Third Notice | | 8/9/2011 | 8/9/2011 | | DONE |
|
|
|
|
Third Notice | | 7/2/2011 | 7/26/2011 | | DONE |
|
|
|
mailed to applicant (Dan Hunt/Center For Spiritual Living). Eirannach was off the job 4/20/11 and parcel owners became GC.
|
Second Notice | | 6/24/2011 | 6/27/2011 | | DONE |
Christina Prado
|
|
|
Mailed 6-28-11
|
First Notice | | 6/13/2011 | 6/14/2011 | | DONE |
|
|
|
|
BLD-Final | 6/3/2011 | 6/3/2011 | 6/3/2011 | P | PASS |
Jim Sly
|
|
|
clair Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 6/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Print Occupancy Form | | | 6/3/2011 | | DONE |
|
|
|
|
Zoning Approval | 5/31/2011 | 5/31/2011 | 5/31/2011 | | PASS |
Andrea Tuning
|
|
|
Parkign lot striping in now complete.
|
Zoning Approval Temp | 5/18/2011 | 5/18/2011 | 5/18/2011 | | DONE |
Andrea Tuning
|
|
|
Applicant has not striped the parking lot to meet ADA requirements. The applicant will be striping the parking area within the next two weeks and will then call for a final inspection. All building improvements are complete and match the approved plans. 5-18-11
|
FIRE-Final Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
Telephone call | | | 4/20/2011 | | DONE |
Tisha Gallop
|
|
|
telephone call from Clair Bowman; Eireannach/GC no longer on the project, General contractor now goes back to parcel owner Center for Spritual Living.
|
BLD-Framing/Rough-in | 3/15/2011 | 3/16/2011 | 3/16/2011 | A | PASS |
Jim Sly
|
|
|
inspection for lift//Clair Phone #: ###-#### I had them add extra floor joists at area directly below new Wheelchair lift.......OK.
|
BLD-Conference | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | DONE |
Jim Sly
|
|
|
Clair Bowman ###-####
|
FIRE-Supply Line Cover | 1/31/2011 | 1/31/2011 | 1/31/2011 | P | PART |
Forrest France
|
|
|
inspection of cement soffit board on new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy NOTE: Verified hardy board install by contractor- "410".
|
FIRE-Sprinkler Rough-in | 1/27/2011 | 1/27/2011 | 1/28/2011 | P | PART |
Tim Frost
|
|
|
This inspection was called in under the wrong permit. The permit should have been FIR10-00072.
The exterior canopy was inspected. The canopy is completely filled with non-combustible insulation. I gave then the ok to cover the canopy with hardy board.
|
FIRE-Conference | 12/30/2010 | 12/30/2010 | 1/3/2011 | A | DONE |
Troy Cobbley
|
|
|
Does 8.15.7.3 apply to small extension of the new front entrance as suggested by fire sprinkler subcontractor Information was forwarded to Tim Frost who agreed this section of code could be applied but the combustible spaces would either have to have sprinkler protection or be filled with non combustible insulation.
|
BLD-Final | 12/9/2010 | 12/9/2010 | 12/10/2010 | P | PART |
Jim Sly
|
|
|
door is being manufactured this morning due by 11 Phone #: ###-#### >> Inspection requested via web by John McCarthy Rated door is installed and OK.....OK for Temp Occ. Reason for Temp Occ explained on previous inspection and notes. Add Mech (temp occ.) on that list.
|
BLD-Final | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | NR |
Jim Sly
|
|
|
single action levers for remaining doors requested by Fire will arrive first thing this morning will be installed for pm inspection - I will call late morning with an update Phone #: ###-#### >> Inspection requested via web by John McCarthy Need Rated door at riser room to be tagged. Can only give Temp occ when door completed. Mech Temp....Zoning Temp......Fire life Temp (Need wheelchair lift installed and front entry canopy done) Fire sprinkler Temp (Need sprinkler head in canopy at front entry)
|
FIRE-Final Inspection | 12/8/2010 | 12/8/2010 | 12/8/2010 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given, with Scott's and Jason's permission, until the front entry canopy is complete and the additional fire sprinkler is installed and the lift at the platform is installed.
