Case Summary (BLD) | | | 1/23/2013 | | DONE |
|
|
|
|
Second Notice | | 9/5/2010 | 9/8/2010 | | DONE |
|
|
|
|
First Notice | | 8/14/2010 | 8/26/2010 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 8/4/2010 | | DONE |
|
|
|
|
BLD-Final | 7/21/2010 | 7/23/2010 | 7/23/2010 | P | PASS |
Dave Hannah
|
|
|
Please contact Brandon to schedule a time to meet at the site for the inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
FIRE-Final Inspection | 7/21/2010 | 7/23/2010 | 7/23/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed. Project related fire alarm work has been finaled.
|
BLD-Final | 7/19/2010 | 7/20/2010 | 7/20/2010 | A | NR |
Dave Hannah
|
|
|
Please contact Brandon at the referenced phone number to set up time to meet for inspection. Phone #: ###-#### >> Inspection requested via web by Brandon McCurdy
|
BLD-Other | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Dave Hannah
|
|
|
Please contact Brandon McCurdy at ###-#### to set up a time for scheduled inpection. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover ceiling
|
BLD-Other | 4/26/2010 | 4/26/2010 | 4/26/2010 | P | PASS |
Dave Hannah
|
|
|
Request ceilin inspection in areas that construction occured. Please contact Brandon McCurdy @ ###-#### to set up a time to meet at the site. Thanks. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover ceiling grid
|
BLD-Framing/Rough-in | 4/9/2010 | 4/9/2010 | 4/9/2010 | P | PASS |
Dave Hannah
|
|
|
Please contact Brandon McCurdy @ ###-#### about 1/2 hour prior to inspection. Inspection requested from web by: Brandon McCurdy Phone #: ###-#### ok to cover after elec rough in is completed
|
Issue PAID IN FULL permit | | | 4/1/2010 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/1/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/1/2010 | | DONE |
|
|
|
t/c w matt at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 3/1/2010 | | DONE |
|
|
|
|
Plan assigned to (TLW) | 2/19/2010 | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
2/26/2010 13:57:04 TLW - activity updated through activity BLDA022 from case BLD10-00338.
|
Routing - PLAN CHECK | 2/19/2010 | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
Plans approved with plan review report. TLW
|
Routing - FIRE | | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify, obtain all alarm and spinkler system permits required. TLW
|
1st review completed | | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | 2/19/2010 | 2/19/2010 | | DONE |
Darla L Downs
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2010 | | |
|
|
|
ok per Tim Woodard for a level 1 intake
|