Permit Information
Permit NumberBLD10-00114
StatusFinaled
Name CENTER FOR SPIRITUAL LIVING
Site Address 10464 W GARVERDALE CT
Project NameCENTER FOR SPIRITUAL LIVING
Customer Number 
ePlanReviewNo
Description
(CENTER FOR SPIRITUAL LIVING) (11-18-10 PLAN MODIFICATION TO EXTEND THE ROOF AND WALL STRUCTURE AT THE MAIN ENTRANCE, PROVIDE A WHEELCHAIR LIFT IN LIEU OF A RAMP TO SERVE THE PLATFORM, INCREASE THE HEIGHT OF THE PLATFORM TO 21 INCHES, INCREASE THE SIZE OF THE PRAYER ROOM AND THE BACKSTAGE AREA, AND TO RECONFIGURE THE PLATFORM.) This building will be fully fire sprinklered for the occupant load in the fire area. To convert an existing 7,108 square foot office building (B Occupancy) to a church (A-3 Occupancy). Nonstructural work includes 2 restrooms accessible to the disabled, a wheelchair lift accessible to the disabled, interior nonbearing walls, interior doors, interior windows, exterior windows, and finishes. Structural work includes a new roof structure, bearing walls, beams, columns, headers, shear walls, joists, concrete footings, etc. The work is required to comply with the approved drawings, with the plan review report, with the structural design, and with all applicable codes and standards. The new fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. Interior nonstructural demolition was done under permit BLD10-00038. Planning approvals done under CUP09-00054, DRH09-00208, & DRH09-00281. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 8/9/20118/9/2011 DONE
Third Notice 7/2/20117/26/2011 DONE
mailed to applicant (Dan Hunt/Center For Spiritual Living). Eirannach was off the job 4/20/11 and parcel owners became GC.
Second Notice 6/24/20116/27/2011 DONE
DetailsChristina Prado
Mailed 6-28-11
First Notice 6/13/20116/14/2011 DONE
BLD-Final6/3/20116/3/20116/3/2011PPASS
DetailsJim Sly
clair Phone #: ###-####
OK for Perm Occ.
Permanent Occupancy  6/3/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  6/3/2011 DONE
Zoning Approval5/31/20115/31/20115/31/2011 PASS
DetailsAndrea Tuning
Parkign lot striping in now complete.
Zoning Approval Temp5/18/20115/18/20115/18/2011 DONE
DetailsAndrea Tuning
Applicant has not striped the parking lot to meet ADA requirements. The applicant will be striping the parking area within the next two weeks and will then call for a final inspection. All building improvements are complete and match the approved plans. 5-18-11
FIRE-Final Inspection4/29/20114/29/20114/29/2011PPASS
DetailsTroy Cobbley
life safety passed
Telephone call  4/20/2011 DONE
DetailsTisha Gallop
telephone call from Clair Bowman; Eireannach/GC no longer on the project, General contractor now goes back to parcel owner Center for Spritual Living.
BLD-Framing/Rough-in3/15/20113/16/20113/16/2011APASS
DetailsJim Sly
inspection for lift//Clair Phone #: ###-####
I had them add extra floor joists at area directly below new Wheelchair lift.......OK.
BLD-Conference3/10/20113/11/20113/11/2011ADONE
DetailsJim Sly
Clair Bowman ###-####
FIRE-Supply Line Cover1/31/20111/31/20111/31/2011PPART
DetailsForrest France
inspection of cement soffit board on new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy NOTE: Verified hardy board install by contractor- "410".
FIRE-Sprinkler Rough-in1/27/20111/27/20111/28/2011PPART
DetailsTim Frost
This inspection was called in under the wrong permit. The permit should have been FIR10-00072.

The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board.
FIRE-Conference12/30/201012/30/20101/3/2011ADONE
DetailsTroy Cobbley
Does 8.15.7.3 apply to small extension of the new front entrance as suggested by fire sprinkler subcontractor
Information was forwarded to Tim Frost who agreed this section of code could be applied but the combustible spaces would either have to have sprinkler protection or be filled with non combustible insulation.
BLD-Final12/9/201012/9/201012/10/2010PPART
DetailsJim Sly
door is being manufactured this morning due by 11 Phone #: ###-#### >> Inspection requested via web by John McCarthy
Rated door is installed and OK.....OK for Temp Occ. Reason for Temp Occ explained on previous inspection and notes. Add Mech (temp occ.) on that list.