|
BLD-Final | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | CANC |
Jim Sly
|
|
|
Pending Fire and Fire Life Safety Phone #: ###-#### >> Inspection requested via web by John McCarthy Not Ready.....
|
FIRE-Final Inspection | 12/6/2010 | 12/6/2010 | 12/6/2010 | P | FAIL |
Troy Cobbley
|
|
|
Remove all thumbturn locks and provide single action hardware, install all panic hardware as shown, provide signage on doors 30 aand 31, provide fire extinguishers as discussed, provide one hour rating for the fire riser room, mount the address numbers, provide and mount the occupant load signs, provide exit sign/emergency light/exit discharge lights as per plan, verfiy the change in door hardware with Carl for doors 14 and 21.
|
Zoning Approval Temp | 12/6/2010 | 12/6/2010 | 12/6/2010 | | DONE |
Andrea Tuning
|
|
|
The applicant has been given a 90 temporary occupancy. The covered front entrance has been constructed in its raw form but is not fully complete with roof, brick, etc.
|
BLD-Final | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | NR |
Jim Sly
|
|
|
Sub inspections and zoning are set for this morning Phone #: ###-#### >> Inspection requested via web by John McCarthy Need all required finals........
|
FIRE-Final Inspection | 12/3/2010 | 12/3/2010 | 12/3/2010 | P | CANC |
Troy Cobbley
|
|
|
The life safety inspection was unable to happen today due to the project related fire alarm and fire sprinkler permits still being unable to pass final inspection when I was at the job site at 8:30 this morning. When I arrived for a second visit at 11:15 I met building inspector Jim Sly. We met with John the architect and went over the outstanding fire alarm and fire sprinkler items and some of the obvious life safety items such as missing panic hardware, exit light at the main door and the wheelchair lift for the stage. John is going to try to have everything wrapped up for a re-inspection for monday morning.
|
BLD-Final | 12/2/2010 | 12/2/2010 | 12/2/2010 | P | CANC |
Jim Sly
|
|
|
Sub inspections underway - electrical set for this afternoon - Due to lift a temporary is what is requested. Phone #: ###-#### >> Inspection requested via web by John McCarthy Cancelled by Contr..... NR
|
FIRE-Conference | 12/1/2010 | 12/1/2010 | 12/1/2010 | A | CANC |
Troy Cobbley
|
|
|
Don and I met over the knox box location which I deferred to the local responding station and we discussed the combustible concealed space requirements for the areas below the stage and the sound booth. Both areas need to be filled with insulation to the bottom of the floor joists.
|
BLD-Conference | 11/30/2010 | 11/30/2010 | 11/30/2010 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by John McCarthy Talked about handrails at stage.
|
BLD-Conference | 11/22/2010 | 11/22/2010 | 11/22/2010 | A | DONE |
Jim Sly
|
|
|
Conference for pending items for TCO Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
CHANGE STATUS TO (ISS) | | | 11/19/2010 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/19/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/9/2010 | 11/9/2010 | 11/18/2010 | | PASS |
Carl Westfall
|
|
|
|
Routing - PLAN CHECK | 11/12/2010 | | 11/18/2010 | | PASS |
Carl Westfall
|
|
|
Plan modification approved after review.
|
Meeting | | | 11/18/2010 | | DONE |
|
|
|
Met with the Pastor. Answered questions regarding the plan modification review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/18/2010 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2010 | | DONE |
Tisha Gallop
|
|
|
called John/Eirannach LLC and left vm plan mod ready and fees due
|
Permit Ready to Issue | | | 11/18/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 11/17/2010 | 11/17/2010 | 11/17/2010 | P | CANC |
Jim Sly
|
|
|
|
BLD-Conference | 11/17/2010 | 11/17/2010 | 11/17/2010 | A | CANC |
Jim Sly
|
|
|
|
Plan resubmittals received | | | 11/17/2010 | | |
Barbara Stitt
|
|
|
Received 2 copies of sheet A2.1 and taken to Carl Westfall
|
Override - Parcel Holds | | | 11/17/2010 | | |
|
|
|
|
Routing - PLAN CHECK | 11/9/2010 | | 11/12/2010 | | FAIL |
Carl Westfall
|
|
|
Plan modification review. Routed back to planning.
