Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD10-00240
StatusFinaled
Name TRADITION CUSTOM HOMES
Site Address 2782 S KYLEE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,644 sq.ft., two story (first story 2,082 sq. ft., second story 1,562 sq. ft.) with 5 bedrooms, 3 1/2 bathrooms, approximately 289 sq. ft. of covered patio/porch and a 1,124 sq.ft. attached garage. All work to be done per the approved plans, plan review report, attached engineering and any notations. R-1B zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/9/20106/10/20106/10/2010APASS
DetailsMike Jordan
Randy-PLease call for access information Phone #: ###-####
DOC - Permit Finaled6/10/20106/10/20106/10/2010PPASS
DetailsMike Jordan
Certificate of occupancy issued.
BLD-Energy code compliance4/14/20104/15/20104/15/2010APASS
DetailsMike Jordan
Randy Walker Phone #: ###-####. ok for sheetrock.
BLD-Energy code compliance4/15/20104/15/20104/15/2010PCANC
DetailsMike Jordan
BLD-Energy code compliance4/14/20104/14/20104/14/2010PPASS
DetailsMike Jordan
Needs to block off vents to unfinished storage area or provide insulation.
BLD-Framing/Rough-in4/13/20104/14/20104/14/2010PPASS
DetailsMike Jordan
Randy Phone #: ###-####. All framing issues have been resolved. Contractor to leave engineering paperwork.
BLD-Framing/Rough-in4/9/20104/12/20104/12/2010AFAIL
DetailsMike Jordan
randy Phone #: ###-####. Pull mech permit for fireplace. Nail off all simpson hangars. Provide draftstop at open web floorjoist. Engineer to provide alternante connection at main entry, A35 no used...c/n posted. ok to insul.
BLD-Foundation3/4/20103/4/20103/4/2010APASS
DetailsMike Jordan
10:30 Am Inspection requested from web by: Jay Jones Phone #: ###-####
BLD-Footing3/2/20103/3/20103/3/2010APART
DetailsMike Jordan
Inspection requested from web by: Jay Jones Phone #: ###-####.. work in progress on installing reinforcement at south east portion of footing at shear locations.
Issue PAID IN FULL permit  2/26/2010 DONE
DetailsTisha Gallop
OVERRIDE  2/25/2010  
Route to Impact Fee Review2/8/20102/11/20102/25/2010 PASS
DetailsCindy M. Gould
Inspection Record Card- Bld  2/25/2010 DONE
Details
Telephone call  2/25/2010 DONE
Details
T/C W SPENCER AT ###-#### - PERMIT READY AND FEES GIVEN
Permit Ready to Issue  2/25/2010 DONE
Details
Plan assigned to (CDM)2/8/20102/8/20102/24/2010 DONE
DetailsCarl D Madsen
Routing - PLAN CHECK2/10/2010 2/24/2010 PASS
DetailsCarl D Madsen
Case Summary (BLD)  2/24/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/24/2010  
Routing - PUBLIC WORKS2/9/2010 2/10/2010 PASS
DetailsConnie Baumgartner
Routing - PLANNING2/9/2010 2/9/2010 PASS
DetailsDavid Moser
Approved as redlined; driveway landscape buffer shall be 3 feet wide and 2nd floor bay window on north side shall be removed because it cantilevers into setback.
Routing - Addressing2/8/2010 2/9/2010 PASS
DetailsApril Wing
Application received 2/8/20102/8/2010 DONE
DetailsTisha Gallop