Second Notice | | 5/20/2010 | 5/11/2010 | | DONE |
|
|
|
|
First Notice | | 5/6/2010 | 5/10/2010 | | DONE |
|
|
|
|
BLD-Final | 4/26/2010 | 4/26/2010 | 4/26/2010 | P | PASS |
Tom Arcoraci
|
|
|
ken Phone #: ###-####
|
Permanent Occupancy UNPAID FEE | | | 4/26/2010 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Final | 4/15/2010 | 4/15/2010 | 4/15/2010 | P | PASS |
Tom Arcoraci
|
|
|
Kenny Phone #: ###-####
|
Zoning Approval | 4/15/2010 | 4/15/2010 | 4/15/2010 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 4/13/2010 | 4/13/2010 | 4/13/2010 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. I found a storage shed attached to the main building that had no fire sprinkler protection. I notified Scott and he is sending Jerry McAdams an email for enforcement to follow up on. Per the owner Commercial Fire has already been contacted to provide fire protection.
|
FIRE-Conference | 4/5/2010 | 4/6/2010 | 4/7/2010 | A | DONE |
Troy Cobbley
|
|
|
The builder was questioning door hardware on the southwest exit door. Single action is required and the thumbturn dead bolt needs to be removed.
|
FIRE-Conference | 4/2/2010 | 4/2/2010 | 4/2/2010 | P | PASS |
Troy Cobbley
|
|
|
I spoke to the owner/builder and clarified the requirements for the fire extinguisher located at the paint hood.
|
Plan Reviewer's activity | | | 3/11/2010 | | DONE |
Jason Blais
|
|
|
Elimination of the drinking fountain approved per alternate request and explanation of the business. Approval and letters attached to the case.
|
BLD-Framing/Rough-in | 3/9/2010 | 3/10/2010 | 3/10/2010 | A | PASS |
Tom Arcoraci
|
|
|
scott - please call 1/2 hr prior Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/4/2010 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 2/5/2010 | | 3/3/2010 | | PASS |
Sam Zahorka
|
|
|
3/3/2010 15:53:38 SRZ - activity updated through activity BLDA022 from case BLD10-00228.
|
Routing - PLAN CHECK | 3/1/2010 | | 3/3/2010 | | PASS |
Sam Zahorka
|
|
|
|
Plan resubmittals received | | | 3/3/2010 | | DONE |
|
|
|
received 1 plan check correction & 2 copies of sheet A1 sent to Sam Z.
|
Case Summary (BLD) | | | 3/3/2010 | | DONE |
Sam Zahorka
|
|
|
|
Telephone call | | | 3/3/2010 | | DONE |
Sam Zahorka
|
|
|
Telephoned the architect Martin Santoyo and talked about the drinking fountain(s) location in the circulation path. If the leading edge of the drinking fountain exceeds 27" above the floor a barrier or wing wall shall be required. I red-lined the plans and added the code language in the plan review report attached to the plans. SRZ
|
Routing - PUBLIC WORKS | 3/3/2010 | | 3/3/2010 | | PASS |
Connie Baumgartner
|
|
|
new drinking fountain.
|
Routing PW Sewer Rating | 3/3/2010 | | 3/3/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - PLAN CHECK | 3/3/2010 | | 3/3/2010 | | PASS |
Sam Zahorka
|
|
|
|
Print Occupancy Form | | | 3/3/2010 | | DONE |
Barbara Stitt
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2010 | | DONE |
Sam Zahorka
|
|
|
|
Permit Ready to Issue | | | 3/3/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/3/2010 | | DONE |
Barbara Stitt
|
|
|
Called and left a message for Martin Santoyo that permit is ready, fees due, need GC info, and to verify RP info @ 4:15 on 3-3-10///BAS
|
Routing - FIRE | 2/24/2010 | | 3/1/2010 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 3/1/2010 | | FAIL |
Tim Frost
|
|
|
Failed Plan Check
|
Routing - PLAN CHECK | 2/11/2010 | | 2/24/2010 | | FAIL |
Sam Zahorka
|
|
|
Emailed plan review corrections to the Architect. Also left a telephone message.
|
Routing - PLANNING | 2/10/2010 | | 2/11/2010 | | PASS |
Josh Wilson
|
|
|
Josh W.
|
Routing - Design Review | 2/10/2010 | | 2/11/2010 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - CZC10-00001
|
Routing - PUBLIC WORKS | 2/5/2010 | | 2/10/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing - Erosion and Sediment | 2/10/2010 | | 2/10/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver approved according to the ESC permit conditions. ESC10-00095
|
Routing - Addressing | 2/9/2010 | | 2/9/2010 | | PASS |
April Wing
|
|
|
|
Routing PW Sewer Rating | 2/9/2010 | | 2/9/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Application received | | 2/5/2010 | 2/5/2010 | | DONE |
Tisha Gallop
|
|
|
|
Intake Approval | | | 2/5/2010 | | PASS |
|
|
|
|
Pending Assignment by JCB | 2/5/2010 | | 2/5/2010 | | DONE |
Jason Blais
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/5/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/5/2010 | | DONE |
Tisha Gallop
|
|
|
|