Permit Information
Permit NumberBLD10-00550
StatusFinaled
Name RANDY HEMMER CONSTRUCTION LLC
Site Address 276 W BOBWHITE CT
Project NameBarbacoa Restaurant
Customer Number 
ePlanReviewNo
Description
Barbacoa Restaurant Rebuild and Addition - To rebuild an 8,170 square foot, one story, wood framed restaurant building that was destroyed by fire. The building is being reconstructed from the existing foundation up. There will also be a new 310 square foot main entry area addition on the west side of the building and a new 795 square foot addition along the south side of the building. The roof height will be increased approximately 8 feet above the original building roof height. The original approved plans are being modified to include a 400 square foot, mezzanine above the public restroom area and a 500 square foot dining area on the north east corner of the roof. The mezzanine is limited to 20 seats and the roof top dining is limited to 29 seats. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 6/4/20116/13/2011 DONE
DetailsChristina Prado
Faxed 6-13-11
First Notice 5/22/20115/25/2011 DONE
Permanent Occupancy  5/12/2011 DONE
DetailsBarbara Stitt
Print Occupancy Form  5/6/2011 DONE
DetailsTisha Gallop
Print Occupancy Form  4/27/2011 DONE
DetailsBarbara Stitt
BLD-Final4/19/20114/19/20114/19/2011PPASS
DetailsJim Storey
FIRE-Final Inspection4/18/20114/19/20114/19/2011APASS
DetailsForrest France
Corrections and adjustments completed. Fire life safety finaled.
BLD-Final4/14/20114/15/20114/19/2011ADEFR
DetailsJim Storey
FIRE-Final Inspection4/15/20114/15/20114/18/2011APART
DetailsForrest France
Reinspection scheduled 4/19 AM.
FIRE-Final Inspection4/13/20114/14/20114/14/2011AFAIL
DetailsForrest France
Construction and use of exterior canopies must comply with the requirements of NFPA 13 2007 8.15.7 (8.15.7.2 & 8.15.7.5). Remainder of final inspection issues completed acceptable. Rooftop EM light repaired while on site.
BLD-Final4/13/20114/14/20114/14/2011PCANC
DetailsJim Storey
todd Phone #: ###-####
Zoning Approval4/14/20114/14/20114/14/2011 PASS
DetailsJosh Wilson
Landscaping and building work are complete. Bond for landscaping is ok for release.
BLD-Framing/Rough-in2/15/20112/15/20112/15/2011APASS
DetailsJim Storey
BLD-Framing/Rough-in2/11/20112/14/20112/14/2011APART
DetailsJim Storey
Bob or Sadie-Steel stud inspection Phone #: ###-#### clip welding nr atchment to studs pending.
BLD-Final12/29/201012/30/201012/30/2010APART
DetailsJim Storey
Todd Phone #: ###-#### ok for temp first floor only.
FIRE-Final Inspection12/29/201012/30/201012/30/2010APART
DetailsForrest France
Temporary Occupancy approved per conditions. See permit activity notes dated 12/7. Some aspects incomplete and not approved for occupancy at this time including rooftop dining, second level VIP room, exterior stairway. No storage allowed in attic spaces.
Zoning Approval Temp12/29/201012/29/201012/29/2010 PASS
DetailsJosh Wilson
Bond for incomplete landscaping is in place. 180 day temporary occupancy approved.
PubWorks Occupancy Approval12/29/201012/29/201012/29/2010 DONE
DetailsTiffany Lowery
Plan resubmittals received  12/28/2010  
DetailsJohn Menard
Structial Plans for staircase dropped off by Jim Storey 12-28-10. Plans S2.2 & S7.3 one copy of each
BLD-Conference12/27/201012/27/201012/27/2010PPASS
DetailsJim Storey
recieved stair engineering for planreview.
