Permit Information
Permit NumberBLD10-00460
StatusFinaled
Name THE EWING COMPANY INC
Site Address 2315 S APPLE ST
Project NameOil Can Henry's
Customer Number 
ePlanReviewNo
Description
Oil Can Henry's - To construct a new 1,350 square foot, one story, wood framed automotive oil change, lubrication and routine maintenance facility with a 1,315 square foot service and storage basement. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 9/18/20109/15/2010 DONE
Second Notice 9/5/20109/13/2010 DONE
First Notice 8/26/20108/26/2010 DONE
BLD-Final8/13/20108/16/20108/16/2010APASS
DetailsJim Storey
Ryan Phone #: ###-####
Permanent Occupancy UNPAID FEE  8/16/2010  
PubWorks Occupancy Approval8/13/20108/13/20108/13/2010 DONE
DetailsTiffany Lowery
BLD-Final8/11/20108/12/20108/12/2010PPART
DetailsJim Storey
Ryan Phone #: ###-#### tank handles/ signage.
FIRE-Final Inspection8/9/20108/10/20108/10/2010PPASS
DetailsForrest France
Fire life safety is satisfactory pending approved door hardware is installed at the two restrooms- to be corrected and verified by the structural inspector as agreed. Contractor to contact Boise Fire Dept. regarding an operational permit for the basement tanks.
Zoning Approval8/10/20108/10/20108/10/2010 PASS
DetailsJosh Wilson
Telephone call  7/28/2010 DONE
Minor landscaping changes to include the substitution of plants and groundcover for the lawn in the narrow parking lot planter on north side of handicap space; and the elimination of the narrow bed on the south side of the buidling- sidewalk hardscape will be extended to buidling edge. OK JGW 7/28/10
BLD-Framing/Rough-in7/9/20107/9/20107/9/2010PPASS
DetailsJim Storey
ceilling gyp sheer and gyp over can lights ok
BLD-Energy code compliance7/6/20107/6/20107/6/2010PPASS
DetailsJim Storey
need to check fblk at ceilling access for tpo of wall chase for return air duct.
BLD-Framing/Rough-in7/6/20107/6/20107/6/2010PCANC
DetailsJim Storey
Ryan Phone #: ###-####
BLD-Framing/Rough-in7/1/20107/1/20107/1/2010PPART
DetailsJim Storey
ryan Phone #: ###-#### gas line aproval fo test in wall/ protect non ic can lights/ fire blk chalk and seal.
BLD-Conference6/25/20106/25/20106/25/2010PPART
DetailsJim Storey
review of ceilling diaphram detail requsting rfi as to aplacition.
BLD-Other6/7/20106/8/20106/8/2010PPASS
DetailsJim Storey
bryan - suspended slab Phone #: ###-#### rebar ok si on line for am
BLD-Framing/Rough-in5/25/20105/26/20105/26/2010ANR
DetailsJim Storey
Basement wall inspection please-Ryan Phone #: ###-#### cloned foudation insp pass/
BLD-Foundation5/26/20105/26/20105/26/2010APASS
DetailsJim Storey
Basement wall inspection please-Ryan Phone #: ###-#### rebar ok to cover.
BLD-Footing5/18/20105/18/20105/18/2010PPASS
DetailsJim Storey
Ryan Phone #: ###-#### strata si for am placement ok
Issue PAID IN FULL permit  4/27/2010 DONE
Route to Impact Fee Review4/21/20104/26/20104/23/2010 PASS
DetailsCindy M. Gould
Telephone call  4/23/2010 DONE
t/c w ken lenz at ###-####x205 - permit ready and fees given - also need RP name
Permit Ready to Issue  4/23/2010 DONE
Details
Routing - FIRE4/21/20104/21/20104/22/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
Plan assigned to (JCM)3/11/2010 4/22/2010 PASS
DetailsJohn Menard
4/22/2010 13:56:12 JCM - activity updated through activity BLDA022 from case BLD10-00460.
1st review completed  4/22/2010 FAIL
Failed Public Works & Structural
Routing - PLAN CHECK4/22/2010 4/22/2010 PASS
DetailsJohn Menard
PLANS/APPL TAKEN TO FRONT DESK  4/22/2010 DONE
DetailsJohn Menard
Print Occupancy Form  4/22/2010 DONE
Case Summary (BLD)  4/21/2010  
Routing - PLAN CHECK4/16/2010 4/21/2010 PASS
DetailsJohn Menard
Plan Reviewer's activity  4/21/2010 PASS
DetailsJohn Menard
Reviewed and approved structural revisions and nonstructural items. JCM
Route to Impact Fee Review3/11/20103/16/20104/20/2010 PASS
DetailsCindy M. Gould
Routing - PUBLIC WORKS4/13/2010 4/16/2010 PASS
DetailsBeverly Mountain
Plan resubmittals received  4/15/2010  
DetailsTisha Gallop
received transmittal, O & M Manual, and five copies of sheet 3; inserted into plans by LEG and taken back to Public Works.
