Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD10-00636
StatusFinaled
Name CSC LLC
Site Address 6401 S EISENMAN RD Unit: 100
Project NameQuarry Business Complex 100
Customer Number 
ePlanReviewNo
Description
(CENSPORT GRAPHICS - Quarry Business Complex Ste# 100) Permit is to build out a 2,560 square foot graphics painting studio in an existing 20,268 square foot shell and core building (BLD07-00349). Approval contingent upon adhering to the approved plans on file. Work to include: [construction of interior non-bearing walls to create a fully accessible unisex bathroom, a storage room, a production floor, and offices], installation of new load bearing walls to create a new 460 square foot second floor, installation of new guard rails on mezzanine, installation of new electrical, installation of new accessible bathroom fixtures, installation of new hand sink, and finishes in compliance with chapter 8 of the 2006 IBC. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. Racking that exceeds 8 ft. in height requires a separate Building Permit be submitted and approved before installation. **TLW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/31/201012/21/2011 DONE
Third Notice 12/8/201012/17/2010 DONE
faxed
Third Notice 10/26/201011/24/2010 DONE
faxed
Second Notice 10/18/201010/21/2010 DONE
First Notice 10/3/201010/8/2010 DONE
Permanent Occupancy  9/23/2010 DONE
DetailsBarbara Stitt
BLD-Final9/21/20109/22/20109/22/2010APASS
DetailsJim Storey
call for access Phone #: ###-#### >> Inspection requested via web by David Mortensen final ok.
FIRE-Final Inspection9/16/20109/16/20109/16/2010PPASS
DetailsTroy Cobbley
life safety passed
BLD-Final9/16/20109/16/20109/16/2010PPART
DetailsJim Storey
Jim, I''ll give you a call. Kent Mortensen
I''mm filling in for Dave while he''s having surgery. Phone #: ###-#### >> Inspection requested via web by David Mortensenfinal ok pending mech sign off.
FIRE-Final Inspection9/14/20109/14/20109/14/2010ACANC
DetailsForrest France
Call for access we also need the sprinkler final to every thing is done. Phone #: ###-#### >> Inspection requested via web by David Mortensen Inspection cancelled from web by: David Mortensen
BLD-Final9/14/20109/14/20109/14/2010PCANC
DetailsJim Storey
call for access the key is gone now
come late aftern Phone #: ###-#### >> Inspection requested via web by David Mortensen Inspection cancelled from web by: David Mortensen
BLD-Final9/10/20109/10/20109/10/2010PPART
DetailsJim Storey
call first Forrest with fire has AM inspection and has now showed yet Phone #: ###-#### >> Inspection requested via web by David Mortensen c/n on site
FIRE-Final Inspection9/10/20109/10/20109/10/2010PFAIL
DetailsForrest France
Refer to activity notes for a list deficient items.
FIRE-Final Inspection9/9/20109/10/20109/10/2010AFAIL
DetailsForrest France
Provide missing building address numbers, post signage at the main entry/exit door, project related fire alarm and sprinkler permits need finaled- see correction items regarding fire sprinkler work.
FIRE-Final Inspection9/9/20109/9/20109/10/2010PNR
DetailsForrest France
Need project related fire sprinkler and alarm permit finals prior to building fire life safety approval.
BLD-Wall cover8/4/20108/5/20108/5/2010PPASS
DetailsTom Arcoraci
fire wall screw inspection type A walls
Phone #: ###-#### >> Inspection requested via web by David Mortensen
BLD-Energy code compliance8/2/20108/2/20108/2/2010PPASS
DetailsJim Storey
call for access Phone #: ###-#### >> Inspection requested via web by David Mortensen
BLD-Framing/Rough-in7/28/20107/29/20107/29/2010APASS
DetailsJim Storey
call for access Phone #: ###-#### >> Inspection requested via web by David Mortensen
BLD-Concrete6/15/20106/15/20106/15/2010PPASS
DetailsJim Storey
call for access Inspection requested from web by: David Mortensen Phone #: ###-####
BLD-Footing6/11/20106/11/20106/11/2010PPASS
DetailsJim Storey
Call for access to Building Inspection requested from web by: David Mortensen Phone #: ###-####
OVERRIDE  6/8/2010  
Issue PAID IN FULL permit  6/8/2010 DONE
Routing PW Environmental6/8/2010 6/8/2010 PASS
DetailsWalt Baumgartner
Plans revwd. Shop floor drains have been removed.