BLD-Final12/8/201012/8/201012/8/2010PNR
DetailsJim Sly
single action levers for remaining doors requested by Fire will arrive first thing this morning will be installed for pm inspection - I will call late morning with an update Phone #: ###-#### >> Inspection requested via web by John McCarthy
Need Rated door at riser room to be tagged. Can only give Temp occ when door completed. Mech Temp....Zoning Temp......Fire life Temp (Need wheelchair lift installed and front entry canopy done) Fire sprinkler Temp (Need sprinkler head in canopy at front entry)
FIRE-Final Inspection12/8/201012/8/201012/8/2010PPART
DetailsTroy Cobbley
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
BLD-Final12/6/201012/6/201012/6/2010PCANC
DetailsJim Sly
Pending Fire and Fire Life Safety Phone #: ###-#### >> Inspection requested via web by John McCarthy
Not Ready.....
FIRE-Final Inspection12/6/201012/6/201012/6/2010PFAIL
DetailsTroy Cobbley
Remove all thumbturn locks and provide single action hardware, install all panic hardware as shown, provide signage on doors 30 aand 31, provide fire extinguishers as discussed, provide one hour rating for the fire riser room, mount the address numbers, provide and mount the occupant load signs, provide exit sign/emergency light/exit discharge lights as per plan, verfiy the change in door hardware with Carl for doors 14 and 21.
Zoning Approval Temp12/6/201012/6/201012/6/2010 DONE
DetailsAndrea Tuning
The applicant has been given a 90 temporary occupancy. The covered front entrance has been constructed in its raw form but is not fully complete with roof, brick, etc.
BLD-Final12/3/201012/3/201012/3/2010PNR
DetailsJim Sly
Sub inspections and zoning are set for this morning Phone #: ###-#### >> Inspection requested via web by John McCarthy
Need all required finals........
FIRE-Final Inspection12/3/201012/3/201012/3/2010PCANC
DetailsTroy Cobbley
The life safety inspection was unable to happen today due to the project related fire alarm and fire sprinkler permits still being unable to pass final inspection when I was at the job site at 8:30 this morning. When I arrived for a second visit at 11:15 I met building inspector Jim Sly. We met with John the architect and went over the outstanding fire alarm and fire sprinkler items and some of the obvious life safety items such as missing panic hardware, exit light at the main door and the wheelchair lift for the stage. John is going to try to have everything wrapped up for a re-inspection for monday morning.
BLD-Final12/2/201012/2/201012/2/2010PCANC
DetailsJim Sly
Sub inspections underway - electrical set for this afternoon - Due to lift a temporary is what is requested. Phone #: ###-#### >> Inspection requested via web by
John McCarthy
Cancelled by Contr..... NR
FIRE-Conference12/1/201012/1/201012/1/2010ACANC
DetailsTroy Cobbley
Don and I met over the knox box location which I deferred to the local responding station and we discussed the combustible concealed space requirements for the areas below the stage and the sound booth. Both areas need to be filled with insulation to the bottom of the floor joists.
BLD-Conference11/30/201011/30/201011/30/2010ADONE
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by John McCarthy
Talked about handrails at stage.
BLD-Conference11/22/201011/22/201011/22/2010ADONE
DetailsJim Sly
Conference for pending items for TCO Phone #: ###-#### >> Inspection requested via web by John McCarthy
CHANGE STATUS TO (ISS)  11/19/2010 DONE
(F) Reprint permit  11/19/2010 DONE
Plan assigned to (CJW)11/9/201011/9/201011/18/2010 PASS
DetailsCarl Westfall
Routing - PLAN CHECK11/12/2010 11/18/2010 PASS
DetailsCarl Westfall
Plan modification approved after review.
Meeting  11/18/2010 DONE
Met with the Pastor. Answered questions regarding the plan modification review.
PLANS/APPL TAKEN TO FRONT DESK  11/18/2010 DONE
Print Occupancy Form  11/18/2010 DONE
Telephone call  11/18/2010 DONE
DetailsTisha Gallop
called John/Eirannach LLC and left vm plan mod ready and fees due
Permit Ready to Issue  11/18/2010 DONE
DetailsTisha Gallop
BLD-Conference11/17/201011/17/201011/17/2010PCANC
DetailsJim Sly
BLD-Conference11/17/201011/17/201011/17/2010ACANC
DetailsJim Sly
Plan resubmittals received  11/17/2010  
DetailsBarbara Stitt
Received 2 copies of sheet A2.1 and taken to Carl Westfall
Override - Parcel Holds  11/17/2010  
Routing - PLAN CHECK11/9/2010 11/12/2010 FAIL
DetailsCarl Westfall
Plan modification review. Routed back to planning.
Routing - PLANNING11/12/2010 11/12/2010 PASS
DetailsAndrea Tuning
Plan Modification Accepted  11/9/2010 DONE
DetailsTisha Gallop
Plan modification accepted for Bld10-00114 (Center for Spritual Living); stage platform moved up 7" to 21" and is smaller. Moved wall behind the stage forward (South 3'). Deleted ramp - lift in leiu of ramp. prayer room enlarged. Classrooms: 4 in stead of 6. Entry got etended to face sidewalk.; Submitted on plan sheets A2.1 & A3.1; routed to Carl Westfall.
