Third Notice | | 11/5/2010 | 10/28/2010 | | DONE |
|
|
|
|
Third Notice | | 10/16/2010 | 10/22/2010 | | DONE |
|
|
|
mailed
|
Second Notice | | 10/7/2010 | 10/11/2010 | | DONE |
|
|
|
|
First Notice | | 9/12/2010 | 9/27/2010 | | DONE |
|
|
|
|
BLD-Aging Inspection | 9/2/2010 | 9/2/2010 | 9/2/2010 | | PASS |
Tom Arcoraci
|
|
|
|
Permanent Occupancy | | | 9/2/2010 | | |
|
|
|
|
BLD-Final | 6/28/2010 | 6/29/2010 | 6/29/2010 | P | PASS |
Tom Arcoraci
|
|
|
akil Phone #: ###-####
|
FIRE-Final Inspection | 6/28/2010 | 6/29/2010 | 6/29/2010 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The owner was going to have the inoperative exit sign over the deleted door removed by the time the building inspector arrived.
|
BLD-Aging Inspection | 5/25/2010 | 5/25/2010 | 5/25/2010 | | PART |
Tom Arcoraci
|
|
|
|
FIRE-Conference | 3/24/2010 | 3/25/2010 | 3/25/2010 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the door hardware is removed, door locked and the exit sign removed or blanked off on the east storefront door as per the approved plans.
|
BLD-Final | 3/23/2010 | 3/24/2010 | 3/24/2010 | A | NR |
Tom Arcoraci
|
|
|
akil Phone #: ###-####
|
Print Occupancy Form | | | 3/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
Permit Ready to Issue | | | 3/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/1/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Akil @ ###-#### that permit is ready, fees due and need GC info @ 10:30am on 3-1-10///BAS
|
Issue PAID IN FULL permit | | | 3/1/2010 | | DONE |
|
|
|
Owner is GC see attached form
|
Plan assigned to (TLW) | 2/19/2010 | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
Plans approved with redlines. TLW
|
Routing - PLAN CHECK | 2/19/2010 | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
Plans approved with redlines. TLW
|
Routing - FIRE | | | 2/26/2010 | | PASS |
Tim L. Woodard
|
|
|
Field Verify
|
1st review completed | | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Case Summary (BLD) | | | 2/26/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/19/2010 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/19/2010 | | DONE |
|
|
|
|
Application received | | 2/19/2010 | | | |
|
|
|
|