BLD-Final | 12/22/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Mike Jordan
|
|
|
Please call Scott for access. Thanks Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
DOC - Permit Finaled | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Mike Jordan
|
|
|
CERTIFICATE OF OCCUPANCY WAS ISUED.
|
BLD-Aging Inspection | 12/15/2010 | 12/15/2010 | 12/16/2010 | | PASS |
Mike Jordan
|
|
|
Work in progress.
|
BLD-Wall cover | 10/14/2010 | 10/15/2010 | 10/15/2010 | A | PASS |
Mike Jordan
|
|
|
Thanks Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Verified firewalls were continous behind furouts, scrrew pattern completed.
|
BLD-Wall cover | 10/11/2010 | 10/13/2010 | 10/13/2010 | A | FAIL |
Jim Storey
|
|
|
Drywall party wall fastener inspection. Thanks Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierlerfire wall must be continous behind fur outs/ missing screws.
|
BLD-Wall cover | 10/6/2010 | 10/12/2010 | 10/11/2010 | P | CANC |
Mike Jordan
|
|
|
Inspection for fastener pattern on party walls.
Thanks
Scott Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Framing/Rough-in | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Mike Jordan
|
|
|
Reinspection Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 9/30/2010 | 10/4/2010 | 10/4/2010 | P | PEND |
Mike Jordan
|
|
|
Reinspection for items at initial framing inspection. Please call for on-site visit. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Energy code compliance | 10/4/2010 | 10/4/2010 | 10/4/2010 | P | PASS |
Mike Jordan
|
|
|
Reinspection for items at initial framing inspection. Please call for on-site visit. Thanks. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Framing/Rough-in | 9/28/2010 | 9/29/2010 | 9/29/2010 | A | FAIL |
Mike Jordan
|
|
|
Please call for onsite visit. Thx Phone #: ###-#### >> Inspection requested via web by Scott Zierler. Complete fireblocking, nail off remaining simpson hangars, Justify cut lvl at bearing locATION and cut top chords. Provide bering block on girder as noted on truss enginering. ok to insulate.
|
BLD-Energy code compliance | 9/27/2010 | 9/29/2010 | 9/28/2010 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Scott Zierler Inspection cancelled from web by: Scott Zierler
|
BLD-Other | 9/16/2010 | 9/17/2010 | 9/17/2010 | A | DONE |
Mike Jordan
|
|
|
Onsite visit to discuss fire party wall and penetrations. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
|
BLD-Aging Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 | | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/18/2010 | 5/18/2010 | 5/18/2010 | A | PART |
Mike Jordan
|
|
|
Provided preliminary framing inspection so that contractor could start repairing any outstanding issues prior to doing any rough ins. Contractor will make any repairs discussed and recall for formal framing inspection once all rough ins are completed and inspected.
|
BLD-Foundation | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | CANC |
Mike Jordan
|
|
|
wesley Phone #: ###-####
|
BLD-Conference | 3/22/2010 | 3/23/2010 | 3/23/2010 | A | PASS |
Mike Jordan
|
|
|
Soffit Sheetrock Inspection Inspection requested from web by: Scott Zierler Phone #: ###-####. Inspected installation of the two layers of 5/8type x rock at required soffit locations. No vents.
|
BLD-Wall cover | 3/18/2010 | 3/19/2010 | 3/19/2010 | P | PASS |
Mike Jordan
|
|
|
Inspection for additional layers of 5/8" needed in a few property line locations front and back. Inspection requested from web by: Scott Zierler Phone #: ###-####Damaged 5/8 type x rock removed and replaced as required per enginner report as well as osb. ok to cover.
|
BLD-Wall cover | 3/3/2010 | 3/4/2010 | 3/4/2010 | A | PART |
Mike Jordan
|
|
|
Inspection of OSB replacement and Fire Wall Sheetrock replacement. Please call Scott for site visit. Thanks! Inspection requested from web by: Scott Zierler Phone #: ###-####. Met with contractor on site and went over enginnering, aproved plans as well as property line walls that still need to be rated.
|
Issue PAID IN FULL permit | | | 2/25/2010 | | DONE |
Tisha Gallop
|
|
|
|
OVERRIDE | | | 2/22/2010 | | |
|
|
|
|
Telephone call | | | 2/22/2010 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Pat McMonigle permit is ready
|
Permit Ready to Issue | | | 2/22/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (CDM) | 2/3/2010 | 2/3/2010 | 2/19/2010 | | DONE |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 2/8/2010 | | 2/19/2010 | | PASS |
Carl D Madsen
|
|
|
|
Case Summary (BLD) | | | 2/19/2010 | | DONE |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2010 | | |
|
|
|
|
Inspection Record Card- Bld | | | 2/19/2010 | | DONE |
Tisha Gallop
|
|
|
|
Route to Impact Fee Review | 2/4/2010 | 2/9/2010 | 2/9/2010 | | PASS |
Cindy M. Gould
|
|
|
Impact fees paid when shell was constructed.
|
Routing - PUBLIC WORKS | | | 2/8/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLANNING | 2/4/2010 | | 2/5/2010 | | PASS |
Colleen T Carroll
|
|
|
|
Routing - Addressing | 2/4/2010 | | 2/4/2010 | | PASS |
April Wing
|
|
|
|
Application received | | 2/3/2010 | 2/3/2010 | | DONE |
Tisha Gallop
|
|
|
|