(CERAMICA) The North wall of this tenant space is required to be a 2-hr fire wall. This building is fire sprinklered. To remodel an existing tenant space for a new retail sales pottery shop. Floor area from this tenant space and from an adjacent tenant space will be used to create a 241 square foot restroom core that will serve both tenant spaces. This tenant space will have a floor area of about 1,941 square feet. Work is to include interior nonbearing walls, interior doors, accessible high and low drinking fountains, and finishes. Both restrooms within the restroom core are required to be accessible to the disabled as defined by current standards. Work also includes completing a 2-hr fire wall. The fire wall is located at grid line 9 as defined by permit BLD04-02464. An existing 90 minute roll down fire door will be relocated and made operational to protect the opening under the covered walkway. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/10/20107/9/2010 DONE
Third Notice 5/15/20105/27/2010 DONE
faxed
Second Notice 5/6/20105/10/2010 DONE
First Notice 4/19/20104/26/2010 DONE
Permanent Occupancy UNPAID FEE  4/9/2010 DONE
FIRE-Final Inspection4/7/20104/7/20104/7/2010APASS
DetailsForrest France
Correction notice item finished, fire life safety final approved.
BLD-Other4/7/20104/7/20104/7/2010ADONE
DetailsForrest France
On site functional testing of the relocated automatic fire door completed satisfactory and within allowable closure rates per NFPA 80.
BLD-Final4/7/20104/7/20104/7/2010APASS
DetailsJim Storey
final ok card not avalable to sign.
BLD-Other4/7/20104/7/20104/7/2010APASS
DetailsJim Storey
fire door actuation test.
BLD-Conference4/6/20104/6/20104/6/2010APASS
DetailsJim Storey
BLD-Conference4/5/20104/6/20104/6/2010PCANC
DetailsJim Storey
FIRE-Final Inspection3/26/20103/26/20103/26/2010APART
DetailsForrest France
ref. NFPA 80 regarding min. and max closure rate for the relocated fire door- (6"/sec. - 24"/sec.).
BLD-Final3/25/20103/25/20103/25/2010PPART
DetailsJim Storey
mike Phone #: ###-#### ti ok to occupnance work on fire shudder in progress. temp isued.
FIRE-Final Inspection3/24/20103/25/20103/25/2010APART
DetailsForrest France
Fire life safety inspection completed satisfactory, noted corrections finished within the tenant space. Final pending completion and testing of the relocated automatic fire door at the exterior canopy per scope of pemit work.
FIRE-Conference3/24/20103/24/20103/24/2010PDONE
DetailsForrest France
On site visit regarding fire life safety inspection items including exit signs, EM lights, door hardware, etc.
BLD-Conference3/24/20103/24/20103/24/2010APASS
DetailsJim Storey
door being relocated
BLD-Conference3/22/20103/22/20103/22/2010APASS
DetailsJim Storey
reviewed relocation of 2 hr fire shudder for compliant applacation to protect canopy opening.
BLD-Framing/Rough-in3/16/20103/17/20103/17/2010APASS
DetailsJim Storey
mike Phone #: ###-####
Telephone call  3/16/2010 DONE
Details
t/c w pat at ###-#### - permit ready and fees given
Permit Ready to Issue  3/16/2010 DONE
Details
Issue PAID IN FULL permit  3/16/2010 DONE
DetailsTisha Gallop
Plan assigned to (CJW)2/24/2010 3/15/2010 PASS
DetailsCarl Westfall
3/15/2010 13:34:50 CJW - activity updated through activity BLDA022 from case BLD10-00368.
Routing - PLAN CHECK3/4/2010 3/15/2010 PASS
DetailsCarl Westfall
Drawings approved after the resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  3/15/2010 DONE
Print Occupancy Form  3/15/2010 DONE
Details
Plan resubmittals received  3/12/2010  
received 2 copies of sheet A1.0 sent to Carl W
Plan resubmittals received  3/10/2010 DONE
received 1 response letter,and 2 copies of sheet A1.1 sent to Carl W.
Plan resubmittals received  3/5/2010  
DetailsTisha Gallop
received response letter and two copies of plan sheets A1.0, A1.1; taken to Carl Westfall
Routing - FIRE3/2/20103/2/20103/4/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/4/2010 FAIL
Failed Plan Check
Route to Impact Fee Review3/2/20103/5/20103/3/2010 PASS
DetailsCindy M. Gould
Tenant improvement no impact fees
Routing - PLAN CHECK2/25/2010 3/2/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on February 26, 2010 and finished on March 2, 2010. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS2/24/2010 2/25/2010 PASS
DetailsConnie Baumgartner
Routing - Erosion and Sediment  2/25/2010 PASS
DetailsSteven Webb
ESC plan waiver is approved according to the attached conditions. ESC10-00154
Routing PW Sewer Rating2/25/2010 2/25/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing2/24/2010 2/24/2010 PASS
DetailsApril Wing
Plans ACCEPTED BY PLAN TECH  2/24/2010 DONE
Recd Pcfee & Taken To Pln CK  2/24/2010 DONE
Pending Assignment by JCB2/24/2010 2/24/2010 DONE
DetailsJason Blais
Application received 2/23/20102/23/2010 DONE
DetailsAlexandra L. DeYoung