BLD-Final | 5/4/2010 | 5/5/2010 | 5/5/2010 | A | PASS |
Tony Young
|
|
|
Please call 30 minutes prior so I can meet there. Inspection requested from web by: Drew Thueson Phone #: ###-####
|
DOC - Permit Finaled | 5/5/2010 | 5/5/2010 | 5/5/2010 | P | PASS |
Tony Young
|
|
|
c of c issued
|
BLD-Energy code compliance | 3/12/2010 | 3/12/2010 | 3/12/2010 | P | PASS |
Tony Young
|
|
|
Inspection requested from web by: Drew Thueson Phone #: ###-####
|
BLD-Wall cover | 3/11/2010 | 3/12/2010 | 3/12/2010 | A | PASS |
Tony Young
|
|
|
Inspection requested from web by: Drew Thueson Phone #: ###-####
|
BLD-Framing/Rough-in | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Tom Arcoraci
|
|
|
Drew Phone #: ###-####
|
BLD-Conference | 3/2/2010 | 3/2/2010 | 3/2/2010 | P | PART |
Tony Young
|
|
|
drew - please call 1/2 hr prior so he can meet you there Phone #: ###-#### exterior shear ok,,
|
BLD-Foundation | 2/11/2010 | 2/12/2010 | 2/12/2010 | A | PART |
Tony Young
|
|
|
Drew Phone #: ###-#### will need to get engineer fix on change to sunroom area
|
BLD-Footing | 2/10/2010 | 2/11/2010 | 2/11/2010 | A | PASS |
Tony Young
|
|
|
Drew Phone #: ###-#### garage tfgs ok
|
PubWorks Subgrade Approval | 2/11/2010 | 2/11/2010 | 2/11/2010 | | DONE |
Terry Records
|
|
|
Footing subgrade at front of garage approved by geotechnical engineer
|
BLD-Footing | 2/9/2010 | 2/10/2010 | 2/10/2010 | A | PART |
Tony Young
|
|
|
Drew Phone #: ###-#### post goles per plan, soil and engineering ok
|
PubWorks Subgrade Approval | 2/10/2010 | 2/10/2010 | 2/10/2010 | | PART |
Terry Records
|
|
|
Strata has observed the 6 drilled shaft foundation excavations along the North blg line for the proposed shop building at 1621 Promontory point on Tues Feb 9th. The shaft foundations have been excavated into competent bearing soil that meets the structural engineer’s requirements. Strata approved the drilled shaft foundation subgrade provided that loose soil greater than 1 inch in depth at the bottom of the shafts be removed prior to placing concrete. Since the 7 ft deep shafts are uncased, Strata also recommends the concrete be placed in the center of the shaft (via a backchute or a pump hose) to avoid sidewall soil sloughing during concrete placement.
|
Routing Walk-In (PW Hillside) | 2/3/2010 | 2/3/2010 | 2/3/2010 | A | DONE |
Terry Records
|
|
|
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling a footing inspection.
2/3/2010 09:46:27 TR - activity updated through activity BLDI260 from case BLD10-00200.
|
Routing Walk-In (Zoning) | 2/3/2010 | 2/3/2010 | 2/3/2010 | A | PASS |
David Moser
|
|
|
2/3/2010 10:13:04 DEM - activity updated through activity BLDI252 from case BLD10-00200. 15 ' setback from R/W line as per plat note
|
Routing Walk-In (BLD) | 2/3/2010 | 2/3/2010 | 2/3/2010 | A | DONE |
Perry Paine
|
|
|
2/3/2010 12:04:49 PEP - activity updated through activity BLDA022 from case BLD10-00200.
|
Plan assigned to (PEP) | 2/3/2010 | 2/3/2010 | 2/3/2010 | | PASS |
Perry Paine
|
|
|
2/3/2010 12:04:48 PEP - activity updated through activity BLDA022 from case BLD10-00200.
|
1st review completed | | | 2/3/2010 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2010 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/3/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/3/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/3/2010 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | 2/3/2010 | | | |
|
|
|
|