Telephone call | | | 12/3/2010 | | DONE |
Tisha Gallop
|
|
|
tt matt from HC Co. he said to send final fees to tenant at the address and contact info he gave.
|
Third Notice | | 11/8/2010 | 10/28/2010 | | DONE |
|
|
|
|
Telephone call | | | 10/28/2010 | | DONE |
Tisha Gallop
|
|
|
called Matt Smith/HC Co. to verify final value he put on COV was correct since such a great increase in value. He said it is correct the orginal scope was just for a bathroom but scope ended up as TI to other parts of the building.
|
Third Notice | | 10/12/2010 | 10/25/2010 | | DONE |
|
|
|
faxed
|
Second Notice | | 9/5/2010 | 10/7/2010 | | DONE |
|
|
|
|
First Notice | | 8/26/2010 | 8/26/2010 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/16/2010 | | DONE |
|
|
|
|
BLD-Final | 8/12/2010 | 8/13/2010 | 8/13/2010 | P | PASS |
Dave Hannah
|
|
|
darren Phone #: ###-####
|
BLD-Final | 8/6/2010 | 8/9/2010 | 8/12/2010 | P | FAIL |
Dave Hannah
|
|
|
Darren Phone #: ###-#### hand rails
|
FIRE-Final Inspection | 8/6/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Forrest France
|
|
|
Life safety is accpetable pending approved door hardware at the north exit- to be verified for compliance by the structural inspector. See red lined plan general notes items (K) and (L) for details.
|
BLD-Conference | 8/3/2010 | 8/4/2010 | 8/4/2010 | A | PASS |
Dave Hannah
|
|
|
Darren Phone #: ###-####
|
FIRE-Final Inspection | 8/2/2010 | 8/3/2010 | 8/3/2010 | A | FAIL |
Forrest France
|
|
|
Door hardware at two locations is not compliant, need to post one PFE at each floor level as discussed.
|
BLD-Conference | 6/21/2010 | 6/22/2010 | 6/22/2010 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 5/27/2010 | 5/28/2010 | 5/28/2010 | A | PASS |
Dave Hannah
|
|
|
Darren Phone #: ###-####
|
BLD-Conference | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Dave Hannah
|
|
|
Please call 1/2 hour upon arrival, thanks. Inspection requested from web by: Darren Gossett Phone #: ###-####
|
Issue PAID IN FULL permit | | | 5/6/2010 | | DONE |
Tisha Gallop
|
|
|
|
Change Expiration Date Only | | | 4/22/2010 | | DONE |
|
|
|
|
OVERRIDE | | | 2/26/2010 | | |
|
|
|
|
Telephone call | | | 2/26/2010 | | DONE |
Barbara Stitt
|
|
|
Called left Cornell Larson a voice message that permit is ready, fees due, need GC and RP information @9:15am on 2-26-10///BAS
|
Print Occupancy Form | | | 2/26/2010 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/26/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - PLAN CHECK | 2/19/2010 | | 2/25/2010 | | PASS |
Tim L. Woodard
|
|
|
Plans approved with redlines and plan review report. TLW
|
Plan assigned to (TLW) | 2/17/2010 | | 2/25/2010 | | PASS |
Tim L. Woodard
|
|
|
2/25/2010 15:33:24 TLW - activity updated through activity BLDA022 from case BLD10-00294.
|
Routing - Addressing | 2/17/2010 | | 2/25/2010 | | PASS |
April Wing
|
|
|
Signed off on Public Works Review Sheet.
|
Routing - FIRE | | | 2/25/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 2/25/2010 | | PASS |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/25/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/25/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Routing - PUBLIC WORKS | | | 2/19/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Routing PW Sewer Rating | 2/19/2010 | | 2/19/2010 | | PASS |
Connie Baumgartner
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/17/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/17/2010 | | DONE |
|
|
|
|
Application received | | 2/16/2010 | | | |
|
|
|
|