Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00390
StatusFinaled
Name BABCOCK LLC
Site Address 1355 N CLOVERDALE RD
Project NameTUMBLETIME DAYCARE
Customer Number 
ePlanReviewNo
Description
(MAIN ENTRY CANOPY) Construct a 196 sq. ft. canopy over the main entry landings, stair and ramp. Construction to be 4"x 4" posts supported on 12" square or 14" round footings extending below frost (24" below grade) with metal post base support; 2" x 6" joists at 12" o.c. supported by (2) 1-3/4" x 9-1/4" LVL bolted to wood columns at one end and joist hangers connected to a ledger at the existing building. The ledger is connected to wall framing of the existing building by (2) 1/2" x 6" lag bolts at each stud, 24" O.C. Lag bolt hole are to be predrilled to avoid splitting of materials. All mechanical anchor devices shall be installed per the manufactures installation instruction for the proposed use. All wood products exposed to the elements shall be treated for the proposed use per the product manufacture. Evidence of compliance to be available at job site for inspectors verification and approval. CUP08-00117 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 4/22/20104/26/2010 DONE
First Notice3/26/20103/26/20104/12/2010 DONE
DetailsMike Jordan
BLD-Final3/26/20103/26/20103/26/2010PPASS
DetailsMike Jordan
Joe-Please call at least 20 mins prior to inspection Phone #: ###-####
DOC - Permit Finaled3/26/20103/26/20103/26/2010PPASS
DetailsMike Jordan
Letter of compliance was issued.
BLD-Footing3/8/20103/8/20103/8/2010PPASS
DetailsMike Jordan
Jill-PLease call at least 20 mins to inspection so he can meet ya there Phone #: ###-####. Inspected footings for 4x4 post. footings constructed as approved per approved plans. Also went over all hardware requirements. LVL requirements and requirements needed for metal decking that was installed. Also noted correct type and grade of lumber that was already installed.
Inspection Record Card- Bld  3/3/2010 DONE
Telephone call  3/3/2010 DONE
Details
left vm for chad at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  3/3/2010 DONE
Details
Issue PAID IN FULL permit  3/3/2010 DONE
DetailsTisha Gallop
Plan assigned to (DRS)2/26/20102/26/20103/2/2010 PASS
DetailsDan Stuart
3/2/2010 16:38:27 DRS - activity updated through activity BLDA022 from case BLD10-00390.
Routing - PLAN CHECK2/26/2010 3/2/2010 PASS
DetailsDan Stuart
Approved with attached plan review comments. To permit desk to issue.
Routing - PLANNING3/2/2010 3/2/2010 PASS
DetailsCody Riddle
Cody signed off on plans as no further Planning requirements.
PLANS/APPL TAKEN TO FRONT DESK  3/2/2010 PASS
with attached comments.
1st review completed  3/2/2010 PASS
DetailsDan Stuart
Application received 2/26/20102/26/2010 DONE
DetailsAlexandra L. DeYoung
Plans ACCEPTED BY PLAN TECH  2/26/2010 DONE