2010 | | PASS |
Carl Westfall
|
|
|
4/23/2010 14:38:27 CJW - activity updated through activity BLDA022 from case BLD10-00109.
|
Plan resubmittals received | | | 4/15/2010 | | DONE |
|
|
|
received 2 structural calcs and 2 copies of sheets S1.1,S2.2,S4.1 taken to Carl Westfall
|
Plan resubmittals received | | | 3/22/2010 | | DONE |
Tisha Gallop
|
|
|
received response, two copies of structural calcs and plan sheets A8.2, A10.1, S2.2; taken to Carl Westfall/
|
Plan resubmittals received | | | 3/15/2010 | | DONE |
Tisha Gallop
|
|
|
received response and two copies of structural calculations, plan sheets G0.1, G0.2, A1.2, A2.1, A8.1, ASP2, S0.1, S1.1, S2.1, S2.2, S3.2, S3.1, S4.1, S4.2; taken to Carl Westfall.
|
Routing - PUBLIC WORKS | 2/22/2010 | | 2/25/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Drainage | 2/25/2010 | | 2/25/2010 | | PASS |
Brian Murphy
|
|
|
|
Routing - PLAN CHECK | 2/18/2010 | | 2/22/2010 | | |
|
|
|
Routed back to public works
|
Route to Impact Fee Review | 2/11/2010 | 2/17/2010 | 2/18/2010 | | PASS |
Cindy M. Gould
|
|
|
New walkway and facade, no impact fees
|
Routing - FIRE | 2/12/2010 | 2/12/2010 | 2/18/2010 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
1st review completed | | | 2/18/2010 | | FAIL |
|
|
|
Failed Public Works, Plan Check
|
Routing - PLAN CHECK | 1/27/2010 | | 2/12/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on February 4, 2010 and finished on February 12, 2010. Revised drawings were required. See the plan review report.
|
Routing - Design Review | 1/27/2010 | | 1/27/2010 | | PASS |
Andrea Tuning
|
|
|
Andrea Tuning - DRH09-00257 & CZC09-00223
|
Routing - Erosion and Sediment | 1/26/2010 | | 1/27/2010 | | PASS |
Steven Webb
|
|
|
ESC10-00040 plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 1/21/2010 | | 1/26/2010 | | FAIL |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 1/25/2010 | | 1/26/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Solid Waste | 1/26/2010 | | 1/26/2010 | | PASS |
Peter J. McCullough
|
|
|
No additional trash enclosures or recepticles are noted on plans or approved.
|
Routing PW Drainage | 1/22/2010 | | 1/25/2010 | | FAIL |
Brian Murphy
|
|
|
NEEDS DRAINAGE PLAN BRIAN MURPHY ###-####
|
Routing PW Street Lights | | | 1/25/2010 | | PASS |
Hank Alarcon
|
|
|
|
Routing - Addressing | 1/21/2010 | | 1/21/2010 | | PASS |
April Wing
|
|
|
|
Pending Assignment by JCB | 1/20/2010 | | 1/21/2010 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/20/2010 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/20/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/20/2010 | | DONE |
|
|
|
|
Application received | | 1/20/2010 | | | |
|
|
|
|