BLD-Concrete10/13/201010/14/201010/14/2010ACANC
DetailsJim Sly
BLD-Footing10/14/201010/14/201010/14/2010APASS
DetailsJim Sly
footing and stemwall inspection front entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Foundation10/13/201010/13/201010/13/2010ACANC
DetailsJim Sly
Footing and stem wall inspection for new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy Re-sched......
BLD-Conference9/29/20109/29/20109/29/2010PDONE
DetailsJim Sly
C/N Need to resubmit for plan modification because of changes to stage area. Approved plans must be on site prior to proceeding work on stage.
BLD-Conference9/29/20109/29/20109/29/2010PCANC
Details
Inspection cancelled from web by: Patricia Smith
BLD-Wall cover9/13/20109/13/20109/13/2010APART
DetailsJim Sly
inspection for shear on north and south walls of the sanctuary. Phone #: ###-#### >> Inspection requested via web by John McCarthy
(2) East/West shear walls.......OK.
BLD-Wall cover9/10/20109/10/20109/10/2010PCANC
DetailsJim Sly
Inspection for shear on north and south walls Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Wall cover9/9/20109/9/20109/9/2010APART
DetailsJim Sly
Insulation board inspection for cover on east and north sides Phone #: ###-#### >> Inspection requested via web by John McCarthy Insul for areas listed above.....OK
BLD-Wall cover9/3/20109/3/20109/3/2010PPART
DetailsJim Sly
Inspection for sheer walls in corridors in order cover corridor walls and ceilings including classroom and restroom walls and ceilings
Phone #: ###-#### >> Inspection requested via web by John McCarthy
FIRE-Supply Line Cover8/25/20108/25/20108/25/2010ACANC
DetailsTroy Cobbley
This inspection is for a sprinkler cover. No entry is being made under this building permit. The entry will be made under the correct fire sprinkler permit.
FIRE-Supply Line Cover8/24/20108/24/20108/24/2010PFAIL
DetailsTroy Cobbley
I spoke to John McCarthy about the requirement for the entire space to be filled with insulation to meet NFPA 13 requirements
BLD-Framing/Rough-in8/20/20108/20/20108/20/2010PPART
DetailsJim Sly
Inspection for clerestory trusses and upper walls in order to insulate Phone #: ###-#### >> Inspection requested via web by John McCarthy
OK to insuate truss area at uppermost roof.
BLD-Conference8/4/20108/4/20108/4/2010PCANC
DetailsJim Sly
Bill phone...
FIRE-Conference8/4/20108/4/20108/4/2010ADONE
DetailsTroy Cobbley
Talked about relocation of planned exposed fire sprinkler lines in order to have them concealed. These changes need to be submitted to tim frost for approval. Also we discussed the combustible concealed space. There are two basic options which are fill the space entirely with non-combustible insulation or provide sprinkler protection. Also the fire sprinkler riser needs to be relocated out of the access door way to the riser room.
BLD-Conference8/4/20108/5/20108/4/2010ACANC
DetailsJim Sly
Phone #: ###-#### >> Inspection requested via web by John McCarthy
BLD-Framing/Rough-in8/4/20108/4/20108/4/2010APART
DetailsJim Sly
Inspection of roof sheeting Phone #: ###-#### >> Inspection requested via web by John McCarthy
Roof sheathing nailing OK.
BLD-Footing7/12/20107/12/20107/12/2010PPASS
DetailsJim Sly
John - Inspection for two footings added to existing pony wall footings - MTI is scheduled for 10:30 for epoxy rebar Phone #: ###-#### >> Inspection requested via web by John McCarthy OK Pending MTI approval.
Issue PAID IN FULL permit  6/15/2010 DONE
DetailsTisha Gallop
Print Occupancy Form  6/14/2010 DONE
DetailsTisha Gallop
Telephone call  6/14/2010 DONE
DetailsTisha Gallop
called Dan Hunt (applicant) and told him permit is ready, fees, need GC form signed and RP.
Permit Ready to Issue  6/14/2010 DONE
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  6/11/2010 DONE
Plan assigned to (CJW)1/22/2010 6/11/2010 PASS
DetailsCarl Westfall
6/11/2010 16:30:55 CJW - activity updated through activity BLDA022 from case BLD10-00114.
Routing - PLAN CHECK5/27/2010 6/11/2010 PASS
DetailsCarl Westfall
Routing Off Site - STRUCTURAL6/2/2010 6/11/2010 PASS
DetailsCarl Westfall
Response to 4th structural review sent to the Consultant Structural Engineer. Drawings approved after 5th structural review.
