Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00206
StatusFinaled
Name JORDAN-WILCOMB CONSTRUCTION
Site Address 600 N ROBBINS RD
Project NameIDAHO ELKS REHAB HOSPITAL
Customer Number 
ePlanReviewNo
Description
(IDAHO ELKS REHABILITATION HOSPITAL - VESTIBULE INSTALLATION) Work includes construction of an 8'-3" noncombustible framed wall, 5/8" type 'X' sheetrock & finish, with a 4'-0" x 7'-0" door with a sidelight to create a vestibule within an existing 2-hour rated exit passageway. Wall & door will be approximately 20 feet into the passageway from the existing exterior door. A wireless actuator will be installed to assisted door opening. A new exit sign will be installed on the west side of the new door. The integrity of the existing 2-hour exit passageway will be maintained by appropriate repair of any modified or damaged areas with new construction tight against the existing interior side of rated walls and tunnel deck above. This building is fully sprinklered. Any modifications to the existing fire sprinkler or alarm systems will require separate application, plans and permits from the fire department before such work can begin. A Certificate of Compliance is required as evidence of final inspection and approval by Boise City PDS Building Division. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/11/2014 DONE
First Notice9/14/20109/14/20109/24/2010 DONE
DetailsDave Hannah
Telephone call  9/20/2010 DONE
DetailsTisha Gallop
per phone call with Dave Hannah no electrical work on this project.
Letter of compliance/Occupancy  9/20/2010 DONE
DetailsTisha Gallop
BLD-Final9/14/20109/14/20109/14/2010PPASS
DetailsDave Hannah
kevin Phone #: ###-####
DOC - Permit Finaled9/14/20109/14/20109/14/2010PPASS
DetailsDave Hannah
FIRE-Final Inspection9/13/20109/14/20109/14/2010APASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed.
BLD-Framing/Rough-in9/13/20109/13/20109/13/2010PPASS
DetailsDave Hannah
###-#### Kevin
BLD-Aging Inspection7/13/20107/13/20107/13/2010 PASS
DetailsDave Hannah
exps on 09/28/10
Issue PAID IN FULL permit  4/2/2010 DONE
Plan assigned to (DRS)2/3/20102/3/20102/4/2010 PASS
DetailsDan Stuart
2/4/2010 07:13:48 DRS - activity updated through activity BLDA022 from case BLD10-00206.
Routing - PLAN CHECK2/3/2010 2/4/2010 PASS
DetailsDan Stuart
TO PERMIT DESK TO ISSUE.
PLANS/APPL TAKEN TO FRONT DESK  2/4/2010 PASS
Inspection Record Card- Bld  2/4/2010 DONE
Permit Ready to Issue  2/4/2010 DONE
Telephone call  2/4/2010 DONE
called Bryan permit ready and fee given 2-4-10 dld
1st review completed  2/4/2010 PASS
DetailsDan Stuart
Plans ACCEPTED BY PLAN TECH  2/3/2010 DONE
Recd Pcfee & Taken To Pln CK  2/3/2010 DONE
Application received 2/3/2010