Routing PW Drainage4/14/2010 4/14/2010 PASS
DetailsBrian Murphy
Plan resubmittals received  4/13/2010  
DetailsTisha Gallop
received two copies of resonse, structural review comments, revised structural calculations, supplemental structural calcs, copy of e-mail from engineer, S4.01 (two full size and two 11" x 17"); inserted by LEG and taken back to John Menard.
Routing - PLAN CHECK4/13/2010 4/13/2010  
DetailsJohn Menard
Routing - PUBLIC WORKS4/8/2010 4/12/2010 FAIL
DetailsConnie Baumgartner
Failed by Brian Murphy in drainage - contact at ###-####
Routing PW Drainage4/8/2010 4/12/2010 FAIL
NEEDS LETTER FROM FOUNDATION ENGINEER. BRIAN MURPHY ###-####
Routing PW Street Lights4/12/2010 4/12/2010 PASS
DetailsHank Alarcon
STREET LIGHT CONDITION DROPPED 04/12/2010
Routing - PLAN CHECK4/7/2010 4/8/2010  
DetailsJohn Menard
John Menard
Routing - PLANNING4/7/2010 4/7/2010 PASS
DetailsJosh Wilson
DRH09-00215
Routing - PLANNING4/6/2010 4/7/2010 PASS
DetailsJoshua Johnson
Routed to Josh Wilson for DR approval
Routing - PLUMBING4/5/2010 4/6/2010 PASS
DetailsBill VanDegrift
use sewer design on resubmitted sheet 4 dated 3/19/10. note 7 page P2.01 min. 36" cover. note 10 page P2.01 pipe to mop sink. DCVA in basement max. 5" above floor.
Routing PW Sewer Design3/18/2010 4/6/2010 PASS
DetailsJon R. Gunnerson
Connect onto 8-inch main on North side of parcel. Sewer Tap Permit is required.
Routing - Erosion and Sediment3/19/2010 4/5/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC permit's conditions. ESC10-00185
Routing Off Site - STRUCTURAL3/11/2010 3/29/2010 FAIL
DetailsJohn Menard
Called Action Couriers for pick-up - Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  3/29/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Plan resubmittals received  3/19/2010 DONE
DetailsTisha Gallop
received four copies of plan sheet 4; inserted by eng. rep. and taken back to ESC.
Routing PW Environmental  3/19/2010 PASS
DetailsWalt Baumgartner
bulk fluids storage in basement area, no floor drains noted on plans
Routing PW Solid Waste  3/18/2010 PASS
DetailsPeter J. McCullough
Use of existing enclosure, no new enclosures permitted.
Routing PW Sewer Rating3/17/2010 3/18/2010 PASS
DetailsConnie Baumgartner
Routing PW Drainage3/12/2010 3/17/2010 FAIL
DetailsBrian Murphy
NEEDS BETTER INFO ON 3 FEET SEPERATION FROM GOUND WATER BRIAN MURPHY ###-####
Routing PW Street Lights3/16/2010 3/17/2010 FAIL
DetailsHank Alarcon
Street lighting plan must be submitted for reviewed and approved by Public Works, lights must be installed to I.E.S. standard and
the Idaho Standards for Public Works Construction (ISPWC).
Routing - Addressing3/12/2010 3/12/2010 PASS
DetailsApril Wing
Routing - PLANNING Land Div3/11/2010 3/11/2010 PASS
DetailsDave Abo
Lot 1, Block 1 of Surrey Crossing Subdivision.
Pending Assignment by JCM3/11/2010 3/11/2010 BLDA
DetailsJohn Menard
3/11/2010 10:40:36 JCM - activity updated through activity BLDA166 from case BLD10-00460.
Plans ACCEPTED BY PLAN TECH  3/9/2010 DONE
DetailsBarbara Stitt
Application received 3/8/20103/8/2010 DONE
DetailsBarbara Stitt
Recd Pcfee & Taken To Pln CK  3/8/2010 DONE
DetailsBarbara Stitt
Routing - PUBLIC WORKS3/11/2010   FAIL
DetailsBeverly Hall