Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD10-00378
StatusFinaled
Name HARRIS CONSTRUCTION
Site Address 455 E CAVE CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 3,297 sq. ft. two story (first story1,101, second story 2,196 sq. ft.) with 3 bedrooms, 3 1/2 bathrooms and a 1,128 sq. ft. attached garage. All work to be done per the approved plans, plan review report and any notations. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. R-1A zoning and setbacks per planning. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/14/20109/16/20109/16/2010APASS
DetailsTony Young
joe Phone #: ###-#### - please call 1/2 hr prior
DOC - Permit Finaled9/16/20109/16/20109/16/2010PPASS
DetailsTony Young
c of o issued
BLD-Grading Inspection9/16/20109/16/20109/16/2010PDONE
DetailsTerry Records
Final grading and drainage aproved.
BLD-Energy code compliance6/4/20106/8/20106/8/2010APASS
DetailsTony Young
joe - please call 1/2 hr prior so he can meet you there Phone #: ###-####
BLD-Framing/Rough-in6/2/20106/4/20106/4/2010APART
DetailsTony Young
joe - please call 1/2 hr prior so he can meet you there Phone #: ###-####,, will need a letter of compliance from structural engineer at final,,, need seal in all holes,, fire blocks,, straps on beams/plates etc.,, fill all nail holes in all hangers,, interior stairs will be done at final,, ok to insulate
BLD-Framing/Rough-in5/11/20105/12/20105/12/2010APART
DetailsTony Young
Joe Harris-Shear Nail inspection-ask for Odie if questions Phone #: ###-####,, exterior shear ok
BLD-Framing/Rough-in5/11/20105/11/20105/11/2010PFAIL
DetailsTony Young
Joe Harris-Shear Nail inspection-ask for Odie if questions Phone #: ###-####,, need to nail per plan
BLD-Foundation4/6/20104/6/20104/6/2010APART
DetailsTony Young
ian Phone #: ###-####,, ok to pour when ready,, conference on sill bolts,, double plates, ,, some bolts are 8" on center
BLD-Foundation4/5/20104/5/20104/6/2010PPART
DetailsTony Young
ian Phone #: ###-####,, work in progress
BLD-Foundation4/2/20104/5/20104/5/2010ANR
DetailsTony Young
ian Phone #: ###-####,, too much ice on scaffolding to see,,
BLD-Footing3/23/20103/24/20103/24/2010APASS
DetailsTony Young
ian Phone #: ###-####
BLD-Footing3/22/20103/23/20103/23/2010PPART
DetailsTony Young
ian Phone #: ###-####
PubWorks Subgrade Approval3/23/20103/23/20103/23/2010 DONE
DetailsTerry Records
Footing subgrade approved by the geotechnical engineer
Plan assigned to (CDM)3/12/20103/12/20103/12/2010 PASS
DetailsCarl D Madsen
3/12/2010 10:55:15 CDM - activity updated through activity BLDA022 from case BLD10-00378.
Route to Impact Fee Review2/25/20103/2/20103/12/2010 PASS
DetailsCindy M. Gould
Case Summary (BLD)  3/12/2010 DONE
1st review completed  3/12/2010 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/12/2010  
Inspection Record Card- Bld  3/12/2010 DONE
Details
Permit Ready to Issue  3/12/2010 DONE
Telephone call  3/12/2010 DONE
called left message with Joe permit ready and fee given. Also need GC FORM 3-12-10 DLD
Issue PAID IN FULL permit  3/12/2010 DONE
Routing - PLAN CHECK3/11/2010 3/12/2010 PASS
DetailsCarl D Madsen
Carl M. Engineering calculations are required. Requested engineering calculations and special inspection start-up form from the architect on 3-11-10 CDM
Routing - Erosion and Sediment3/10/2010 3/11/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the permit's attached conditions. ESC10-00159
Plan resubmittals received  3/10/2010  
Rec'd 2 narratives and 2 copies of sheet C1.2
Routing - Erosion and Sediment3/4/2010 3/5/2010 FAIL
DetailsSteven Webb
Re-submittal incomplete, refer to ESC activities for further details. ESC10-00159
Plan resubmittals received  3/4/2010 DONE
received 1 transmittal letter and 2 copies of full sheets C1.2 and 2 copies of sheet C1.2 ON 11X17 sheet taken to Carl Madson.
Routing - FIRE3/2/2010 3/3/2010 PASS
DetailsScott Arellano
No fire sprinklers required...
Routing - Erosion and Sediment3/1/2010 3/2/2010 FAIL
DetailsSteven Webb
ESC plan does not meet requirement per BMC 8-17, e-mailed plan checklist to applicant, Harris Construction; re-submittal is required.
Routing - PLANNING2/26/2010 3/1/2010 PASS
DetailsCody Riddle
Routing PW Grading-Hillside2/25/2010 2/26/2010 PASS
DetailsTerry Records
Approved as Category 1 by CFH10-00003
Routing - PUBLIC WORKS GRADING  2/26/2010 PASS
DetailsConnie Baumgartner
Routing - Addressing2/25/2010 2/25/2010 PASS
DetailsApril Wing
Application received 2/25/2010