Telephone call  6/9/2010 DONE
The consultant engineer called. He had spent 5 hours since May 11, 2010 on structural reviews.
Plan resubmittals received  6/2/2010 DONE
DetailsTisha Gallop
received two copies of structural response, supplemental structural calcs and three copies of plan sheet A4.1; taken to Carl Westfall.
Routing Off Site - STRUCTURAL5/20/2010 5/28/2010 FAIL
DetailsCarl Westfall
Problem with structrual design remains.
Routing - FIRE5/26/2010 5/27/2010 PASS
DetailsTim Frost
Please, see attached comments.
Routing - Design Review5/27/2010 5/27/2010 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK3/30/2010 5/26/2010 FAIL
DetailsCarl Westfall
Finished 3rd resubmittal review. Sent back to Fire.
Plan resubmittals received  5/18/2010  
received response, ES report, letter addressed to Building Official, two copies of Supplemental Structural Calcs, two copies of plan sheets A0.0, A1.0, A3.1, three copies of A2.0, A4.1, ST-1; taken to Carl Westfall
Routing Off Site - STRUCTURAL4/30/2010 5/10/2010 FAIL
DetailsCarl Westfall
3rd structural review. Several items still not resolved.
Plan Reviewer's activity  4/30/2010 DONE
At 4:00 PM, took structural response to the Permits Desk. Resubmittal ready to be sent to the Consultant Structural Engineer.
Plan resubmittals received  4/29/2010  
Received a response letter from Ward Schwider, 2 copies of Structural calcs, 3 copies of sheets A0.0, A1.0, A2.0, A2.1, A2.2, A3.1, A4.1, ST-1, GN-1, GN-2, M-1, M-2
Routing Off Site - STRUCTURAL3/31/2010 4/19/2010 FAIL
DetailsCarl Westfall
Numerous items were not adequately addressed. Revised calculations and drawings required. See the consultants 2nd structural review. Copy of 2nd review E-mailed to the Architect, etc.
Routing - PLAN CHECK2/23/2010 3/30/2010 FAIL
DetailsCarl Westfall
Completed the 1st resubmittal review. Several items not resolved.
Plan resubmittals received  3/26/2010  
DetailsCarl Westfall
rec'd response letter and three copies of sheets - A2.1; A1.0; A2.0; A2.1; A2.2; A3.1; A4.1; ST-1 - taken to Carl W
Routing Off Site - STRUCTURAL2/16/2010 3/3/2010 FAIL
DetailsCarl Westfall
Received 1st structural review from the consultant. E-mailed copy to the Architect.
Routing - FIRE2/18/20102/18/20102/23/2010 FAIL
DetailsScott Arellano
Faxed and emailed resubmittal items to owner & architect.
1st review completed  2/23/2010 FAIL
Failed Planning, Plan Check, Fire
Route to Impact Fee Review2/18/20102/23/20102/18/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK1/26/2010 2/18/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 12, 2010 and finished on February 18, 2010. Drawings were in plan review for 17 days. Revised drawings are required. See the plan review report.
Telephone call  2/12/2010 DONE
Called the Architect (Ward Schwider). Told him we needed another set of drawings and another copy of structural calculations that we can send to one of our consultant Structural Engineers. He said that he would deliver them on Tuesday. The non-structural plan review will continue.
Routing - Erosion and Sediment1/26/2010 1/26/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the attached permit conditions. ESC10-00043.
Routing - PLANNING Land Div1/26/2010 1/26/2010 PASS
DetailsDave Abo
Lot 9, Block 1 of 5 Mile Professional Park #2
Routing - PLANNING1/26/2010 1/26/2010 PASS
DetailsSusan Riggs
Susan Riggs CUP09-00054
Routing - PUBLIC WORKS1/22/2010 1/26/2010 PASS
DetailsBeverly Hall
Plan Reviewer's activity  1/25/2010 DONE
DetailsJason Blais
Sent architect Ward Schwider an e-mail stating to contact ACHD for submittal requirements because this is a change in use. They will assess if additional impact fees are required. Written verification will be required to be provided to the Permit Counter before permit issuance.
Routing - Addressing1/22/2010 1/22/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  1/22/2010 DONE
Recd Pcfee & Taken To Pln CK  1/22/2010 DONE
Pending Assignment by JCB1/22/2010 1/22/2010 DONE
DetailsJason Blais
Intake Approval  1/21/2010 PASS
Application received 1/21/2010   
Routing - Design Review    FAIL
DetailsAndrea Tuning
The applicant does not have an approved DR. Staff is waiting to obtain a site plan to complete the DR application DRH09-00281. Onec the review for the DR application is complete, the applicant will be required to meet all conditions of approval and await the 10 day appeal period. Andrea Tuning - DRH09-00281 & DRH09-00208