Second Notice | | 5/6/2010 | 5/10/2010 | | DONE |
|
|
|
|
First Notice | | 4/26/2010 | 4/26/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/16/2010 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Final | 4/9/2010 | 4/12/2010 | 4/12/2010 | A | PASS |
Jim Sly
|
|
|
Call randy prior to going out Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 3/16/2010 | 3/17/2010 | 3/17/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety is acceptable pending approved hardware is provided at two pocket doors prior to structural inspection for verification at that time, one fire extinguisher at the south side tenant posted while on site, inspection passed.
|
Print Occupancy Form | | | 2/26/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Conference | 2/10/2010 | 2/11/2010 | 2/11/2010 | A | PASS |
Tom Arcoraci
|
|
|
Randy ###-####//please call when on way
|
Plan resubmittals received | | | 2/8/2010 | | |
Tim L. Woodard
|
|
|
rec'd 2 copies of sheet P-1- taken to Tim W
|
Routing - PLUMBING | 2/8/2010 | | 2/8/2010 | | PASS |
Bill VanDegrift
|
|
|
per resubmitted plans dated 2/8/10. verift cross connection protection with field inspector.
|
Routing - PLAN CHECK | 2/8/2010 | | 2/8/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Print Occupancy Form | | | 2/8/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/8/2010 | | DONE |
|
|
|
|
Telephone call | | | 2/8/2010 | | DONE |
|
|
|
Spencer called I told him his permit would be ready when he came in this afternoon.///dld
|
Issue PAID IN FULL permit | | | 2/8/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (TLW) | 1/22/2010 | | 2/2/2010 | | PASS |
Tim L. Woodard
|
|
|
2/2/2010 16:31:33 TLW - activity updated through activity BLDA022 from case BLD10-00122.
|
Routing - PLAN CHECK | 1/27/2010 | | 2/2/2010 | | PASS |
Tim L. Woodard
|
|
|
approved as submitted. TLW
|
Routing - PLAN CHECK | 2/1/2010 | | 2/2/2010 | | PASS |
Tim L. Woodard
|
|
|
|
1st review completed | | | 2/2/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/2/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/2/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PLUMBING | 2/1/2010 | | 2/1/2010 | | FAIL |
Bill VanDegrift
|
|
|
air admittance valves are only approved for residentail use, see attached state rules. additional cross connection protection may be required, lab sinks, sterilization sink, etc.
|
Routing - PUBLIC WORKS | | | 1/27/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 1/26/2010 | | 1/26/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Addressing | 1/22/2010 | | 1/25/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 1/22/2010 | 1/22/2010 | | DONE |
Patricia Smith
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 1/22/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 1/22/2010 | | DONE |
|
|
|
|