BLD-Final | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Dave Hannah
|
|
|
call for access info//Chad Phone #: ###-####
|
DOC - Permit Finaled | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | DONE |
Terry Records
|
|
|
|
BLD-Final | 9/13/2010 | 9/14/2010 | 9/14/2010 | A | NR |
Dave Hannah
|
|
|
chad Phone #: ###-#### needs hill side signed off
|
BLD-Energy code compliance | 7/8/2010 | 7/9/2010 | 7/9/2010 | A | PASS |
Jim Sly
|
|
|
chad Phone #: ###-####
|
BLD-Framing/Rough-in | 7/7/2010 | 7/8/2010 | 7/7/2010 | A | PASS |
Dave Hannah
|
|
|
CHAD Phone #: ###-#### soon as possible Thanks ok to insulate
|
BLD-Foundation | 6/10/2010 | 6/11/2010 | 6/11/2010 | A | PASS |
Dave Hannah
|
|
|
HYRUM Phone #: ###-####
|
BLD-Footing | 6/8/2010 | 6/8/2010 | 6/8/2010 | P | PASS |
Dave Hannah
|
|
|
chad Phone #: ###-#### - 1:00 if possible
|
PubWorks Subgrade Approval | 6/7/2010 | 6/7/2010 | 6/7/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 5/14/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 1/29/2010 | 1/29/2010 | 3/24/2010 | | PASS |
Carl D Madsen
|
|
|
3/24/2010 08:34:33 CDM - activity updated through activity BLDA022 from case BLD10-00165.
|
Routing - PLAN CHECK | 3/24/2010 | | 3/24/2010 | | PASS |
Carl D Madsen
|
|
|
Calc sheet for floor joists received 3-24-10 CDM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/24/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2010 | | DONE |
|
|
|
t/c w chad at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/24/2010 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/23/2010 | | |
Tisha Gallop
|
|
|
received two copies of plan sheet 2 (foundation plan), taken to Carl Madsen.
|
Routing - PLAN CHECK | 3/23/2010 | | 3/23/2010 | | FAIL |
Carl D Madsen
|
|
|
The specified floor joists are not sufficient for the span at the spacing indicated on the plans. Called Chad and requested calculations for the floor joists. 3-23-10 CDM
|
Plan resubmittals received | | | 3/9/2010 | | DONE |
|
|
|
Received truss engineering
|
Routing - PLAN CHECK | 3/9/2010 | | 3/9/2010 | | FAIL |
Carl D Madsen
|
|
|
Still have not received the appropriate floor joist size for the span and spacing indicated on the plans. 3-8-10 CDM
|
Plan resubmittals received | | | 2/25/2010 | | DONE |
|
|
|
received 2 copies of sheet 1 & 2 taken to Carl M.
|
Routing - PLAN CHECK | 2/25/2010 | | 2/25/2010 | | FAIL |
Carl D Madsen
|
|
|
Require truss engineering that matches the submitted plans and have not received all of the requested information. 2-25-10 CDM
|
Route to Impact Fee Review | 1/29/2010 | 2/3/2010 | 2/18/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 2/18/2010 | | 2/18/2010 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 2/18/2010 | | FAIL |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/18/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - FIRE | 2/4/2010 | | 2/8/2010 | | PASS |
Scott Arellano
|
|
|
No Sprinklers Required.
|
Routing - Erosion and Sediment | 2/3/2010 | | 2/4/2010 | | PASS |
Steven Webb
|
|
|
ESC plan approved along with the attached conditions. ESC10-00063
|
Routing - PUBLIC WORKS | | | 2/3/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 2/3/2010 | | 2/3/2010 | | PASS |
Cody Riddle
|
|
|
|
Routing PW Grading-Hillside | 2/1/2010 | | 2/2/2010 | | PASS |
Terry Records
|
|
|
Approved as Category 1
|
Routing - Addressing | 1/29/2010 | | 2/1/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 1/29/2010 | 1/29/2010 | | DONE |
Tisha Gallop
|
|
|
|