Permanent Occupancy | | | 5/28/2010 | | DONE |
|
|
|
|
FIRE-Final Inspection | 5/17/2010 | 5/18/2010 | 5/18/2010 | A | PASS |
Forrest France
|
|
|
Noted items on previous correction list verified for completion, inspection passed.
|
BLD-Final | 5/17/2010 | 5/18/2010 | 5/18/2010 | P | PASS |
Jim Storey
|
|
|
pam Phone #: ###-####
|
FIRE-Final Inspection | 5/13/2010 | 5/14/2010 | 5/14/2010 | P | FAIL |
Troy Cobbley
|
|
|
Provide single action lever hardware on both exit doors and provide a 2a,10bc fire extinguisher with current inspection tag as discussed.
|
BLD-Final | 4/23/2010 | 4/27/2010 | 4/27/2010 | P | NR |
Jim Sly
|
|
|
after 9am please//Dicksie Phone #: ###-#### Need fire to sign off.....Notified Dicksie.
|
FIRE-Final Inspection | 4/23/2010 | 4/27/2010 | 4/27/2010 | A | FAIL |
Forrest France
|
|
|
Life Safety Inspection failed. Tenant space needs to correct the following items:
1) Provide approved door hardware - see inspector comments on plans for details.
2) Remove the keyed locking door hardware at the West exit (Ref. IFC 1008.1.8.3).
3) Cover open receptacles and open light switch outlets in the kitchen area.
4) Install minimum 2A:10:B:C rated fire extinguisher at an accessible location for occupant use. Extinguisher shall have a current inspection tag affixed.
5) Install sign at main entrance "This Door To Remain Unlocked When Building Is Occupied."
|
Issue PAID IN FULL permit | | | 4/23/2010 | | DONE |
Tisha Gallop
|
|
|
|
Change Expiration Date Only | | | 4/22/2010 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 3/17/2010 | 3/17/2010 | 3/23/2010 | | PASS |
Carl D Madsen
|
|
|
3/23/2010 11:47:39 CDM - activity updated through activity BLDA022 from case BLD10-00539.
|
Case Summary (BLD) | | | 3/23/2010 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/23/2010 | | 3/23/2010 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2010 | | |
|
|
|
|
Print Occupancy Form | | | 3/23/2010 | | DONE |
|
|
|
|
Telephone call | | | 3/23/2010 | | DONE |
|
|
|
left message w pam for dicksie at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 3/23/2010 | | DONE |
|
|
|
|
1st review completed | | | 3/22/2010 | | FAIL |
|
|
|
|
Application received | | 3/17/2010 | 3/17/2010 | | DONE |
Tisha Gallop
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/17/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 3/17/2010 | | | | FAIL |
Carl D Madsen
|
|
|
|