Permit Information
Permit NumberBLD10-00211
StatusFinaled
Name JONES & JONES DESIGN STUDIO
Site Address 235 E BRAEMERE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
This extensive remodel project is to include interior partition work in the main level and the basement area including new egress wells for bedroom of an existing 4038s.f.single family dwelling. The project will also include the addition of 547s.f. to the existing 515s.f. attached garage converting from front to side loading. R-1B ok per Colleen Carroll. Separate electrical, plumbing, and mechanical and ESC permits are required. All window change outs must meet the .35 U-Value requirements. All per the approved plans as marked beam calculations and the plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/29/201010/4/201010/4/2010APASS
DetailsTony Young
nate Phone #: ###-####,,, gave paperwork
DOC - Permit Finaled10/4/201010/4/201010/4/2010PPASS
DetailsTony Young
BLD-Final9/8/20109/9/20109/9/2010APART
DetailsTony Young
Nate Phone #: ###-####,, walk through,, inside ok,, hillside ok per T. R.
BLD-Energy code compliance5/4/20105/5/20105/7/2010APART
DetailsTony Young
see other notes
BLD-Energy code compliance5/3/20105/4/20105/5/2010APART
DetailsTony Young
Nate Phone #: ###-####,, insulation mostly ok,, will do knee walls after sheetrock is up,, need fire blocking around fire place
BLD-Framing/Rough-in4/23/20104/23/20104/23/2010PPART
DetailsTony Young
nate Phone #: ###-####,, ok to insulate,, will fireblock with insulation,, need gas pressure pass prior to cover
BLD-Foundation2/23/20102/23/20102/23/2010PPASS
DetailsTony Young
mana Phone #: ###-####
wip
BLD-Footing2/19/20102/19/20102/19/2010APASS
DetailsTony Young
###-#### Mana PLease call with inspection results
PubWorks Subgrade Approval2/17/20102/17/20102/17/2010 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
Routing Walk-In (PW Hillside)2/4/20102/4/20102/4/2010APASS
DetailsTerry Records
Footing subgrade must be approved by the applicants geotechnical engineer prior to scheduling footing inspection.
Routing Walk-In (Zoning)2/4/20102/4/20102/4/2010APASS
DetailsColleen T Carroll
Routing Walk-In (BLD)2/4/20102/4/20102/4/2010ADONE
DetailsPerry Paine
2/4/2010 10:27:25 PEP - activity updated through activity BLDA022 from case BLD10-00211.
Plan assigned to (PEP)2/4/20102/4/20102/4/2010 PASS
DetailsPerry Paine
2/4/2010 10:27:24 PEP - activity updated through activity BLDA022 from case BLD10-00211.
Case Summary (BLD)  2/4/2010  
Inspection Record Card- Bld  2/4/2010  
1st review completed  2/4/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/4/2010 DONE
Issue PAID IN FULL permit  2/4/2010 DONE
DetailsTisha Gallop
Application received 2/4/2010