BLD-Foundation12/20/201012/20/201012/20/2010PPASS
DetailsJim Storey
Jay Phone #: ###-####
BLD-Footing12/17/201012/17/201012/17/2010PPASS
DetailsJim Storey
Todd Phone #: ###-####
BLD-Conference12/10/201012/10/201012/13/2010PCANC
DetailsJim Storey
todd Phone #: ###-####
BLD-Conference12/10/201012/13/201012/13/2010APART
DetailsJim Storey
Kitchen ok to be used for training.
BLD-Framing/Rough-in12/7/201012/8/201012/8/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### 2 nd floor ok to cover.
BLD-Framing/Rough-in12/6/201012/7/201012/7/2010APART
DetailsJim Storey
Todd Phone #: ###-#### box out lid penatrations/ok to insulate
Meeting  12/7/2010 DONE
DetailsScott Arellano
Meeting to discuss building owner and General Contractors request for Temporart Certificate of Occupancy. Meeting attended by Jason Blais, Jim Storey, Mark Senteno, Angela Brosious, Scott Arellano, and General Contractor.

The Fire Code Official, Mark Senteno, has authorized a Temporary Certificate Occupancy for a time period not to exceed 90 days, under the following conditions:

1) All required means of egress shall be complete in occupied areas and all required Fire extinguishers shall be installed in accordance with approved plans.

2) Prior to commencing training of authorized restaurant personnel, the required building Fire Sprinkler System and Commercial Cooking Hood suppression systems shall be fully operational and electronically monitored by the building Fire Alarm System.

3) Prior to allowing any members of the general public into the restaurant for patronage, the required building Fire Alarm system, including Audio and Visual notification in public and common use spaces, shall be complete and fully operational in all areas accessible to the public and restaurant staff.
BLD-Concrete12/3/201012/3/201012/3/2010PPART
DetailsJim Storey
Todd Phone #: ###-#### reviewed rated walls ok to continue assemblie. ft for outside stair from roof ok to form up pending submital if change is decieded.
CHANGE STATUS TO (ISS)  11/15/2010 DONE
DetailsTisha Gallop
picked up and paid for plan mod
Case Summary (BLD)  11/15/2010 DONE
DetailsTisha Gallop
Route to Impact Fee Review10/29/201011/3/201011/10/2010 PASS
DetailsCindy M. Gould
Plan assigned to (JCM)10/21/201010/21/201011/10/2010 PASS
DetailsJohn Menard
Routing - PLAN CHECK11/2/2010 11/10/2010 PASS
DetailsJohn Menard
Plan Reviewer's activity  11/10/2010 PASS
DetailsJohn Menard
Reviewed and approved requested plan revisions for plan modification for mezzanine and roof seating. JCM
PLANS/APPL TAKEN TO FRONT DESK  11/10/2010 DONE
DetailsJohn Menard
Telephone call  11/10/2010 DONE
11-10-10 called Joe Thompson permit ready and fee given ///dld
Override - Parcel Holds  11/10/2010  
Plan resubmittals received  11/4/2010 DONE
DetailsTisha Gallop
received transmittal response from architect, response from structural engineer, response from electrical engineer, two copies of Alternat Request and two copies of plan sheets A1.5, A1.6, A7.1, S0.3, E2.2L; taken to John Menard
Routing - FIRE10/29/201010/29/201011/2/2010 PASS
DetailsScott Arellano
Please, see attached comments.
1st review completed  11/2/2010  
BLD-Conference11/1/201011/1/201011/1/2010PPART
DetailsJim Storey
call when go out//Todd ###-####
Override - Parcel Holds  11/1/2010  
Routing - PLAN CHECK10/25/2010 10/29/2010 FAIL
DetailsJohn Menard
Plan resubmittals requested  10/29/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PLANNING10/22/2010 10/25/2010 PASS
DetailsJosh Wilson
OK per DRH10-00196 with redlines
Routing - PUBLIC WORKS10/25/2010 10/25/2010 PASS
DetailsBeverly Mountain
Plan resubmittals received  10/25/2010  
received 1 transmittal, & 3 supplemental structural calcs taken to John M for review.
