Permit Information
Permit NumberBLD10-00201
StatusFinaled
Name PRESTIGE HOMES INC
Site Address 2690 S GATEWOOD LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(reference expired permit Bld06-00799) Permit to complete the construction of an existing 1,292 sq. ft. townhouse with work to include the addition of 40 sq.ft., reconfiguration of the master bathroom, completion of mechanical, plumbing and electrical systems and the installation of all related interior and exterior finishes. All work to be done per the approved plans, plan review report, any notations and the attached engineers evaluation report. This structure was originally approved for construction under the 2003 IRC. R-1A zoning, CUP09-00104 and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/9/20112/10/20112/10/2011PPASS
DetailsMike Jordan
Please contact Scott for onsite access. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
DOC - Permit Finaled2/10/20112/10/20112/10/2011PPASS
DetailsMike Jordan
Residential certificate of occupancy was issued.
BLD-Final2/9/20112/10/20112/9/2011ACANC
DetailsMike Jordan
Please contact Scott for onsite access. Thanks! Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
BLD-Aging Inspection1/24/20111/24/20111/28/2011 PASS
DetailsMike Jordan
Work is in progress.
BLD-Wall cover11/22/201011/22/201011/22/2010PPASS
DetailsMike Jordan
Contractor jumped the gun and started to mud before inspection. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
BLD-Energy code compliance11/22/201011/22/201011/22/2010PPASS
DetailsMike Jordan
Contractor jumped the gun and started to mud before inspection. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
BLD-Framing/Rough-in10/21/201010/21/201010/21/2010APASS
DetailsMike Jordan
Please call for onsite visit. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
BLD-Aging Inspection10/5/201010/5/201010/5/2010 PASS
DetailsMike Jordan
work is in progress.
BLD-Aging Inspection8/5/20108/5/20108/5/2010 PASS
DetailsMike Jordan
Work in progress.
BLD-Framing/Rough-in5/18/20105/18/20105/18/2010APART
DetailsMike Jordan
Provided preliminary framing inspection so that contractor could start repairing any outstanding issues prior to doing any rough ins. Contractor will make any repairs discussed and recall for formal framing inspection once all rough ins are completed and inspected.
BLD-Aging Inspection5/12/20105/12/20105/12/2010 PASS
DetailsMike Jordan
Work in progress.
BLD-Footing3/10/20103/11/20103/11/2010APASS
DetailsMike Jordan
bill Phone #: ###-####
BLD-Wall cover3/3/20103/4/20103/4/2010APART
DetailsMike Jordan
Inspection of OSB replacement and Fire Wall Sheetrock replacement. Please call Scott for site visit. Thanks! Inspection requested from web by: Scott Zierler Phone#: ###-####. Met with contractor and went over engineering, approved plans, as well as property line walls that still need to be rated.
BLD-Wall cover3/3/20103/4/20103/3/2010PCANC
DetailsMike Jordan
Inspection of OSB replacement and Fire Wall Sheetrock replacement. Please call Scott for site visit. Thanks! Inspection requested from web by: Scott Zierler Phone #: ###-#### Inspection cancelled from web by: Scott Zierler
Issue PAID IN FULL permit  2/25/2010 DONE
DetailsTisha Gallop
OVERRIDE  2/22/2010  
Inspection Record Card- Bld  2/22/2010 DONE
DetailsTisha Gallop
Telephone call  2/22/2010 DONE
DetailsTisha Gallop
called and left vm for Pat McMonigle permit is ready
Permit Ready to Issue  2/22/2010 DONE
DetailsTisha Gallop
Plan assigned to (CDM)2/3/20102/3/20102/19/2010 PASS
DetailsCarl D Madsen
2/19/2010 15:57:16 CDM - activity updated through activity BLDA022 from case BLD10-00201.
Routing - PLAN CHECK2/8/2010 2/19/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  2/19/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/19/2010  
Route to Impact Fee Review2/3/20102/8/20102/9/2010 PASS
DetailsCindy M. Gould
Impact fees paid when shell was built
Routing - PUBLIC WORKS  2/8/2010 PASS
DetailsConnie Baumgartner
Routing - PLANNING2/4/2010 2/5/2010 PASS
DetailsColleen T Carroll
Routing - Addressing2/3/2010 2/4/2010 PASS
DetailsApril Wing
Application received 2/3/20102/3/2010 DONE
DetailsTisha Gallop