Letter of compliance/Occupancy | | | 8/17/2010 | | DONE |
|
|
|
beck with armada homes called and asked that we fax her a letter of compliance - ###-####
|
BLD-Final | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Jim Storey
|
|
|
Inspection requested from web by: Kelly Stover Phone #: ###-####
|
DOC - Permit Finaled | 5/21/2010 | 5/21/2010 | 5/21/2010 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 5/19/2010 | 5/20/2010 | 5/20/2010 | A | NR |
Dave Hannah
|
|
|
Inspection requested from web by: Kelly Stover Phone #: ###-#### needs plumbing final first
|
BLD-Energy code compliance | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PASS |
Jim Storey
|
|
|
Inspection requested from web by: Kelly Stover Phone #: ###-####
|
BLD-Framing/Rough-in | 3/31/2010 | 3/31/2010 | 3/31/2010 | P | PASS |
Jim Storey
|
|
|
Inspection requested from web by: Kelly Stover Phone #: ###-####
|
BLD-Foundation | 3/4/2010 | 3/5/2010 | 3/5/2010 | A | PASS |
Jim Storey
|
|
|
adam Phone #: ###-####
|
BLD-Footing | 3/4/2010 | 3/4/2010 | 3/4/2010 | P | PASS |
Jim Storey
|
|
|
adam Phone #: ###-####
|
OVERRIDE | | | 3/3/2010 | | |
|
|
|
|
Route to Impact Fee Review | 2/4/2010 | 2/9/2010 | 3/3/2010 | | PASS |
Cindy M. Gould
|
|
|
|
Telephone call | | | 3/3/2010 | | DONE |
Barbara Stitt
|
|
|
Called and left voice message for Becky that permit is ready and fees due @ 10:50am on 3-3-10 BAS
|
Issue PAID IN FULL permit | | | 3/3/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/3/2010 | | |
Barbara Stitt
|
|
|
|
Inspection Record Card- Bld | | | 3/2/2010 | | DONE |
Barbara Stitt
|
|
|
|
Case Summary (BLD) | | | 3/1/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/1/2010 | | 3/1/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2010 | | |
|
|
|
|
Plan resubmittals received | | | 2/26/2010 | | DONE |
|
|
|
Received truss engineering. Truss plan does not match the floor plan.
|
Routing - PLAN CHECK | 2/26/2010 | | 2/26/2010 | | FAIL |
Carl D Madsen
|
|
|
Truss engineering does not match the floor plan
|
Telephone call | | | 2/26/2010 | | DONE |
|
|
|
Called and talked to Kelly Stover about the truss engineering not matching the floor plan and that I need the correct truss engineering or floor plan with the required support. 2-26-10 CDM
|
Plan assigned to (CDM) | 2/4/2010 | 2/4/2010 | 2/25/2010 | | FAIL |
Carl D Madsen
|
|
|
Truss engineering required. Called and talked to Kelly Stover at Armada homes and requested the additional information. I also sent a E-Mail to Kelly. 2-25-10 CDM
|
Routing - PUBLIC WORKS | 2/10/2010 | | 2/10/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 2/10/2010 | | 2/10/2010 | | PASS |
David Moser
|
|
|
New site plans and drawings. As per HS; West property line is the front property line
|
Routing - PLANNING | 2/4/2010 | | 2/5/2010 | | FAIL |
Colleen T Carroll
|
|
|
Will resubmit new site plan: as per HS the west property line is front yard.
|
Application received | | 2/4/2010 | 2/4/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Addressing | 2/4/2010 | | 2/4/2010 | | PASS |
April Wing
|
|
|
|
Routing - PLAN CHECK | 2/10/2010 | | | | FAIL |
Carl D Madsen
|
|
|
|