Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00109
StatusFinaled
Name DATUM CONSTRUCTION MANAGEMENT INC
Site Address 5100 W OVERLAND RD
Project NameHILLCREST SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(HILLCREST SHOPPING CENTER - NEW COVERED WALKWAY AND FACADE) (6-28-10 PLAN MODIFICATION TO REPLACE PREVIOUSLY APPROVED STOREFRONT WINDOW AND DOOR SYSTEMS WITH OPAQUE WALLS AND TO REALIGN VEHICULAR ACCESS TO PHILLIPPI STREET.) This building is fully fire sprinklered for unlimited area. To construct about 3,200 square feet of covered walkway with about 240 lineal feet of new façade where a demolished portion of the building (about 102,000 square feet) formerly connected to the remainder of the building on the South side. The demolished portion was formerly occupied by "Fred Meyer" and by "Honk's 99 Cents". The demolition was done under a separate permit. Work is to include concrete footings, concrete foundations, shear walls, concrete sidewalk, concrete curb ramps, steel columns, steel beams, steel roof joists, steel roof deck, brick veneer, 3-coat exterior stucco system, storefront glazing, exterior wall, metal roofing, single ply membrane roofing, and a suspended acoustical ceiling. Curb, gutter, sidewalk, asphalt paving, and a retaining wall will be constructed along Phillippi Street in conjunction with this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/9/2015 DONE
BLD-Final6/3/20116/6/20116/3/2011APASS
DetailsTom Arcoraci
shelby Phone #: ###-####
DOC - Permit Finaled6/3/20116/3/20116/3/2011PPASS
DetailsTom Arcoraci
BLD-Final6/3/20116/3/20116/3/2011PPASS
DetailsTom Arcoraci
shelby Phone #: ###-####
PubWorks Occupancy Approval6/3/20116/3/20116/3/2011 DONE
DetailsTiffany Lowery
FIRE-Final Inspection5/20/20115/23/20115/23/2011APASS
DetailsTroy Cobbley
Life safety passed
Zoning Approval5/23/20115/23/20115/23/2011 PASS
DetailsAndrea Tuning
BLD-Conference5/19/20115/20/20115/20/2011APASS
DetailsTom Arcoraci
shelby Phone #: ###-####
Telephone call  5/19/2011 DONE
DetailsSam Zahorka
Agency Sign-offs identified as: Public Works, Planning & Zoning?, Fire Life Safety to obtain Final. Spoke with Tom Arcoraci the structural inspector. Building owner needs to complete outstanding shell permits prior to T.I. C of O.
Case Summary (BLD)  4/13/2011 DONE
DetailsSam Zahorka
BLD-Aging Inspection3/30/20113/30/20113/30/2011 PASS
DetailsTom Arcoraci
BLD-Conference1/27/20111/28/20111/28/2011APASS
DetailsTom Arcoraci
Blair Phone #: ###-####
BLD-Framing/Rough-in12/10/201012/10/201012/10/2010PPASS
DetailsTom Arcoraci
Shear nail inspection-Blair Phone #: ###-####
BLD-Framing/Rough-in11/17/201011/18/201011/18/2010APASS
DetailsTom Arcoraci
Blair Phone #: ###-####
BLD-Conference10/6/201010/6/201010/6/2010PPASS
DetailsTom Arcoraci
blair Phone #: ###-#### needs letter from eng for ok of nail use on shear wall
BLD-Aging Inspection8/23/20108/23/20108/23/2010 PART
DetailsTom Arcoraci
CHANGE STATUS TO (ISS)  6/30/2010 DONE
(F) Reprint permit  6/30/2010 DONE
Plan assigned to (CJW)6/18/20106/18/20106/28/2010 PASS
DetailsCarl Westfall
6/28/2010 11:25:07 CJW - activity updated through activity BLDA022 from case BLD10-00109.
Routing - PLAN CHECK6/28/2010 6/28/2010 DONE
DetailsCarl Westfall
Routing of plans for plan modification review completed.
PLANS/APPL TAKEN TO FRONT DESK  6/28/2010 DONE
Inspection Record Card- Bld  6/28/2010 DONE
Telephone call  6/28/2010 DONE
left vm for james at###-#### - permit (plan mod) ready and fees given
Permit Ready to Issue  6/28/2010 DONE
Details
Routing - FIRE6/25/2010 6/28/2010 PASS
DetailsScott Arellano
No changes to Fire Code plan review.
Routing PW Drainage6/25/2010 6/25/2010 PASS
DetailsBrian Murphy
Routing - PLANNING6/25/2010 6/25/2010 PASS
DetailsAndrea Tuning
Routed to Andrea.
Routing - PUBLIC WORKS6/24/2010 6/25/2010 PASS
DetailsBeverly Mountain
Changes to stormwater drainage.
Routing - PLAN CHECK6/18/2010 6/24/2010 PASS
DetailsCarl Westfall
Reviewed and approved plan modification. Routed to Planning, PW, and Fire. 2 hours spent.
BLD-Conference6/22/20106/23/20106/23/2010PPASS
DetailsTom Arcoraci
BLD-Conference6/22/20106/23/20106/22/2010ACANC
DetailsTom Arcoraci
BLD-Foundation6/22/20106/22/20106/22/2010PPASS
DetailsJim Storey
Barry ###-#### c/n made ok
BLD-Conference6/21/20106/22/20106/22/2010PCANC
DetailsTom Arcoraci
cw
BLD-Foundation6/21/20106/22/20106/22/2010AFAIL
DetailsJim Storey
Barry ###-#### hoop bar inside verts/ clearance to forms to close.