|
Routing - PLANNING | 11/12/2010 | | 11/12/2010 | | PASS |
Andrea Tuning
|
|
|
|
Plan Modification Accepted | | | 11/9/2010 | | DONE |
Tisha Gallop
|
|
|
Plan modification accepted for Bld10-00114 (Center for Spritual Living); stage platform moved up 7" to 21" and is smaller. Moved wall behind the stage forward (South 3'). Deleted ramp - lift in leiu of ramp. prayer room enlarged. Classrooms: 4 in stead of 6. Entry got etended to face sidewalk.; Submitted on plan sheets A2.1 & A3.1; routed to Carl Westfall.
|
BLD-Concrete | 10/13/2010 | 10/14/2010 | 10/14/2010 | A | CANC |
Jim Sly
|
|
|
|
BLD-Footing | 10/14/2010 | 10/14/2010 | 10/14/2010 | A | PASS |
Jim Sly
|
|
|
footing and stemwall inspection front entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Foundation | 10/13/2010 | 10/13/2010 | 10/13/2010 | A | CANC |
Jim Sly
|
|
|
Footing and stem wall inspection for new entrance Phone #: ###-#### >> Inspection requested via web by John McCarthy Re-sched......
|
BLD-Conference | 9/29/2010 | 9/29/2010 | 9/29/2010 | P | DONE |
Jim Sly
|
|
|
C/N Need to resubmit for plan modification because of changes to stage area. Approved plans must be on site prior to proceeding work on stage.
|
BLD-Conference | 9/29/2010 | 9/29/2010 | 9/29/2010 | P | CANC |
|
|
|
Inspection cancelled from web by: Patricia Smith
|
BLD-Wall cover | 9/13/2010 | 9/13/2010 | 9/13/2010 | A | PART |
Jim Sly
|
|
|
inspection for shear on north and south walls of the sanctuary. Phone #: ###-#### >> Inspection requested via web by John McCarthy (2) East/West shear walls.......OK.
|
BLD-Wall cover | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | CANC |
Jim Sly
|
|
|
Inspection for shear on north and south walls Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Wall cover | 9/9/2010 | 9/9/2010 | 9/9/2010 | A | PART |
Jim Sly
|
|
|
Insulation board inspection for cover on east and north sides Phone #: ###-#### >> Inspection requested via web by John McCarthy Insul for areas listed above.....OK
|
BLD-Wall cover | 9/3/2010 | 9/3/2010 | 9/3/2010 | P | PART |
Jim Sly
|
|
|
Inspection for sheer walls in corridors in order cover corridor walls and ceilings including classroom and restroom walls and ceilings Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
FIRE-Supply Line Cover | 8/25/2010 | 8/25/2010 | 8/25/2010 | A | CANC |
Troy Cobbley
|
|
|
This inspection is for a sprinkler cover. No entry is being made under this building permit. The entry will be made under the correct fire sprinkler permit.
|
FIRE-Supply Line Cover | 8/24/2010 | 8/24/2010 | 8/24/2010 | P | FAIL |
Troy Cobbley
|
|
|
I spoke to John McCarthy about the requirement for the entire space to be filled with insulation to meet NFPA 13 requirements
|
BLD-Framing/Rough-in | 8/20/2010 | 8/20/2010 | 8/20/2010 | P | PART |
Jim Sly
|
|
|
Inspection for clerestory trusses and upper walls in order to insulate Phone #: ###-#### >> Inspection requested via web by John McCarthy OK to insuate truss area at uppermost roof.
|
BLD-Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | CANC |
Jim Sly
|
|
|
Bill phone...