Plan Modification Accepted  10/21/2010  
Plan excepted for BLD10-00550 Adding mezzanine seating above public restrooms (430 st -20 seats),addingrooftop patio seating above bar@ NE corner(600 ft - 29 seats) adding exterior egress stair @ north elevation with pueblo style screen wall. adding wood corbels to exterior battered plasters per DR conditions.adding egress stair & penthouse enclosure to serve roof patio seating. pages affected G1.1,SD1.1,A1.1,A1.2,A1.4,A1.5,A1.6,A2.1,A3.1,A7.1,E2.OF,E2.2L,E2.2P,E3.2,E3.1,SO.3,S1.1,S2.1,S2.2,S8.3
BLD-Framing/Rough-in9/3/20109/7/20109/7/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### orignial approval plan and pending resumital aprovals.
BLD-Energy code compliance9/7/20109/7/20109/7/2010APASS
DetailsJim Storey
Todd Phone #: ###-####
FIRE-Conference9/3/20109/3/20109/3/2010PDONE
DetailsForrest France
Discussion regarding project related fire alarm and sprinkler permit work.
BLD-Framing/Rough-in9/2/20109/3/20109/3/2010PPART
DetailsJim Storey
Todd Phone #: ###-####
BLD-Energy code compliance8/27/20108/27/20108/27/2010PPART
DetailsJim Storey
Todd Phone #: ###-#### air seal ok
FIRE-Conference8/4/20108/5/20108/5/2010ADONE
DetailsForrest France
On site conference regarding project related fire alarm work, HVAC duct detectors, light fixture obstructions at the womens restroom, door hardware, fire code review notes, type one hood suppression, seismic clearance at the new UG fire sprinkler supply, project schedule, etc.
BLD-Conference7/19/20107/20/20107/20/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### sheer exterior ok to cover/ interior ele room ok to gyp.
BLD-Other7/13/20107/13/20107/13/2010PPASS
DetailsJim Storey
Todd Phone #: ###-#### paripets filled with blow in insulation full to comply with type of const. to not have to sprinkler the areas.
BLD-Conference7/12/20107/13/20107/13/2010APASS
DetailsJim Storey
Todd Phone #: ###-#### roof deck insulated to 6 inches to meet ec report not 4 per drawring. ok
FIRE-Conference7/12/20107/13/20107/13/2010ADONE
DetailsForrest France
Regarding insulation fill at concealed spaces.
BLD-Other7/7/20107/8/20107/8/2010PPASS
DetailsJim Storey
nail inspection//Todd Martin Phone #: ###-#### roof nailling ok per plan.
Issue PAID IN FULL permit  6/9/2010 DONE
Routing - PLANNING6/2/2010 6/7/2010 PASS
DetailsJosh Wilson
Pass with redlines Sheet SD1.1 for location of bike rack. NOTE: No Occupancy will be granted until either a recorded cross parking agreement is submitted or Condition 1a is removed by the Design Review Committee. Informed project team of this via email on 6/7/10.
Routing - PLAN CHECK6/7/2010 6/7/2010 PASS
DetailsJohn Menard
Plan Reviewer's activity  6/7/2010 PASS
DetailsJohn Menard
Reviewed and approved final structural and nonstructural revised resubmittals. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/7/2010 DONE
DetailsJohn Menard
Print Occupancy Form  6/7/2010 DONE
DetailsBarbara Stitt
Permit Ready to Issue  6/7/2010 DONE
Telephone call  6/7/2010 DONE
Called and left a voice message for Joe Thompson that permit is ready, fees due and need ACHD info on 6-7-10 @ 4:43pm BAS
Telephone call  6/7/2010 DONE
Called Randy Hemmer and told him that permit is ready, fees due and need ACHD info @ 4:50 on 6-7-10 BAS
Plan assigned to (JCM)3/19/2010 6/7/2010 PASS
DetailsJohn Menard
6/7/2010 14:13:03 JCM - activity updated through activity BLDA022 from case BLD10-00550.
