Permit Information
Permit NumberBLD10-00171
StatusFinaled
Name EXCELSIOR CONSTRUCTION CO
Site Address 3201 W AIRPORT WAY
Project NameBOISE AIR TERMINAL
Customer Number 
ePlanReviewNo
Description
(ALAMO RENTAL CAR - Boise Air Terminal - Main Floor) Permit is to build out an existing office shell. Work to include: [construction of interior non-bearing walls to create a conference room less than 400 Square feet, a break room less than 400 Square feet, data/storage room, and open office area], installation of new kitchenette sink, installation of new doors and hardware, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 7/25/20108/2/2010 DONE
First Notice 6/19/20107/15/2010 DONE
Print Occupancy Form  6/9/2010 DONE
Permanent Occupancy  6/9/2010 DONE
DetailsTisha Gallop
BLD-Aging Inspection5/10/20105/10/20105/10/2010 DONE
DetailsJim Storey
FIRE-Final Inspection3/5/20103/8/20103/9/2010APASS
DetailsForrest France
Fire life safety completed acceptable, inspection passed.
BLD-Final3/5/20103/8/20103/8/2010APASS
DetailsJim Storey
Chris Phone #: ###-#### final ok
FIRE-Final Inspection3/5/20103/5/20103/5/2010PCANC
DetailsForrest France
late pm please//Chris Phone #: ###-#### Inspection cancelled from web by: Rita DeYoung
FIRE-Conference2/18/20102/19/20102/19/2010ADONE
DetailsForrest France
Regarding project related fire alarm modifications.
Issue PAID IN FULL permit  2/9/2010 DONE
Details
Permit Ready to Issue  2/8/2010 DONE
Telephone call  2/8/2010 DONE
DetailsBarbara Stitt
Called Excelsior Construction and spoke with Chris Waldrum, told him that permit is ready & fees due @ 11:05am on 2-8-10///BAS
Routing - FIRE  2/5/2010 PASS
DetailsTim L. Woodard
Field Verify
1st review completed  2/5/2010 PASS
DetailsTim L. Woodard
PLANS/APPL TAKEN TO FRONT DESK  2/5/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  2/5/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  2/5/2010 DONE
Plan assigned to (TLW)2/1/2010 2/5/2010 PASS
DetailsTim L. Woodard
2/5/2010 09:52:35 TLW - activity updated through activity BLDA022 from case BLD10-00171.
Routing - PLAN CHECK2/3/2010 2/5/2010 PASS
DetailsTim L. Woodard
approved with redlines. TLW
Routing - PUBLIC WORKS  2/3/2010 PASS
Routing PW Sewer Rating2/2/2010 2/2/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing2/1/2010 2/1/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  2/1/2010 DONE
Recd Pcfee & Taken To Pln CK  2/1/2010 DONE
Application received 2/1/2010