Routing - PUBLIC WORKS6/8/2010 6/8/2010 PASS
DetailsBeverly Mountain
Routing - PLAN CHECK6/8/2010 6/8/2010 PASS
DetailsTim L. Woodard
Approved
PLANS/APPL TAKEN TO FRONT DESK  6/8/2010 DONE
DetailsTim L. Woodard
Case Summary (BLD)  6/8/2010 DONE
DetailsTim L. Woodard
Print Occupancy Form  6/8/2010 DONE
Permit Ready to Issue  6/8/2010 DONE
Plan assigned to (TLW)4/14/2010 6/8/2010 PASS
DetailsTim L. Woodard
6/8/2010 13:36:07 TLW - activity updated through activity BLDA022 from case BLD10-00636.
CHANGE STATUS TO (REV)  6/7/2010 DONE
DetailsRita DeYoung
Confusion! The letter we received from WR Smith was not to void the project but to change the name to Dave Mortensen Construction INC per Tim Woodard.
MISC ACTIONS  6/7/2010  
Received letter that original applicant no longer affiliated with project. Put in parcel owners name during reveiw.
Routing - Addressing6/4/2010 6/4/2010 PASS
DetailsApril Wing
VOIDED CHANGE STATUS  6/4/2010 DONE
DetailsTisha Gallop
void project per applicant/owner William Smith. Then project is not going to be built, see scanned document. Receycled plans.
Routing - PLAN CHECK6/3/2010 6/3/2010 PASS
DetailsTim L. Woodard
Plans approved with redlines and plan review report. TLW
Routing - Erosion and Sediment6/3/2010 6/3/2010 PASS
DetailsTim L. Woodard
Waiver approved. Applicant must comply with attached conditions. TLW
Case Summary (BLD)  6/3/2010 DONE
DetailsTim L. Woodard
Plan resubmittals received  5/28/2010  
Received 1 cover letter, 2 copies of calcs, 2 copies sheets, A0.1, A2.1, A4.1, A4.3, red lined sheets, and cd and taken to Tim Woodard
Routing - PLAN CHECK5/18/2010 5/18/2010 FAIL
DetailsTim L. Woodard
Resubmittals not sufficent, 2nd Review sent out. TLW
Plan resubmittals received  5/7/2010  
DetailsTisha Gallop
received two copies of plan sheets A0.0, A0.1, A0.12, A0.2, A2.1, A4.1, A4.3; taken to Tim Woodard
Routing - PLAN CHECK3/29/2010 4/14/2010 FAIL
DetailsTim L. Woodard
Refer to plan review report. TLW
1st review completed  4/14/2010 DONE
DetailsTim L. Woodard
Plans ACCEPTED BY PLAN TECH  3/29/2010 DONE
ok per Tim Woodard for a level 2 intake
Routing - PUBLIC WORKS3/29/2010 3/29/2010 FAIL
DetailsConnie Baumgartner
Failed by Walt Baumgartner in Environmental - ###-####
Recd Pcfee & Taken To Pln CK  3/29/2010 DONE
Plan assigned to (TLW)3/29/2010 3/29/2010 DONE
DetailsTim L. Woodard
Routing - Addressing3/29/2010 3/29/2010 PASS
DetailsApril Wing
Routing PW Sewer Rating3/29/2010 3/29/2010 PASS
DetailsConnie Baumgartner
Routing PW Environmental3/29/2010 3/29/2010 FAIL
DetailsWalt Baumgartner
FAIL - 3 floor drains in warehouse must route to approved flammable interceptor prior to sewer system. Separate bathroom from floor drains and route direct to sewer. Call ###-#### Public Works Pretreatment for more information
Application received 3/26/2010