|
FIRE-Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 | A | DONE |
Troy Cobbley
|
|
|
Talked about relocation of planned exposed fire sprinkler lines in order to have them concealed. These changes need to be submitted to tim frost for approval. Also we discussed the combustible concealed space. There are two basic options which are fill the space entirely with non-combustible insulation or provide sprinkler protection. Also the fire sprinkler riser needs to be relocated out of the access door way to the riser room.
|
BLD-Conference | 8/4/2010 | 8/5/2010 | 8/4/2010 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by John McCarthy
|
BLD-Framing/Rough-in | 8/4/2010 | 8/4/2010 | 8/4/2010 | A | PART |
Jim Sly
|
|
|
Inspection of roof sheeting Phone #: ###-#### >> Inspection requested via web by John McCarthy Roof sheathing nailing OK.
|
BLD-Footing | 7/12/2010 | 7/12/2010 | 7/12/2010 | P | PASS |
Jim Sly
|
|
|
John - Inspection for two footings added to existing pony wall footings - MTI is scheduled for 10:30 for epoxy rebar Phone #: ###-#### >> Inspection requested via web by John McCarthy OK Pending MTI approval.
|
Issue PAID IN FULL permit | | | 6/15/2010 | | DONE |
Tisha Gallop
|
|
|
|
Print Occupancy Form | | | 6/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
Telephone call | | | 6/14/2010 | | DONE |
Tisha Gallop
|
|
|
called Dan Hunt (applicant) and told him permit is ready, fees, need GC form signed and RP.
|
Permit Ready to Issue | | | 6/14/2010 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/11/2010 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 1/22/2010 | | 6/11/2010 | | PASS |
Carl Westfall
|
|
|
6/11/2010 16:30:55 CJW - activity updated through activity BLDA022 from case BLD10-00114.
|
Routing - PLAN CHECK | 5/27/2010 | | 6/11/2010 | | PASS |
Carl Westfall
|
|
|
|
Routing Off Site - STRUCTURAL | 6/2/2010 | | 6/11/2010 | | PASS |
Carl Westfall
|
|
|
Response to 4th structural review sent to the Consultant Structural Engineer. Drawings approved after 5th structural review.
|
Telephone call | | | 6/9/2010 | | DONE |
|
|
|
The consultant engineer called. He had spent 5 hours since May 11, 2010 on structural reviews.
|
Plan resubmittals received | | | 6/2/2010 | | DONE |
Tisha Gallop
|
|
|
received two copies of structural response, supplemental structural calcs and three copies of plan sheet A4.1; taken to Carl Westfall.
|
Routing Off Site - STRUCTURAL | 5/20/2010 | | 5/28/2010 | | FAIL |
Carl Westfall
|
|
|
Problem with structrual design remains.
|
Routing - FIRE | 5/26/2010 | | 5/27/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
Routing - Design Review | 5/27/2010 | | 5/27/2010 | | PASS |
Andrea Tuning
|
|
|
|
Routing - PLAN CHECK | 3/30/2010 | | 5/26/2010 | | FAIL |
Carl Westfall
|
|
|
Finished 3rd resubmittal review. Sent back to Fire.
|
Plan resubmittals received | | | 5/18/2010 | | |
|
|
|
received response, ES report, letter addressed to Building Official, two copies of Supplemental Structural Calcs, two copies of plan sheets A0.0, A1.0, A3.1, three copies of A2.0, A4.1, ST-1; taken to Carl Westfall
|
Routing Off Site - STRUCTURAL | 4/30/2010 | | 5/10/2010 | | FAIL |
Carl Westfall
|
|
|
3rd structural review. Several items still not resolved.
|
Plan Reviewer's activity | | | 4/30/2010 | | DONE |
|
|
|
At 4:00 PM, took structural response to the Permits Desk. Resubmittal ready to be sent to the Consultant Structural Engineer.
