Permit NumberBLD10-00257
StatusFinaled
Name WORLD CYCLE
Site Address 1407 W STATE ST
Project NameWORLD CYCLE
Customer Number 
ePlanReviewNo
Description
(WORLD CYCLE) This building is not fire sprinklered. To remodel an existing building (4,680 square feet grade level and 396 square feet mezzanine level) to be used for bicycle assembly and retail sales. A new entry awning will be constructed and an existing mezzanine expanded (from about 195 square feet to 396 square feet). Work for the awning includes steel beams, galvanized steel roof deck, and angled support rods. Work for the mezzanine expansion includes concrete footings, steel columns, a bearing wall, a wood beam, wood joists, wood sheathing, and a wood stairway. Other work includes interior nonbearing partial height walls, 2 dressing rooms, 2 new bay windows, concrete sidewalk, exterior sliding glass exit doors with break-away door leaves, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, with the structural design and calculations, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 9/19/20109/24/2010 DONE
First Notice 9/3/20109/9/2010 DONE
BLD-Final8/24/20108/24/20108/24/2010PPASS
DetailsTony Young
don Phone #: ###-####
Permanent Occupancy  8/24/2010 DONE
Zoning Approval8/18/20108/19/20108/23/2010 PASS
DetailsAndrea Tuning
BLD-Final7/27/20107/28/20107/28/2010APASS
DetailsTony Young
all permits paid
Temporary Occupancy UNPAID FEE  6/14/2010  
Temporary Occupancy UNPAID FEE  6/14/2010 DONE
BLD-Final6/10/20106/11/20106/11/2010PPART
DetailsTony Young
don Phone #: ###-####,,
need zoning, ACHD,, temp ok,, need address facing State st.
FIRE-Final Inspection6/11/20106/11/20106/11/2010PPASS
DetailsForrest France
Reinspection passed for noted correction items. Comments # 10 and 11 on the fire code review are not applicable- building is not equipped with a fire alarm system. HVAC units are below min. cfm to require duct detectors.
FIRE-Final Inspection6/10/20106/11/20106/11/2010AFAIL
DetailsForrest France
Missing building address numbers per review note #2, one exit sign per plan review red-lines needs to be relocated. EM lighting passed.
BLD-Other4/13/20104/14/20104/14/2010APASS
DetailsTony Young
Don Phone #: ###-####,, ok to cover now,,
BLD-Framing/Rough-in4/13/20104/13/20104/13/2010PPART
DetailsTony Young
Don Phone #: ###-####,, frame ok but need plumbing signed off in walls
BLD-Footing3/23/20103/24/20103/24/2010PPASS
DetailsTony Young
don Phone #: ###-####
2 interior pad ftgs,, one bearing wall int footing ok
Telephone call  3/16/2010 DONE
t/c w robert at ###-#### - permit ready and fees given
Permit Ready to Issue  3/16/2010 DONE
Details
Issue PAID IN FULL permit  3/16/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK3/12/2010 3/15/2010 DONE
DetailsCarl Westfall
Plans came back from ESC.
PLANS/APPL TAKEN TO FRONT DESK  3/15/2010  
Print Occupancy Form  3/15/2010 DONE
Details
Plan assigned to (CJW)2/11/2010 3/15/2010 PASS
DetailsCarl Westfall
3/15/2010 14:39:47 CJW - activity updated through activity BLDA022 from case BLD10-00257.
Routing - Addressing2/11/2010 3/15/2010 PASS
DetailsApril Wing
Routing - PLAN CHECK3/1/2010 3/12/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
Routing - Erosion and Sediment  3/12/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the ESC permit's attached conditions. ESC10-00115
Plan resubmittals received  3/12/2010  
DetailsTisha Gallop
received transmittal, ACHD letter, two copies of plan sheet AS-101; taken to Carl Westfall
Plan resubmittals received  3/9/2010  
DetailsTisha Gallop
received transmittal, architects response, engineers response, two copies of (2)SGS reports, supplemental structural calculations and plan sheets G-001, G-002, AS-101, AD-101, A-101, A-102, A-202, A-301, A-501, A-601, S-101; taken to Carl Westfall
Routing - FIRE2/25/20102/25/20103/1/2010 PASS
DetailsScott Arellano
Please, see attached comments.
1st review completed  3/1/2010 FAIL
Failed Plan Check and ESC
Route to Impact Fee Review2/25/20103/2/20102/25/2010 PASS
DetailsCindy M. Gould
Tenant improvement no fees
Routing - PLAN CHECK2/16/2010 2/25/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 22, 2010 and finished on February 25, 2010. Revised drawings were required. See the plan review report.
Routing - Design Review2/16/2010 2/16/2010 PASS
DetailsAndrea Tuning
Andrea Tuning - DRH10-00010
Routing - Erosion and Sediment1/12/2010 2/16/2010 FAIL
DetailsSteven Webb
ESC permit application does not include a certified RP.
Routing PW Sewer Rating2/12/2010 2/12/2010 PASS
DetailsConnie Baumgartner
Routing - PUBLIC WORKS2/11/2010 2/12/2010 PASS
DetailsBeverly Hall
Pending Assignment by JCB2/10/2010 2/11/2010 DONE
DetailsJason Blais
Application received 2/9/20102/10/2010 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  2/10/2010 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  2/10/2010 DONE
DetailsTisha Gallop