Telephone call  6/4/2010 DONE
DetailsSarah Schafer
Randy H. (Contractor) called me regarding the parking agreement. He is going to try to find out if there is a copy of one. He asked if there was anyway to post some kind of bond to get the building permit released without the agreement. I told him I would speak with Hal when he gets back into the office. He also told me he would let me know what the bike rack location was. We can red linethe location on the plans for sign off. 10:30 6/4/10 SMS
Plan resubmittals received  6/3/2010 DONE
DetailsTisha Gallop
received transmittal, response, and four copies of sheet S7.1; inserted by arch. rep. and taken back to Josh Wilson.
Routing - PUBLIC WORKS6/1/2010 6/2/2010 PASS
DetailsBeverly Mountain
Routing Off Site - STRUCTURAL6/1/2010 6/2/2010 FAIL
DetailsJohn Menard
Received response from consulting engineer indicating one remaing outstanding issue to be addressed.
Plan resubmittals requested  6/2/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the second structura review requesting one additional response. JCM
Routing PW Solid Waste6/1/2010 6/1/2010 PASS
DetailsPeter J. McCullough
Revised plans for enclosure passed.
Routing - PLAN CHECK5/28/2010 6/1/2010  
DetailsJohn Menard
Plan resubmittals received  6/1/2010  
DetailsJohn Menard
rec'd response letter and four copies of sheets S0.3; S7.1; S7.2; SD1.1; A2.1 - inserted by arch rep and taken back to John M
Routing - PLANNING5/26/2010 5/28/2010 FAIL
DetailsJosh Wilson
Exterior elevations do not show required tile finish on pilasters and behind sign
Routing PW Solid Waste5/26/2010 5/27/2010 FAIL
DetailsPeter J. McCullough
Enclosure does not meet requirements.
Routing - PLAN CHECK4/21/2010 5/26/2010 FAIL
DetailsJohn Menard
Plan resubmittals requested  5/26/2010 DONE
DetailsJohn Menard
E-mailed the architect requesting additional plan revisions. JCM
Routing - PUBLIC WORKS5/26/2010 5/26/2010 FAIL
DetailsConnie Baumgartner
Plan resubmittals received  5/20/2010  
DetailsTisha Gallop
received transmittal, building response, engineers response, HVAC load calcs, submittal approvals for refrigeration walls, two copies of plan sheets G1.1, SL1.1, SL1.2, SD1.1, A0.1, A1.1, A1.2, A1.3, A1.4, A2.1, A4.1, A5.1, A5.2, A5.3, A5.4, A7.1, A9.1, S1.1, M1.0, M1.1, M1.2, M1.3, M2.0, M3.0, P1.0, P2.0, P3.0, P4.0, P4.1, E1.0, E2.0F, E2.0L, E2.0MP, E2.0P, E2.0R, E2.1, E3.0, E3.2; inserted by arch. rep. and taken back to John Menard.
Routing - FIRE4/19/20104/19/20104/21/2010 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  4/21/2010 FAIL
Failed Public Works, Structural, Plumbing, Planning, Plan Check
Route to Impact Fee Review4/19/20104/22/20104/20/2010 PASS
DetailsCindy M. Gould
Plan resubmittals requested  4/19/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK4/6/2010 4/19/2010 FAIL
DetailsJohn Menard
Routing - PLAN CHECK4/2/2010 4/6/2010  
DetailsJohn Menard
Routing - PLUMBING4/6/2010 4/6/2010 PASS
DetailsBill VanDegrift
per resubmitted plans 4/5/10 and 2003 upc
Plan resubmittals received  4/5/2010  
DetailsTisha Gallop
received transmittal sheet and three copies if plan sheets P1.0, P2.0, P3.0, P4.0, P4.1, C1.0, C1.1(new sheet), ESC-1; inserted by LEG and routed to plumbing.//Per Brian Murphy and Steve Webb plans not need to be rerouted to them, they have already approved plans and changes reflect plumbing not grading/drainage or erosion.