BLD-Footing6/21/20106/22/20106/22/2010APASS
DetailsJim Storey
Barry @ ###-####
Override - Parcel Holds  6/22/2010  
Override - Parcel Holds  6/21/2010  
Override - Parcel Holds  6/21/2010  
Override - Parcel Holds  6/21/2010  
Plan Modification Accepted  6/18/2010 DONE
DetailsTisha Gallop
Plan modification accepted for Bld10-00109 (Hillcrest Shopping Center - walkway and facade) Exterior modifications include replacing three bays of glass storefront entrance system with solid infill walls where conflicts occur between the proposed storefront and the existing tenant restrooms and storage rooms. The infill wal will be constructed of stud framing with an exterior stucco finish to match the colors and finish used on the canopy structure above. Site plan modifications are a result of addressing comments from ACHD plan review concerns. The drive aisle along the new south facade of the shopping center has been modified at the western access to Phillippi Street in order to resolve conflicts with the irrigation bridge structure. Landscaping and site accessible access has been revised accordingly to address the alignment modification.; submitted on A1.2, A2.1, A4.3, L1.1, C0.0, C1.0, C2.0, C3.0, C4.0, C5.0, C5.1, C6.0, C7.0, SE.1; routed to Carl Westfall.
BLD-Footing6/16/20106/16/20106/16/2010PPASS
DetailsTom Arcoraci
Roger Phone #: ###-####
Issue PAID IN FULL permit  5/25/2010 DONE
Inspection Record Card- Bld  4/26/2010 DONE
DetailsTisha Gallop
Telephone call  4/26/2010 DONE
DetailsTisha Gallop
called and left vm for Alicia/Datum Const. need revised cert of value for build out (without demolition) before can calculate fees due.
CHANGE STATUS TO (PND)  4/26/2010 DONE
Telephone call  4/26/2010 DONE
DetailsTisha Gallop
called and told Alicia/Datum Const. permit is ready, fees, and need ACHD
Permit Ready to Issue  4/26/2010 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  4/23/2010 DONE
Routing - PLAN CHECK2/25/2010 4/23/2010 PASS
DetailsCarl Westfall
Had concerns about the structural design. Had several discussions with the project structural engineer over several weeks.
Plan assigned to (CJW)1/21/2010 4/23/2010 PASS
DetailsCarl Westfall
4/23/2010 14:38:27 CJW - activity updated through activity BLDA022 from case BLD10-00109.
Plan resubmittals received  4/15/2010 DONE
received 2 structural calcs and 2 copies of sheets S1.1,S2.2,S4.1 taken to Carl Westfall
Plan resubmittals received  3/22/2010 DONE
DetailsTisha Gallop
received response, two copies of structural calcs and plan sheets A8.2, A10.1, S2.2; taken to Carl Westfall/
Plan resubmittals received  3/15/2010 DONE
DetailsTisha Gallop
received response and two copies of structural calculations, plan sheets G0.1, G0.2, A1.2, A2.1, A8.1, ASP2, S0.1, S1.1, S2.1, S2.2, S3.2, S3.1, S4.1, S4.2; taken to Carl Westfall.
Routing - PUBLIC WORKS2/22/2010 2/25/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage2/25/2010 2/25/2010 PASS
DetailsBrian Murphy
Routing - PLAN CHECK2/18/2010 2/22/2010  
Routed back to public works
Route to Impact Fee Review2/11/20102/17/20102/18/2010 PASS
DetailsCindy M. Gould
New walkway and facade, no impact fees
Routing - FIRE2/12/20102/12/20102/18/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  2/18/2010 FAIL
Failed Public Works, Plan Check
Routing - PLAN CHECK1/27/2010 2/12/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 4, 2010 and finished on February 12, 2010. Revised drawings were required. See the plan review report.
Routing - Design Review1/27/2010 1/27/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH09-00257 & CZC09-00223
Routing - Erosion and Sediment1/26/2010 1/27/2010 PASS
DetailsSteven Webb
ESC10-00040 plan approved with attached conditions.
Routing - PUBLIC WORKS1/21/2010 1/26/2010 FAIL
DetailsConnie Baumgartner
Routing PW Sewer Rating1/25/2010 1/26/2010 PASS
DetailsConnie Baumgartner
Routing PW Solid Waste1/26/2010 1/26/2010 PASS
DetailsPeter J. McCullough
No additional trash enclosures or recepticles are noted on plans or approved.
Routing PW Drainage1/22/2010 1/25/2010 FAIL
DetailsBrian Murphy
NEEDS DRAINAGE PLAN BRIAN MURPHY ###-####
Routing PW Street Lights  1/25/2010 PASS
DetailsHank Alarcon
Routing - Addressing1/21/2010 1/21/2010 PASS
DetailsApril Wing
Pending Assignment by JCB1/20/2010 1/21/2010 DONE
DetailsJason Blais
Intake Approval  1/20/2010 PASS
Plans ACCEPTED BY PLAN TECH  1/20/2010 DONE
Recd Pcfee & Taken To Pln CK  1/20/2010 DONE
Application received 1/20/2010