|
Plan resubmittals received | | | 4/29/2010 | | |
|
|
|
Received a response letter from Ward Schwider, 2 copies of Structural calcs, 3 copies of sheets A0.0, A1.0, A2.0, A2.1, A2.2, A3.1, A4.1, ST-1, GN-1, GN-2, M-1, M-2
|
Routing Off Site - STRUCTURAL | 3/31/2010 | | 4/19/2010 | | FAIL |
Carl Westfall
|
|
|
Numerous items were not adequately addressed. Revised calculations and drawings required. See the consultants 2nd structural review. Copy of 2nd review E-mailed to the Architect, etc.
|
Routing - PLAN CHECK | 2/23/2010 | | 3/30/2010 | | FAIL |
Carl Westfall
|
|
|
Completed the 1st resubmittal review. Several items not resolved.
|
Plan resubmittals received | | | 3/26/2010 | | |
Carl Westfall
|
|
|
rec'd response letter and three copies of sheets - A2.1; A1.0; A2.0; A2.1; A2.2; A3.1; A4.1; ST-1 - taken to Carl W
|
Routing Off Site - STRUCTURAL | 2/16/2010 | | 3/3/2010 | | FAIL |
Carl Westfall
|
|
|
Received 1st structural review from the consultant. E-mailed copy to the Architect.
|
Routing - FIRE | 2/18/2010 | 2/18/2010 | 2/23/2010 | | FAIL |
Scott Arellano
|
|
|
Faxed and emailed resubmittal items to owner & architect.
|
1st review completed | | | 2/23/2010 | | FAIL |
|
|
|
Failed Planning, Plan Check, Fire
|
Route to Impact Fee Review | 2/18/2010 | 2/23/2010 | 2/18/2010 | | PASS |
Cindy M. Gould
|
|
|
Tenant improvement no impact fees
|
Routing - PLAN CHECK | 1/26/2010 | | 2/18/2010 | | FAIL |
Carl Westfall
|
|
|
The IBC plan review was started on February 12, 2010 and finished on February 18, 2010. Drawings were in plan review for 17 days. Revised drawings are required. See the plan review report.
|
Telephone call | | | 2/12/2010 | | DONE |
|
|
|
Called the Architect (Ward Schwider). Told him we needed another set of drawings and another copy of structural calculations that we can send to one of our consultant Structural Engineers. He said that he would deliver them on Tuesday. The non-structural plan review will continue.
|
Routing - Erosion and Sediment | 1/26/2010 | | 1/26/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the attached permit conditions. ESC10-00043.
|
Routing - PLANNING Land Div | 1/26/2010 | | 1/26/2010 | | PASS |
Dave Abo
|
|
|
Lot 9, Block 1 of 5 Mile Professional Park #2
|
Routing - PLANNING | 1/26/2010 | | 1/26/2010 | | PASS |
Susan Riggs
|
|
|
Susan Riggs CUP09-00054
|
Routing - PUBLIC WORKS | 1/22/2010 | | 1/26/2010 | | PASS |
Beverly Hall
|
|
|
|
Plan Reviewer's activity | | | 1/25/2010 | | DONE |
Jason Blais
|
|
|
Sent architect Ward Schwider an e-mail stating to contact ACHD for submittal requirements because this is a change in use. They will assess if additional impact fees are required. Written verification will be required to be provided to the Permit Counter before permit issuance.
|
Routing - Addressing | 1/22/2010 | | 1/22/2010 | | PASS |
April Wing
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/22/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/22/2010 | | DONE |
|
|
|
|
Pending Assignment by JCB | 1/22/2010 | | 1/22/2010 | | DONE |
Jason Blais
|
|
|
|
Intake Approval | | | 1/21/2010 | | PASS |
|
|
|
|
Application received | | 1/21/2010 | | | |
|
|
|
|
Routing - Design Review | | | | | FAIL |
Andrea Tuning
|
|
|
The applicant does not have an approved DR. Staff is waiting to obtain a site plan to complete the DR application DRH09-00281. Onec the review for the DR application is complete, the applicant will be required to meet all conditions of approval and await the 10 day appeal period. Andrea Tuning - DRH09-00281 & DRH09-00208
|