Routing - PLANNING4/1/2010 4/2/2010 FAIL
Building elevations do not match those approved at the March 23, 2010 Design Review work session. Contacted Joe Thompson at 10:30 am on 4/2/10.
Routing - PLUMBING3/31/2010 4/1/2010 FAIL
DetailsBill VanDegrift
1. keynote 6 page C1.0- roof drains may not be backgraded. 2. exterior roof drains must be a min. of two feet deep. 3. all floor sinks must be a min. of half exposed and accessable for cleaning. 4. indirect waste receptors must be located where wastes will not be required to run across the floor or piping from fixtures will not be in pathways. 5. tempering valves will be required on kitchen hand sinks. 6. add fixtures required by CDHD, on page K1 and K2 to the plans. 7. provide water pipe sizing data.
Received Certificate of Value  4/1/2010 DONE
DetailsTisha Gallop
received revised cert of value to break out footing/foundation, slab and underground plumbing into seperate permit, see bld10-00686. New Project value for this permit is $2,250,000 and new plumbing value is $65,000.
Routing Off Site - STRUCTURAL3/22/2010 3/31/2010 FAIL
DetailsJohn Menard
Received comment list from consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  3/31/2010 DONE
DetailsJohn Menard
E-mailed the architect a copy of the structural review requesting revisions. JCM
Routing - PUBLIC WORKS3/24/2010 3/31/2010 FAIL
DetailsConnie Baumgartner
Routing PW Environmental  3/31/2010 PASS
DetailsWalt Baumgartner
Existing in ground GI is not current approved design but inspection record suggests no sewer line issues if properly maintained. Owner shall provide for regularly scheduled cleaning and maintenance in accordance with City required Pretreatment Program Best Management Practices.
Routing PW Solid Waste3/30/2010 3/31/2010 FAIL
DetailsPeter J. McCullough
Trash enclosure does not meet required specifications. Contact Peter McCullough, ###-####. See specs at:
http://www.cityofboise.org/Departments/Public_Works/NewDevelopmentPermitApps/page29449.aspx
Routing PW Drainage3/29/2010 3/30/2010 PASS
DetailsBrian Murphy
Routing PW Street Lights3/30/2010 3/30/2010 PASS
DetailsHank Alarcon
Routing PW Flood Plain3/30/2010 3/30/2010 PASS
DetailsJim Wyllie
Building is not in floodplain as per Letter of Map Revision.
Plan resubmittals received  3/30/2010  
DetailsTisha Gallop
received five copies of plan sheet C1.0; inserted into plans by Brian Murphy.
Routing PW Sewer Design3/25/2010 3/29/2010 PASS
DetailsJon R. Gunnerson
connect onto existing sanitary sewer service provided
Routing - Addressing3/25/2010 3/25/2010 PASS
DetailsApril Wing
Routing PW Sewer Rating3/25/2010 3/25/2010 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK3/22/2010 3/24/2010  
DetailsJohn Menard
Plan resubmittals received  3/23/2010 DONE
DetailsTisha Gallop
received three copies of CDHD approved plans; taken to John Menard
Routing - Erosion and Sediment3/19/2010 3/22/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC permit's attached conditions. ESC10-00226
Pending Assignment by JCM3/19/2010 3/19/2010 BLDA
DetailsJohn Menard
3/19/2010 07:48:26 JCM - activity updated through activity BLDA166 from case BLD10-00550.
Routing - PLANNING Land Div3/19/2010 3/19/2010 PASS
DetailsDave Abo
Lot 6A, Block 3 of Parkcenter Subdivision 1A.
Application received 3/18/20103/18/2010 DONE
DetailsDarla L Downs
Plans ACCEPTED BY PLAN TECH  3/18/2010 DONE
DetailsDarla L Downs
Recd Pcfee & Taken To Pln CK  3/18/2010 DONE
DetailsDarla L Downs