Permit Information
Permit NumberBLD10-00620
StatusFinaled
Name PRECISE BUILDERS LLC
Site Address 1519 W MAIN ST Unit: 201
Project NameIKON TATTOO
Customer Number 
ePlanReviewNo
Description
(IKON TATTOO - 2ND STORY) This building is NOT fire sprinklered. To convert the 872 square foot 2nd story of an existing building from a dwelling unit to a tattoo parlor (1st story about 2,850 square feet and 2nd story about 872 square feet). The entire 2nd story was formerly a dwelling unit. Work is to include providing offset hinges on the main entrance door to increase the clear width of the doorway, removing several interior doors, reconstructing the stairway to provide 11 inch treads and 7 inch risers, and modifying the floor above the stairway to increase the headroom. Structural upgrade work includes new concrete footings, wood columns, and wood beams. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 10/14/201110/10/2011 DONE
Third Notice 9/14/20119/29/2011 DONE
faxed to GC
Second Notice 8/4/20119/9/2011 DONE
DetailsChristina Prado
Faxed 9-9-11
First Notice 7/17/20117/25/2011 DONE
Print Occupancy Form  7/7/2011 DONE
Permanent Occupancy  7/7/2011 DONE
DetailsBarbara Stitt
BLD-Final7/5/20117/6/20117/6/2011APASS
DetailsTony Young
John Phone #: ###-####,,, // ok for c of o
BLD-Final7/1/20117/5/20117/5/2011ANR
DetailsTony Young
John Phone #: ###-####,, need signage
BLD-Final7/1/20117/1/20117/5/2011PNR
DetailsTony Young
John Phone #: ###-####
BLD-Final6/30/20117/1/20117/1/2011PFAIL
DetailsTony Young
John Phone #: ###-####,, need to fix hand rail,, light, sign
FIRE-Final Inspection6/30/20117/1/20117/1/2011APASS
DetailsTroy Cobbley
Life safety passed. Tony to verify signage and repaired emergency light.
BLD-Conference4/15/20114/20/20115/5/2011AFAIL
DetailsTony Young
check status,, need to finish
BLD-Conference3/21/20114/4/20114/15/2011APEND
DetailsTony Young
check status
BLD-Conference3/21/20113/21/20113/21/2011PFAIL
DetailsTony Young
check status,, job still active but need to finish
BLD-Conference1/18/20111/19/20111/19/2011APART
DetailsTony Young
After 9a.m.--Ward Phone #: ###-####,, stair ?s,, head height,,, should finish out ok
BLD-Conference12/14/201012/15/201012/17/2010APART
DetailsTony Young
?s on occupancy on lower area,,, should be ok after construction is done for upper area supports
BLD-Framing/Rough-in12/16/201012/16/201012/17/2010PPART
DetailsTony Young
Ward Phone #: ###-####,, down stairs ok
BLD-Framing/Rough-in12/16/201012/17/201012/17/2010APART
DetailsTony Young
Ward Phone #: ###-####,, lower area beams, posts etc ok,, now working on new stairs,, all else down stairs ok
FIRE-Final Inspection12/14/201012/15/201012/15/2010AFAIL
DetailsForrest France
See fire code review note items # 7 and 8 regarding the need for signage at the main entry/exit and EM lighting requirements. Also need to finish the scope of work at the stairs prior to final approvals.
BLD-Final12/14/201012/14/201012/14/2010PNR
DetailsTony Young
Ward Phone #: ###-####
BLD-Foundation12/3/201012/6/201012/6/2010APART
DetailsTony Young
Ward ( if possible after 10 am) Phone #: ###-####,, work in progress on new footing for post/beam load
Print Occupancy Form  11/19/2010 DONE
Telephone call  11/19/2010 DONE
t/c w ward - permit ready and fees given - also need gc and new cert of value
Permit Ready to Issue  11/19/2010 DONE
Details
Issue PAID IN FULL permit  11/19/2010 DONE
DetailsTisha Gallop
Routing - PLAN CHECK11/15/2010 11/18/2010 PASS
DetailsCarl Westfall
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/18/2010 DONE
Plan assigned to (CJW)4/1/2010 11/18/2010 PASS
DetailsCarl Westfall
1st review done
Plan resubmittals received  11/17/2010  
DetailsBarbara Stitt
Received 2 copies of sheet A1.0 and taken to Carl Westfall
Plan resubmittals received  11/16/2010 DONE
E-mail with attached revised structural calculations received.
Routing - PLAN CHECK11/5/2010 11/15/2010 FAIL
DetailsCarl Westfall
Analysis of the new column is not correct. Asked for further calculations.
Plan resubmittals received  11/11/2010 DONE
E-mail with attached calculation received.
Routing - PLAN CHECK10/20/2010 11/5/2010 FAIL
DetailsCarl Westfall
Completed the 3rd review. Additional structural analysis was required.
Plan resubmittals received  11/3/2010 DONE
DetailsTisha Gallop
received one response letter, one letter addressed to the Building Official, two copies of A1.0, and structural calculations; taken to Carl Westfall.
Routing - PLAN CHECK4/23/2010 10/20/2010 FAIL
DetailsCarl Westfall
Completed the resubmittal review. Structural engineering and revised drawings required.
Plan resubmittals received  10/12/2010 DONE
DetailsBarbara Stitt
Received 2 copies of sheets A0.0 & A1.0 and taken to Carl Westfall///BAS
Routing - FIRE4/19/2010 4/23/2010 PASS
DetailsTim Frost
1st review completed  4/23/2010 FAIL
Failed - Plan Check
Routing - PLANNING4/19/2010 4/19/2010 PASS
DetailsCody Riddle
Send to Cody
Routing - PUBLIC WORKS4/15/2010 4/19/2010 PASS
DetailsBeverly Mountain
Routing PW Sewer Rating4/19/2010 4/19/2010 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK4/1/2010 4/15/2010 FAIL
DetailsCarl Westfall
The IBC plan review was started on April 12, 2010 and finished on April 15, 2010. Revised drawings were required. See the plan review report.
Pending Assignment by JCB3/30/2010 4/1/2010 DONE
DetailsJason Blais
Plans ACCEPTED BY PLAN TECH  3/30/2010 DONE
ok per Sam Z to take in as a level 3
Recd Pcfee & Taken To Pln CK  3/30/2010 DONE
BLD-Conference5/5/20115/10/2011 A 
DetailsTony Young
check status
Application received 3/25/2010